PAUL BROOKS HOMOEO LABS

Standard Operating Procedure Page No. 1 of 5

Title: Maintenance & Servicing of Drop SOP No. EN-ENG-002


Tank
Revision No. ‘’02’’

Department: Engineering Issue Date 08-08-2014


Effective Date 12-08-2014
New Revision 08-08-2017

Prepared Miss Tuba A.Sattar Signature


By
QA Officer Date

Reviewed Syed Naseemuddin Signature


By
Manager Engineering Date

Approved
Mr. Atif Anwar Signature
By
Manager QA & QC Date

Authorized
Mr. Saud saboor Signature
By
Director Business
Date
Development
PAUL BROOKS HOMOEO LABS

Standard Operating Procedure Page No. 2 of 5

Title: Maintenance & Servicing of Drop SOP No. EN-ENG-002


Tank
Revision No. ‘’02’’

Department: Engineering Issue Date 08-08-2014


Effective Date 12-08-2014
New Revision 08-08-2017

1. Purpose:
To describe the standard maintenance and servicing procedure of Drop tank.

2. Scope:
Drop tank must be fill to the indicated level and connect to the filling machine.

3. Reference:
ISO 9001: 2008. 4.2, 7.5
Drop tank Manual

4. Responsibility:
Utilities Engineer / Supervisor will coordinate/execute operations according to
the procedure outlined.
Utilities Engineer will be responsible for System compliance and data review.
PAUL BROOKS HOMOEO LABS

Standard Operating Procedure Page No. 3 of 5

Title: Maintenance & Servicing of Drop SOP No. EN-ENG-002


Tank
Revision No. ‘’02’’

Department: Engineering Issue Date 08-08-2014


Effective Date 12-08-2014
New Revision 08-08-2017

5. Procedure:
Preventive actions
The risk of accidents, parts damage and other hazards are controlled by adopting &
implementing preventive actions.
Following actions are taken.
i. Ensure that remaining air is completely released/ exhausted from tank before
operation.
ii. Ensure that body is prevented to leakage and should be air tight.
iii. Ensure that safety valve should properly activated.
iv. Check motor operating parameter (i.e. voltage, ampere, horse power, RPM
and temperature etc.) or any abnormal noise.
v. Electrical contacts should properly be connected and cleaned with contact
cleaner.
vi. All warning devices must be working properly.

Preventive Maintenance
Following activities should be performed to maintain its life and improve efficiency.

1. Parts Replacements
Check for any damage or wear out parts and replaced if required with standard
grading and specification.
PAUL BROOKS HOMOEO LABS

Standard Operating Procedure Page No. 4 of 5

Title: Maintenance & Servicing of Drop SOP No. EN-ENG-002


Tank
Revision No. ‘’02’’

Department: Engineering Issue Date 08-08-2014


Effective Date 12-08-2014
New Revision 08-08-2017

2. Check level indicator.

3. Calibration
Calibration must be done of sensors.

6. Frequency:
Half yearly preventive action.

7. Format: ENG-F-MCL-001
PAUL BROOKS HOMOEO LABS

Standard Operating Procedure Page No. 5 of 5

Title: Maintenance & Servicing of Drop SOP No. EN-ENG-002


Tank
Revision No. ‘’02’’

Department: Engineering Issue Date 08-08-2014


Effective Date 12-08-2014
New Revision 08-08-2017

8. Distribution list:
DISTRIBUTION LIST
Manager Quality Assurance Master Copy
Documentation
Copy 01
Coordinator (Engg)
Manager E&M Copy 02

9. Reason of Revision:

Revision No. Date Reason for change


01
02