You are on page 1of 2

7.

0 RESULTS AND CALCULATIONS

Falling Head Permeability Test


Location : Geotechnic Laboratory Sample no :
Operator : Date :
Soil description : Clayey Silt
Method of preparation : hand Trim Into Mould
Sample diameter, D : 100 mm Sample length, L : 130 mm
Sample area, A : 7854 mm² Sample volume, V : 1021 cm³
Mass of mould : 960 g Mass of sample+mould : 2570 g
Mass of sample : 1710 g
S.G. measured/assumed : 2.7 Voids ratio : 1.2
Bulk density, � :16.43 kN/m³ Dry Density, � : 14.94 kN/m³
Moisture content : 40 % Test temperature :
Standpipe diameter : 4.05 mm Standpipe area, a : 12.88 mm²

Reading:

Test
Reference Height above Height above Height ratios
point datum, y (mm) outlet, h (mm) Point Time, t (sec)

1. (900 mm) 340 335


1-2 10 -
2. (800 mm) 340 335

3. (700 mm) 340 335 2-3 21 -


1/√� �= 𝑞/𝐴�

You might also like