Item Reference
Comments Valdel Response Resolution
No Page / Section
Section 8.1, 8.2 & 8..3 : 20% installed spares shall be maintained after
1 Noted and incorporated
DCS, IPS and FGS implementation of this project
Noted. Different instruments will be used
Separate instruments shall be used for control and for control and safeguarding functions. As
Section 8.4 : Field
2 safeguarding. Instrument used for safeguarding shall SIL study is not part of scope, SIL 1
Instruments
be certified according to relevant SIL. certified instruments will be selected for
safeguarding functions.
Section 8.4.8 :
Heat detectors contacts shall be of normally closed
3 Miscellaneous Noted and incorporated
type
Instruments
Noted. Pair cables (instruments to JB) will
be with overall screens and Multipair
4 Field Cables Individual and overall screen
cables (from JB to Control System) shall be