NOH DieselFuel-Drow PDF
NOH DieselFuel-Drow PDF
Presented by:
Mark Drow
David Eoff
AGENDA
MARK DROW
DAVID EOFF
ABOUT PREFERRED UTILITIES
UL142 UL2085
UNDERGROUND OVERVIEW
HYPOTHETICAL PROJECT EXAMPLE
FUEL LOAD CALCS: START HERE
TRICK QUESTION
OTHER FUEL LOAD CONSIDERATIONS
DAY TANKS
DAY TANK SIZE
MULTIPLE DAY TANKS
High
Pump stop
Pump Start
Low
Control Panel
Return
Containment
Supply
Containment
Leak Detector
DAY TANK CONTROLS
LEAK DETECTION
LEAK DETECTION
• Required in tank interstitial spaces.
• Recommended in pump set leak basins.
• Required in containment piping.
• A good idea anywhere oil is likely to leak and accumulate.
Note: NFPA code is mute on how many leak detectors are required in containment piping.
PUMPS
Emerg. Gen.
Fill
GENERATOR
LOOP
Return
Supply
Suction
Emerg. Gen.
Fill
Return
Suction Supply