1. OVERVIEW OF RESOURCE

S.NO DESCRIPTION MAN DAY

1 MANAGEMENT 02
2 CONSTRUCTION 48
3 HSE 02
TOTAL 52

2. MAN-HOURS SPENT ON SITE

S.no SUBJECT LAST WEEKS BI WEEKLY (16 to Cumulative


30)
1 Avg. No. of men/day
34 52 43
2 Total man-power
995 677 1672
3 Total man-hours
7960 4718 12678

3. HEALTH, SAFETY AND ENVIRONMENT REPORT

BIWEE
S.no SUBJECT TOTAL
KLY(16
TO 30)
1 Near Miss Incidents (NM) Nil Nil

2 First Aid Case (FAC) Nil Nil

3 Medical Treatment Case (MTC) Nil Nil

4 Lost Time Injury (LTI) Nil Nil

5 Restricted Work Case (RWC) Nil Nil

6 Fatality Nil Nil


1
WURC HSE BI-WEEKLY REPORT

7 Total Recordable Injuries (TRI) Nil Nil

8 Motor Vehicle Accident (MVA) Nil Nil

9 Total Recordable Injuries Rate (TRIR) Nil Nil

10 Material Damage (MD) 01 01

11 Environmental Damage (ED) Nil Nil

12 Unwanted Occurrences (UO) Nil Nil

13 No. of Fire Incidents Nil Nil

14 Total No of Employees received Induction 20 52

15 Total No of HSE Toolbox 05 13

16 HSE Training conducted 06 10

17 Emergency drills conducted 01 01

18 Safety Violation (SV) Nil Nil

19 Safety Audit (SA) Nil Nil

4. INCIDENTS/ ACCIDENTS

Type of accident /
Description of accident / incident
incident

NIL NIL

5. ENVIRONMENT:

• Housekeeping conducted on a regular basis

• Proper area management maintained.

2
WURC HSE BI-WEEKLY REPORT

6. TRAINING / TOOL BOX MEETING

S.NO DATE TOPIC

01 18/03/2023
EYE SAFETY

02 19/03/2023
MANUAL HANDLING

03 20/03/2023
RAMADAN SAFETY

04 21/03/2023 FALLING PROTECTION

05 22/03/2023 PPE

06 23/03/2023 PERMIT TO WORK

07 25/03/2023 ELECTRICAL SAFETY

08 26/03/2023 FIRST AID

WORKING SAFELY WITH ABRASIVE


09 28/03/2023
WHEELS

10 29/03/2023 WASTE MANAGEMENT

12 30/03/2023 INCLEMENT WEATHER

3
WURC HSE BI-WEEKLY REPORT

HSE TRAININGS/TOOL BOX MEETINGS

4
WURC HSE BI-WEEKLY REPORT

GOOD PRACTICES

EMERGENCY EVACUATION DRILLS

STEP 1; RAISING THE ALARM STEP 2; WORKERS GATHERING TO ASSEMBLY


POINT

STEP 3; ALL STAFFS GATHERING AT THE


STEP 4; HEAD COUNT AT THE ASSEMBLY POINT
ASSEMBLY POINT.

STEP 5; BREIFING REGARDING THE IMPORTANCE STEP 6; END OF THE DRILL WORKERS
OF EMERGENCY EVACUATION RETURNING BACK TO SITE.

5
6

You might also like