You are on page 1of 1

Andhra Pradesh Water Sector Improvement Project

Consultants’ Services for Engineering Design

Second Training Programme – 2012


Training Module

INDEX

Page
Sl. No Description
No.

1 Introduction ii

2 Part I – Designs

3 Design of vertical core wall drop I-1

4 Design of vertical drop with wing walls II - 1


5 Design of glacis drop III - 1
6 Design of pipe culvert (single pipe lane) IV - 1
7 Design of pipe culvert (double pipe lane) V-1
8 Design of off take sluice (OT) VI - 1
9 Design of open flume module (OFM) VII - 1
10 Design of adjustable proportional module VIII - 1
11 Design of pipe semi module IX - 1
12 Design of cutthroat flume X-1
13 Design of standing wave flume XI - 1
14 Design of rectangular throat measuring flume XII - 1
15 C.C. canal lining XIII - 1

16 Part II – Construction Procedure

17 Earth work XIV - 1


18 Concrete work and reinforcement XV - 1
19 C.C. canal lining XVI - 1
20 Shot creting XVII - 1

APWSIP
Consultants’ Services for Engineering Design i

You might also like