EPCL

Accepted with Comments


By : Aneeshraj Baburaj Santhamma (ABS)

Date : January 29, 2018

The Contractor is liable to complete the Works in


accordance to the Contract. The review made by the
Employer/Employer's representative does not relieve
the Contractor of his Contractual liabilities and/or
responsibility to ensure or verify the accuracy of the
deliverables, Works and existing features.

Procedure qualification testing to be conducted and shall be witness by all parties


Production testing shall be done and witness by all parties
Code reference documents to be listed in ITP
EDS-B-3
Approved vendor list doc 3315-PU-LST-00001-Rev 0C and addendum 24-A-10092 Rev 0a
ISO 8501 part 1
ISO 21809 1 table 6 8 9
Reduction of pipe length to be documented as per ESR0550-27-L-SP-2003
Handling, Stacking of line pipe inspection to be specify ITP
Identification and stenciled on pipe inspection shall be specify in ITP
Measurement shall be made at 12 points uniformly spaced over length and circumference of pipe with 3 points at
least on longitudinal welds
Water Absorption test at 20 degree as per ESR0550-27-L-SP-2003 Cl 10.2
Fusion bonded epoxy powder storage shall normally be at a temperature not greater than 25 degree Celsius