The line distance protection is a five zone full scheme protection with three fault loops for phase
To phase faults and three fault loops for phase to earth fault for each of the independent zones.
So we will put the equation for these fault loops for phase to phase and phase to earth
**.Now we have the figures for Phase to Phase & Phase to Earth:
NOTE: All the previous equation is multiplied by the factor of CTR/VTR because all setting values
Are entered in primary values and so as to convert it to secondary values we are using the previous
Formula .
HOW TO DRAW THE REFERENCE GRAPH OF ZONES:
Due to that there is no SVT tools for drawing the RIO file of the relay we are using the previous
Equations to draw the reference by the aid of FREEJA program and this is specially by reference
Graph editor.
1-but we have to know first the characteristics of the relay before drawing the file.
FIG 4
FIG 5
fig 7
NOTE: For drawing of the reference graph we have two fixed angle equal :60° and two fixed equals 90°
And this clear from the above figure. And this is same like PH-E
The operation condition for three phase faults is the same as for phase-to-phase fault i.e.
However, the reach is expanded by a factor 2/√3 (approximately 1.1547) in all directions. At the
Same time the apparent impedance is rotated 30 degrees, counter-clockwise. The characteristic
Is shown in the figure:
3
2
4
1
5
6
fig 8
FOR SIMPLICITY WE CAN DRAW THE REF GRAPH BY THE AID OF SIX CIRCULES AT THE
FIG:
1-∠ 120 R= 2/3 RFFWPP
fig 9
1-R inner =R inner (FWD) ∗CTR/VTR 1-R outer =R inner (FWD) +ΔFW
Where:
NOTE: The value of ΔFW & ΔRv all time is less than 1
1-Power swing block test: from the previous test we have done the reach test of the power swing function
And now we know the values of inner & outer values of PSD.
So for checking the block time of PSD and for example we are putting it to
Be 2 SEC. We can follow the following Procedures.
1-Seq 1: Put normal Zone out of the reach of outer zone for PSD (with time 100 ms).
2-Seq 2: Put this to be in between the inner & outer zone and this with time 2000ms (blocking time).
3-Seq 3: Put this to the value of tripping zone and i.e. to be ZONE 1 with time of 100 ms and at this
Seq. put the contact to trip of goal for knowing the function will trip or not.
4- At the relay and from signal matrix, put one LED to be PSD detection.
5- In the sequence test we can use the timer of the sequence to calculate the time of blocking, but this is
Not accurate method because it’s giving the time more than the value of blocking by noticed amount.
6- So we can use Dual timer (external timer) to measure this time and this by applying
1-one contact for PSD detect (this will be the start contact for the timer).
2-the second contact is DIST trip (this will be the stop contact for the timer).
7- After checking the blocking time, now we can check the blocking feature of the PSD.
i- From the Sequence test we can adjust the time of the second Seq. to be 1000 ms and so that the relay
will remain in the blocking mode and there is now trip, Because the tripping sequence finish before
the blocking time of the PSD, And so on for all z
External SOTF: