You are on page 1of 30

1) pile work

rcc ratio 1 1.5 3


item sub-title D (ft) H (ft) N L (rft) V (cft)
p-1 1.67 55 24 1320 2879.8
p-2 1.67 50 26 1300 2836.16666667
pile 0
0
0
total rcc volume (cft) 5715.9666667
total boring length (rft) 2620
length without
Re-bar 1.5 tie spacing (inch) 6.5
tie (ft)
L with
N
item sub-title dia (mm) lap U.W (ft) N (pile.) W (kg)
(bar)
(ft)
main bar-1 16 56 6 0.48 24 3859
pile-1
tie 10 4.17 99 0.19 24 1846
main bar-2 16 51 6 0.48 26 3807
pile-2
tie 10 4.17 90 0.19 26 1812

material required & total costing for pile works

wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 1247 2 1272 400 508825


2 sand cft 2338 10 2572 40 102887
3 stone chips cft 4677 10 5144 180 925987
4 20 mm re bar kg 1 0
5 16 mm re bar kg 7666 10 8432
6 12 mm re bar kg 0 0
7 10 mm re bar kg 3658 15 4207
8 total re-bar kg 11324 12639 60 758331
9 labour rft 2620 0 2620 190 497800
total amount 2793830
cost per rft 1066
re bar (%) 0.99
2) pile-cap work
earth excavation
item sub-title L (ft) W (ft) H (ft) A(sft) N V (cft)
PC-1 11.00 7 5 3 1155
PC-2 11.00 7 5 6 2310
PC-2A 11.00 7 5 1 385
PC-3 11.00 10 5 8 4400
PC-3A 13.00 11 5 1 715
pile-cap PC-3B 13.00 11.5 5 1 747.5
PC-4 12.00 12 5 3 2160
PC-5 12.00 12 5 1 720
PC-6 14.00 14.00 5 1 980
PC-7 17.00 16 6 1 1632
PC-8 20.00 18 6 1 2160
total volume (cft) 17364.5

CC 2.5" ratio 1 3 6
item sub-title L (ft) W (ft) H (ft) A(sft) N V (cft)
PC-2 9.50 4 0.21 6 47.5
PC-3 0.21 50 2 20.83
PC-3A 0.21 70 1 14.58
PC-3B 0.21 70 1 14.58
PC-5 11.75 11.75 0.21 4 115.05
PC-6 15.00 9.5 0.21 1 29.6875
pile-cap
PC-7 0.21 177 1 36.875
PC-10 0.21 252 1 52.5
PC-10A 0.21 252 3 157.5
PC-12 20.50 15 0.21 2 128.13
PC-12A 20.50 15 0.21 1 64.06
PC-12B 20.50 15 0.21 1 64.06
total volume (cft) 745.36
material required & total costing for pile cap cc

wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 89 1 90 410 37039


2 sand cft 335 5 352 45 15848

3 brick chips cft 671 6 711 46 32710


total amount 85597

rcc ratio 1 1.5 3


item sub-title L (ft) W (ft) T (ft) A(sft) N V (cft)
PC-2 9.50 4 1.58 6 361
PC-3 1.92 50 2 191.67
PC-3A 2.08 70 1 145.83
PC-3B 2.08 70 1 145.83
PC-5 11.75 11.75 2.75 4 1518.69
PC-6 15.00 9.5 3.08 1 439.375
pile-cap
PC-7 2.75 177 1 486.75
PC-10 3.08 252 1 777
PC-10A 3.25 252 3 2457
PC-12 20.50 15 2.58 2 1588.75
PC-12A 20.50 15 3.58 1 1101.88
PC-12B 20.50 15 3.42 1 1050.63
total rcc volume (cft) 10264.3958333
Re-bar
N U.W
item sub-title dia (mm) L (ft) N (cap.) W (kg)
(bar) (ft)
20 12 12 0.75 646
PC-2 16 6 15 0.48 6 258
10 30 2 0.19 67
20 11 47 0.75 773
PC-3 4 19 0.00 2 0
10 22 2 0.19 16
20 11 47 0.75 387
PC-3A 4 19 0.00 1 0
10 22 2 0.19 8
25 16.5 52 1.17 4009
PC-5 6.25 20 0.00 4 0
10 52 2 0.19 78
25 18 56 1.17 1178
PC-6 19.3 25 0.00 1 0
10 55 2 0.19 21
20 9 26 0.75 175
20 6.5 20 0.75 97
PC-7 1
pile-cap 16 9 47 0.48 202
10 32 1 0.19 6
pile-cap

25 22 75 1.17 1928
PC-10 6.25 26 0.00 1 0
10 75 2 0.19 28
25 22 75 1.17 5783
PC-10A 6.25 26 0.00 3 0
10 75 2 0.19 84
25 23 105 1.17 5643
PC-12 16 23 90 0.48 2 1981
10 85 2 0.19 64
25 24 84 1.17 2355
PC-12A 16 24 72 0.48 1 827
10 85 2 0.19 32
25 24 84 1.17 2355
PC-12B 16 24 72 0.48 1 827
10 85 2 0.19 32

material required & total costing for pile cap works

wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 2240 2 2284 410 936561


2 sand cft 4199 10 4619 45 207854
3 stone chips cft 8398 10 9238 180 1662832
4 25 mm re bar kg 23250 10 25575
5 20 mm re bar kg 2078 15 2389
6 16 mm re bar kg 4096 10 4505
7 12 mm re bar kg 0 0
8 10 mm re bar kg 436 15 501

9 total re-bar kg 29859 32970 60 1978220

total amount 4785467


re bar (%) 1.31
77.56973
7.247183
13.66402
0
1.519066
rcc ratio 1 2 4
item sub-title L (ft) W (ft) H (ft) A(sft) N V (cft)
MAT 0.83 9472 1 7861.76
total rcc volume (cft) 7861.76

Re-bar spacing(avg)
L with
N U.W
item sub-title dia (mm) lap L N (seg.) W (kg)
(bar) (ft)
(ft)
SD st. main 12 115 890 0.27 1 27548
total 27548

material required & total costing for SLAB

wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 1348 2 1375 400 549874


2 sand cft 3369 10 3706 45 166782
3 brick chips cft 6739 8 7278 115 836941

7 12 mm re bar kg 27548 10 30303

8 10 mm re bar kg 12 0

9 total re-bar kg 27548 30303 60 1818195


total amount 3371791
rcc ratio 1 2
item sub-title L (ft) W (ft) H (ft) A(sft) N

floor beam 424.00 0.83 10.00 1

total rcc volume (cft)

Re-bar
L with
N U.W
item sub-title dia (mm) lap L N (seg.)
(bar) (ft)
(ft)
stand 10 12 1696 0.19
SD 1
binder 10 484 29 0.19
total
10mm

material required & total costing for RW

wastage
sl item unit qty. Q rate
(in %)

1 cement bag 603 2 615 400


2 sand cft 1508 8 1629 45
3 brick chips cft 3016 10 3318 115
7 kg 8 0

8 10 mm re bar kg 6382 12 7148

9 total re-bar kg 6382 7148 60

total amount
4
V (cft)

3519.20

3519.2

W (kg)

3804
2578
6382

al required & total costing for RW

amount

246143
73300
381582

428899

1129924
per foor

rcc ratio 1 1.25 2.5


item sub-title L (in) W (in) H (ft) A(sft) N V (cft)
C-1 25 12 8.5 10 177.0833
C-2 25 15 8.5 2 44.27083
C-3 30 15 8.5 4 106.25
column C-4 35 15 8.5 5 154.9479
C-5 30 20 8.5 5 177.0833
C-6 35 20 8.5 2 82.63889
C-7 40 20 8.5 4 188.8889
total rcc volume (cft) 931.163
Re-bar spacing (avg) 6.5
L with
N U.W N W
item sub-title dia (mm) lap L
(bar) (ft) (col.) (kg)
(ft)
20 13.33 14 0.75 1395
C-1 10 0
10 8.17 18 0.19 270
20 13.33 16 0.75 319
C-2 2 0
10 13.75 18 0.19 91
25 14 8 1.17 523
C-3 20 13.33 8 0.75 4 319
10 13.17 18 0.19 174
25 14 8 1.17 654
column C-4 20 13.33 12 0.75 5 598
10 20.5 18 0.19 339
25 14 10 1.17 818
C-5 20 13.33 10 0.75 5 498
10 19.08 18 0.19 315
25 14 12 1.17 393
C-6 20 13.33 12 0.75 2 239
10 24.25 18 0.19 160
25 14 24 1.17 1570
C-7 4 0
10 25.92 18 0.19 343

material required & total costing for column below gb

wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 235 2 240 410 98378


2 sand cft 368 8 397 45 17864
3 stone chips cft 735 8 794 180 142909

4 25 mm re bar kg 3958 8 4275

5 20 mm re bar kg 3369 10 3705

6 16 mm re bar kg 0 0

7 12 mm re bar kg 0 0

8 10 mm re bar kg 1693 15 1947


9 total re-bar kg 9020 9927 60 595624
total amount 854774
per foor

rcc ratio 1 1.25 2.5


item sub-title L (in) W (in) H (ft) A(sft) N V (cft)
C-1 25 12 8.5 10 177.0833
C-2 25 15 8.5 2 44.27083
C-3 30 15 8.5 4 106.25
column C-4 35 15 8.5 5 154.9479
C-5 30 20 8.5 5 177.0833
C-6 35 20 8.5 2 82.63889
C-7 40 20 8.5 4 188.8889
total rcc volume (cft) 931.163
Re-bar spacing (avg) 6.5
L with
N U.W N W
item sub-title dia (mm) lap L
(bar) (ft) (col.) (kg)
(ft)
20 13.33 8 0.75 797
C-1 16 13 6 0.48 10 373
10 8.17 18 0.19 270
20 13.33 8 0.75 159
C-2 16 13 8 0.48 2 100
10 13.75 18 0.19 91
0 14 8 0.00 0
C-3 20 13.33 16 0.75 4 638
10 13.17 18 0.19 174
14 0 0.00 0
column C-4 20 13.33 20 0.75 5 997
10 20.5 18 0.19 339
14 0 0.00 0
C-5 20 13.33 20 0.75 5 997
10 19.08 18 0.19 315
14 0 0.00 0
C-6 20 13.33 24 0.75 2 478
10 24.25 18 0.19 160
25 14 12 1.17 785
C-7 20 13.33 12 0.75 4 478
10 25.92 18 0.19 343

material required & total costing for column below gb


wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 235 2 240 410 98378


2 sand cft 368 8 397 45 17864
3 stone chips cft 735 8 794 180 142909
4 25 mm re bar kg 785 8 848
5 20 mm re bar kg 4545 10 4999
6 16 mm re bar kg 473 0 473
7 12 mm re bar kg 0 0
8 10 mm re bar kg 1693 15 1947
9 total re-bar kg 7496 8267 60 496004
total amount 755154
per foor

rcc ratio 1 1.25 2.5


item sub-title L (in) W (in) H (ft) A(sft) N V (cft)
C-1 25 12 8.5 10 177.0833
C-2 25 15 8.5 2 44.27083
C-3 30 15 8.5 4 106.25
column C-4 35 15 8.5 5 154.9479
C-5 30 20 8.5 5 177.0833
C-6 35 20 8.5 2 82.63889
C-7 40 20 8.5 4 188.8889
total rcc volume (cft) 931.163
Re-bar spacing (avg) 6.5
L with
N U.W N W
item sub-title dia (mm) lap L
(bar) (ft) (col.) (kg)
(ft)
20 13.33 4 0.75 399
C-1 16 12.5 10 0.48 10 598
10 8.17 18 0.19 270
20 13.33 4 0.75 80
C-2 16 12.5 12 0.48 2 144
10 13.75 18 0.19 91
16 12.5 8 0.48 191
C-3 20 13.33 8 0.75 4 319
10 13.17 18 0.19 174
16 12.5 12 0.48 359
column C-4 20 13.33 8 0.75 5 399
10 20.5 18 0.19 339
16 12.5 10 0.48 299
C-5 20 13.33 10 0.75 5 498
10 19.08 18 0.19 315
16 12.5 12 0.48 144
C-6 20 13.33 12 0.75 2 239
10 24.25 18 0.19 160
14 12 0.00 0
C-7 20 13.33 24 0.75 4 957
10 25.92 18 0.19 343

material required & total costing for column below gb


wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 235 2 240 410 98378


2 sand cft 368 8 397 45 17864
3 stone chips cft 735 8 794 180 142909

4 25 mm re bar kg 8 0

5 20 mm re bar kg 2890 10 3179


6 16 mm re bar kg 1735 0 1735
7 12 mm re bar kg 0 0
8 10 mm re bar kg 1693 15 1947
9 total re-bar kg 6318 6861 60 411650
total amount 670801
rcc ratio 1 1.5 3
item sub-title L (ft) W (ft) H (ft) A(sft) N V (cft)
GF-1 38.50 1 1.5 1 57.75
GF-2 14.17 1 1.5 1 21.26
GF-3 33.83 1 1.5 1 50.75
GF-4 15.17 1 1.5 1 22.76
GF-5 30.00 1 1.5 1 45.00
GF-6 50.58 1 1.5 1 75.87
GF-7 32.75 1 1.5 1 49.13
GF-8 12.25 1 1.00 1 12.25
GF-9 32.83 1 1.50 1 49.25
GF-10 11.25 1 1.00 1 11.25
floor GF-11 51.50 1 1.50 1 77.25
beam GF-12 26.25 0.83 1.50 1 32.81
GF-13 18.17 0.83 1.50 1 22.71
GF-14 9.75 0.83 1.50 2 24.38
GF-15 25.50 0.83 1.50 1 31.88
GF-15A 28.83 0.83 1.50 1 36.04
GF-16A 17.00 1 1.00 1 17.00
GF-17 40.33 0.83 1.50 1 50.41
GF-18 20.75 0.83 1.50 1 25.94
GF-19 25.50 0.83 1.50 1 31.88
GF-20 41.33 0.83 1.50 1 51.66
GF-21 41.33 1 1.00 1 41.33
total rcc volume (cft) 838.525
Re-bar spacing(avg) 5.5
L with lap L N U.W W
item sub-title dia (mm) N (seg.)
(ft) (bar) (ft) (kg)
25 50.5 5 1.17 1 295
25 85 1 1.17 99
GF-1 20 49.9 2 0.75 75
0
10 5.25 84 0.19 82
20 18.3 4 0.75 55
20 12 1 0.75 9
GF-2 1
16 50 1 0.48 24
10 5.25 31 0.19 30
20 41.6 4 0.75 124
20 30 1 0.75 22
GF-3 1
16 93.6 1 0.48 45
10 5.25 74 0.19 72
20 49.5 1 0.75 37
0
GF-4 1
GF-4 1
16 19.3 4 0.48 37
10 5.25 33 0.19 32
20 37.6 5 0.75 141
0
GF-5 1
16 69 1 0.48 33
10 5.25 65 0.19 64
25 65.5 5 1.17 383
25 66 1 1.17 77
GF-6 20 81 2 0.75 1 121
16 37 1 0.48 18
10 5.25 110 0.19 108
20 40.6 3 0.75 91
20 29 1 0.75 22
GF-7 1
16 61 2 0.48 58
10 5.25 71 0.19 70
20 16.3 5 0.75 61
20 13 1 0.75 10
GF-8 1
0
10 4.25 27 0.19 21
20 39.6 3 0.75 89
20 80 1 0.75 60
GF-9 1
16 39.6 2 0.48 38
10 5.25 72 0.19 70
20 14.8 5 0.75 55
20 14.8 2 0.75 22
GF-10 1
16 14.8 1 0.48 7
FB
10 4.25 25 0.19 19
25 63 3 1.17 221
25 90 1 1.17 105
GF-11 20 95 1 0.75 1 71
0
10 5.25 112 0.19 110
20 33.6 3 0.75 75
16 33.6 2 0.48 32
GF-12 16 55 1 0.48 1 26
0
10 5.25 57 0.19 56
16 22.3 5 0.48 53
16 40 1 0.48 19
GF-13 1 0
0
10 5.25 40 0.19 39
20 11 2 0.75 33
16 11 4 0.48 42
GF-14 2
GF-14 2 0
0
10 5.25 21 0.19 42
20 29.3 5 0.75 110
20 20 1 0.75 15
GF-15 1
16 61.3 1 0.48 29
10 4.92 56 0.19 51
20 27.3 5 0.75 102
20 50 1 0.75 37
GF-15A 1
16 27.3 2 0.48 26
10 3.92 63 0.19 46
20 6 1 0.75 4
16 20.33 5 0.48 49
GF-16A 1
16 23.5 1 0.48 11
10 4.25 37 0.19 29
20 179.66 1 0.75 134
16 47.66 4 0.48 91
GF-17 1
16 79 1 0.48 38
10 4.92 88 0.19 81
20 90.33 1 0.75 68
16 24.33 2 0.48 23
GF-18 1
16 15 1 0.48 7
10 4.92 45 0.19 42
20 27.3 5 0.75 102
16 27.3 2 0.48 26
GF-19 1
16 50 1 0.48 24
10 4.92 56 0.19 51
20 48.6 5 0.75 182
0.00 0
GF-20 1
16 136 1 0.48 65
10 4.92 90 0.19 83
20 48.6 3 0.75 109
20 128 1 0.75 96
GF-21 1
16 104.6 1 0.48 50
10 4.25 90 0.19 72

material required & total costing for floor beam

wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 183 5 192 400 76839


2 sand cft 343 8 370 45 16671
3 brick chips cft 686 8 741 115 85209
4 25 mm re bar kg 1180 5 1239
5 20 mm re bar kg 2131 15 2451
6 16 mm re bar kg 873 15 1004
7 12 mm re bar kg 2 0
8 10 mm re bar kg 1273 12 1426
9 total re-bar kg 5458 6120 60 367199
total amount 545919
percentage
20
40
16

23
rcc ratio 1 1.5 3
item sub-title L (ft) W (ft) H (ft) A(sft) N V (cft)
floor
0.50 8555 1 4277.50
beam
total rcc volume (cft) 4277.5

Re-bar spacing(avg)
L with
N U.W
item sub-title dia (mm) lap L N (seg.) W (kg)
(bar) (ft)
(ft)
st. main 10 60 38 0.19 421
crk main 10 61.26 38 0.19 429
st. main 10 50 20 0.19 182
SD 1
crk main 10 51.26 20 0.19 187
ex. T 12 31.33 38 0.27 316
ex. T 12 31 20 0.27 163
st. main 10 89 14 0.19 228
crk main 10 91.52 14 0.19 235
st. main 10 89 24 0.19 393
crk main 10 91.52 24 0.19 404
LD st. main 10 66.5 11 0.19 1 139
crk main 10 68.18 11 0.19 142
ex. T 12 48 14 0.27 177
ex. T 12 42 24 0.27 271
ex. T 12 35 11 0.27 105
total 3791
10mm 2759

material required & total costing for SLAB

wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 933 2 952 400 380775


2 sand cft 1750 8 1890 45 85044
3 brick chips cft 3500 8 3780 115 434672
7 12 mm re bar kg 1032 8 1115
8 10 mm re bar kg 2759 12 3090
9 total re-bar kg 3791 4205 60 252287
total amount 1152778
S
rcc ratio 1 1.5 3
item sub-title L (ft) W (ft) H (ft) A(sft) N V (cft)
FB-1 14.67 1 1.5 1 22.01
FB-2 28.50 1 1.5 1 42.75
FB-3 11.25 1 1.5 1 16.88
FB-4 27.67 1 1.5 1 41.51
FB-5 29.17 1 1.5 1 43.76
FB-6 11.00 1 1.5 1 16.50
FB-7 32.75 1 1.5 1 49.13
FB-8 11.25 1 1.5 1 16.88
FB-9 32.75 1 1.5 1 49.13
FB-10 12.25 0.83 1.5 1 15.25
FB-11 50.67 1 1.5 1 76.01
FB-12 32.75 1.00 1.50 1 49.13
FB-13 15.25 1.00 1.50 1 22.88
FB-14 14.17 1.00 1.50 2 42.51
FB-15 32.75 1.00 1.50 1 49.13
floor
FB-16 41.17 0.83 1.50 1 51.46
beam
FB-17 41.17 0.83 1.00 1 34.17
FB-18 52.00 0.83 1.50 1 65.00
FB-19 26.25 0.83 1.50 1 32.81
FB-20 18.17 0.83 1.50 1 22.71
FB-21 9.67 0.83 1.50 1 12.09
FB-22 25.50 0.83 1.50 1 31.75
FB-22A 28.83 0.83 1.50 1 35.89
FB-24 40.00 0.83 1.25 1 41.50
FB-25 8.25 0.83 1.50 1 10.27
FB-26 40.33 0.83 1.50 1 50.21
FB-27 20.75 0.83 1.50 1 25.83
FB-28 25.50 0.83 1.50 1 31.75
FB-29 41.33 0.83 1.50 1 51.46
FB-30 98.00 0.83 1.50 1 122.01
FB-31 41.33 0.83 1.50 1 51.46
total rcc volume (cft) 1223.78
Re-bar spacing(avg) 5.5
L with
N U.W W
item sub-title dia (mm) lap L N (seg.)
(bar) (ft) (kg)
(ft)
20 39.3 1 0.75 29
0
FB-1 1
16 74.33 1 0.48 36
10 5.25 32 0.19 31
25 36.5 2 1.17 85

FB-2 1
20 36.5 3 0.75 82
FB-2 20 110 1 0.75 1 82
0
10 5.25 62 0.19 61
20 15.3 3 0.75 34
16 15.3 5 0.48 37
FB-3 1
0
10 5.25 25 0.19 24
25 32.5 2 1.17 76
20 20 1 0.75 15
FB-4 20 32.5 3 0.75 1 73
16 146 1 0.48 70
10 5.25 60 0.19 59
25 34 4 1.17 159
0
FB-5 20 102 1 0.75 1 76
16 120 1 0.48 57
10 5.25 64 0.19 62
65.5 5 0.00 0
66 1 0.00 0
FB-6 20 14 1 0.75 1 10
16 13 9 0.48 56
10 5.25 24 0.19 24
20 39.6 5 0.75 148
20 83 1 0.75 62
FB-7 1
16 40 2 0.48 38
10 5.25 71 0.19 70
20 13 10 0.75 97
0
FB-8 1
0
10 4.25 25 0.19 19
20 39.6 3 0.75 89
20 58 1 0.75 43
FB-9 1
16 77 2 0.48 74
10 5.25 71 0.19 70
FB
20 15.8 6 0.75 71
0
FB-10 1
0
10 4.25 27 0.19 21
25 63 3 1.17 221
25 117 1 1.17 137
FB-11 20 95.32 3 0.75 1 214
0
10 5.25 111 0.19 108
20 39.6 5 0.75 148
20 41 1 0.75 31
FB-12 16 20 1 0.48 1 10
0
10 5.25 71 0.19 70
20 19.3 3 0.75 43
20 19 1 0.75 14
FB-13 16 80 1 0.48 1 38
0
10 5.25 33 0.19 33
20 15 4 0.75 90
20 18 4 0.75 108
FB-14 16 60 4 0.48 2 230
0
10 5.25 31 0.19 61
20 38.6 5 0.75 144
20 80 1 0.75 60
FB-15 1
61.3 1 0.00 0
10 4.92 71 0.19 66
20 51.9 5 0.75 194
1 0.00 0
FB-16 1
16 153 2 0.48 146
10 3.92 90 0.19 66
20 55.66 5 0.75 208
16 190 4 0.48 364
FB-17 1
1 0.00 0
10 4.92 90 0.19 83
20 61.99 4 0.75 185
20 114 1 0.75 85
FB-18 1
16 138 1 0.48 66
10 4.92 113 0.19 104
20 30.3 5 0.75 113
20 54 1 0.75 40
FB-19 1
16 60 1 0.48 29
10 4.92 57 0.19 53
20 20 1 0.75 15
16 20 4 0.48 38
FB-20 1
16 40 1 0.48 19
10 4.92 40 0.19 36
20 11 4 0.75 33
0.00 0
FB-21 1
16 11 2 0.48 11
10 4.25 21 0.19 17
20 29.33 5 0.75 110

FB-22 1
20 70 1 0.75 52
FB-22 1
16 110 1 0.48 53
10 4.25 56 0.19 44
20 27.33 5 0.75 102
20 50 1 0.75 37
FB-22A 1
16 50 1 0.48 24
10 4.25 63 0.19 50
20 47.66 5 0.75 178
20 135 1 0.75 101
FB-24 1
16 54 1 0.48 26
10 4.25 87 0.19 69
20 10 2 0.75 15
135 1 0.00 0
FB-25 1
16 10 4 0.48 19
10 4.25 18 0.19 14
20 47.66 5 0.75 178
20 145 1 0.75 108
FB-26 1
16 30 1 0.48 14
10 4.25 88 0.19 70
20 25.33 5 0.75 95
20 41 1 0.75 31
FB-27 1
30 1 0.00 0
10 4.25 45 0.19 36
20 30.33 5 0.75 113
20 51 1 0.75 38
FB-28 1
16 30.33 2 0.48 29
10 4.25 56 0.19 44
20 51.99 4 0.75 155
20 95 1 0.75 71
FB-29 1
16 130 1 0.48 62
10 4.25 90 0.19 72
20 119.98 5 0.75 449
20 76 1 0.75 57
FB-30 1
16 350 1 0.48 167
10 4.25 214 0.19 170
20 52.99 4 0.75 158
0 76 1 0.00 0
FB-31 1
16 200 1 0.48 96
10 4.25 90 0.19 72

material required & total costing for floor beam

wastage
sl item unit qty. Q rate amount
(in %)
1 cement bag 267 5 280 400 112143
2 sand cft 501 8 541 45 24331
3 brick chips cft 1001 8 1081 115 124358
4 25 mm re bar kg 678 5 711
5 20 mm re bar kg 4688 15 5391
6 16 mm re bar kg 1797 15 2067
7 12 mm re bar kg 2 0
8 10 mm re bar kg 1780 12 1994
9 total re-bar kg 8943 10163 60 609789
total amount 870621
percentage
7
53
20
0
20
below basement

rcc ratio 1 1.25 2.5


item sub-title L (in) W (in) H (ft) A(sft) N V (cft)
sw 10 37 2 740
total rcc volume (cft) 740
Re-bar spacing (avg) 2.5
L with
N U.W N W
item sub-title dia (mm) lap L
(bar) (ft) (col.) (kg)
(ft)
20 12.5 116 0.75 2168
basemen 16 12.5 102 0.48 1220
SW 2
t 12 12.5 35 0.27 236
10 57 48 0.19 1023

ground to second floor

rcc ratio 1 1.25 2.5


item sub-title L (in) W (in) H (ft) A(sft) N V (cft)
sw 10 31 6 1860
total rcc volume (cft) 1860
Re-bar spacing (avg) 2.5
L with
N U.W N W
item sub-title dia (mm) lap L
(bar) (ft) (col.) (kg)
(ft)
20 12.5 116 0.75 6505
FOR 3
SW 16 12.5 102 0.48 6 3661
FLOOR
10 39 48 0.19 2099

third to fifth floor

rcc ratio 1 1.25 2.5


item sub-title L (in) W (in) H (ft) A(sft) N V (cft)
sw 10 31 6 1860
total rcc volume (cft) 1860
Re-bar spacing (avg) 2.5
L with
N U.W N W
item sub-title dia (mm) lap L
(bar) (ft) (col.) (kg)
(ft)
20 12.5 52 0.75 2916
FOR 3
SW 16 12.5 102 0.48 6 3661
FLOOR
10 39 48 0.19 2099

material required & total costing for column below gb

wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 187 2 191 410 78181


2 sand cft 292 8 315 45 14196
3 stone chi cft 584 8 631 180 113571
25 mm
4 kg #REF! 8 #REF!
re bar
20 mm
5 kg #REF! 10 #REF!
re bar
6 16 mm re kg 0 0
12 mm
7 kg 0 0
re bar
8 10 mm re kg #REF! 15 #REF!
9 total re-b kg #REF! #REF! 60 #REF!
total amount #REF!