URBAN CORRIDOR MANAGEMENT

FOR HETEROGENOUS TRAFFIC


CONDITIONS – A CASE STUDY OF
AMEERPET TO KUKATPALLY
CORRIDOR, HYDERABAD

J Pradeep Chytanya
Asst. Engineer (Highway Designs)
Egis India Consulting Engineers Pvt. Ltd.

Page 1
INTRODUCTION
¾CORRIDOR:
¾MANAGEMENT:.
¾CORRIDOR PROBLEMS: PHV, VOR, ACCESS &
CONVINIENCE, CURRENT TRENDS, SAFETY, PEAK HOUR
¾ SIGNIFICANCE: INCREASED POPULATION, MISMATCH B/W
FUNDING & NEED, A CMP IS A GOOD BACK BONE FOR CTTP
¾OBJECTIVES: IDENTIFY, UNDERSTAND, EVALUATE
MANAGE

Page 2
LITERATURE REVIEW

• HAND BOOKS OF VARIOUS DOT’S HAS BEEN


REFERRED
• AMERIACN, EUROPEAN AND AUSTRALIAN
METHODOLOGIES HAVE BEEN THROUGLY
REVIEWED & BEST METHODOLOGY FOR INDIAN
CONDITIONS WAS DRAWN

Page 3
US DOT METHODOLOGY EUROPEAN METHODOLOGY

GETTING ORGANIZED IDENTIFY CORRIDOR


KNOW THE CORRIDOR CONVEY TO PUBLIC
DEVELOP THE CHOICES REVIEW OF OPTIONS
SELECT PREFFERED DRAFT CMP
IMPLEMENTATION PUBLIC REVIEW &COMENTS
SUSTAIN THE VISION FINAL CMP

AUSTRALIAN METHODOLOGY

GETTING ORGANIZED
EXISTING & FUTURE CONDITIONS
DEVELOP VISION & STRATEGIES
DEVELOP IMPLEMENTATION PLAN
DRAFT CMP & PUBLIC ISSUE
MONITOR PROGRESS

Page 4
CURRENT STUDY METHODOLOGY

Page 5
ABOUT STUDY AREA
¾STUDY AREA = HYDERABAD
¾STUDY AREA DESCRIPTION : Hyderabad, the capital of Andhra
Pradesh has emerged as most preferred destination for innovative
technologies. The main growth driver in Real Estate Market is IT, ITES
and BPO industries. Hyderabad, during the last 7- 8 years.
¾STUDY CORRIDOR = AMEERPET – KUKATPALLY (NH-9)
MAIN ARTERIAL

Page 6
Page 7
AMEERPET - MYTHRIVANAM

Page 8
MYTHRIVANAM – SR NAGAR

Page 9
SR NAGAR - ESI

Page 10
ESI - ERRAGADDA

Page 11
ERRAGADDA - KUKATPALLY

Page 12
DATA COLLECTION
• INTERSECTIONS = 6
• SEGMENTS = 5
• CORRIDOR LENGTH = 6.1 Km
SEGMENT LENGTHS

Page 13
PHYSICAL INVENTORY

Page 14
DATA ANALYSIS &
RESULTS

Page 15
TRAFFIC VOLUMES OF
SEGMENTS
SEGMENT PEAK HOUR PEAK HOUR
VOLUME
(PCU’S/HR)
Ameerpet Jn to 5075 11:30 am - 12:30 noon
Mythrivanam
Mythrivanam to SR Nagar 4853 11:00 am - 12:00 noon
SR Nagar to ESI 5292 6:00 pm – 7:00 pm
ESI to Erragadda 4844 4:45 pm – 5:45 pm
Erragadda to Kukatpally Y 4602 9:30 am – 10:30 am
Jn.

Page 16
TRAFFIC VOLUMES OF
INTERSECTIONS
INTERSECTION PEAK HOUR PEAK HOUR
VOLUME (PCU’S/HR)

SRINAGAR 13105 6:45 PM to 7:45 PM


MYTHRIVANAM 6712 10:15 AM to 11:15AM
SR NAGAR 16181 10:00 AM to 11:00 AM

ESI 12740 10:45 AM to 11:45 AM


ERRAGADDA 8848 7:00 PM to 8:00 PM
KUKATPALLY “Y” Jn 6721 7:00 PM to 8:00 PM

Page 17
PEAK HOUR VARIATIONS

Page 18
MODAL SHARES ALONG THE
CORRIDOR

Page 19
Page 20
Page 21
SIGNAL TIMINGS ALONG THE
CORRIDOR

Page 22
CAPACITY OF MID BLOCKS
¾ CAPACITY & LOS OF MID BLOCKS
• MORTAB AND CHARI 1991 = 4 LANE DIVIDED
For LOS “C” & for 10% SMV the DSV’S are as follows
MODE DSV’S
CARS 2075
BUS 1820
TRUCKS 1445
AUTOS 1935
2 WHEELERS 3300

Capacity of Single Lane = Capacity * (100/(100 - % of SMV))..(1)


Capacity of whole Segment = Capacity of single lane * 2………..(2)
Page 23
• SPEED FLOW CURVES = 6 LANE DIVIDED

¾DELAY & LOS OF INTERSECTIONS


BASED ON HCM 200
Controlled Delay = Stopped Delay +Acc/Dcc Delay……3
dad = FVS * Correction Factor ………………………...4
FVS = Fraction of vehicles stopping = Vstop / Vtot …....5

Free-Flow ≤7 vehicles 8-19 20-30


Speed vehicles vehicles
≤ 60km/h +5 +2 +1
>60-71 km/h +7 +4 +2
>71 km/h +9 7 +5
Page 24
DELAYS & LOS OF
INTERSECTIONS
INTERSECTION STOPED DELAY Acc/Dcc Delay LOS
(Sec/Veh) (Sec/Veh)

SRINAGAR 16.4 1.9 B

MYTHRIVANAM 37.9 1.5 D

SR NAGAR 65.2 1.8 E

ESI 24.1 1.3 C

ERRAGADDA 23.4 1.5 C

KUKATPALLY 49.6 1.3 D


“Y” Jn

Page 25
CAPACITY & LOS OF
SEGMENTS
SEGMENT NAME CAPACITY V/C LOS
(vph) RATIO

Ameerpet Jn to Mythrivanam 4200 0.766 C

Mythrivanam to SR Nagar 4465 0.835 D

SR Nagar to ESI 6246 0.763 C

ESI to Erragadda 4560 0.827 D

Erragadda to Kukatpally Y Jn. 5688 0.756 C

Page 26
FLOATING CAR SURVEYS
• 2 TRAILS IN PEAK & OFF PEAK
• TO & FRO
• PEAK = 10:00 AM – 11:00 AM
• OFF PEAK = 1:00 PM – 2:00 PM

Page 27
AMEERPET TO KUKATPALLY
ELEMENT PEAK OFF PEAK

13.08 8.15

Avg. Journey Time (Min)


12.35 7.76

Avg. Running Time (Min)


27.15 44.73

Avg. Journey Speed (Kmph)


29.07 47.67

Avg. Running speed (Kmph)


44 23

Avg. Delay (Sec)


Page 28
KUKATPALLY TO AMEERPET
ELEMENT PEAK OFF PEAK

15.33 9.76
Avg. Journey Time (Min)
14.35 9.43
Avg. Running Time (Min)
24.96 41.53
Avg. Journey Speed (Kmph)
26.32 44.19
Avg. Running speed (Kmph)
59 20
Avg. Delay (Sec)
Page 29
BOTTLENECK ANALYSIS

• DATA COLLECTED FLOATING CAR SURVEYS


• TIME/100m
• PLOTTED USING MINITAB 15 & D – PLOT
• X – AXIS = TIME
• Y – AXIS = DISTANCE
• Z – AXIS = SPEED
• RESULTS COMPARED

Page 30
WORKING WITH MINITAB 15

Page 31
WORKING WITH D-PLOT

Page 32
COMPARISION OF BOTTLENECKS

Page 33
OBSERVATIONS

Page 34
SPEED PROFILES

• RECORDED DURING FLOATING CAR


SURVEYS
• SPEEDS COMPARED B/W PEAK AND OFF
PEAK TIMES

Page 35
Page 36
CAUSALITY ANALYSIS
• CARRIED OUT DURING SURVEYS
• PROBLEMS IDENTIFIED
• MANAGEMENT MEASURES SUGGESTED

Page 37
AMEERPET - MYTHRIVANAM
LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES

AMEERPET BUS STOP SLOW TRAFFIC MOVEMENT RELOCATION OF BUS STOP


DUE TO BUS STOP BUS STOP

MYTHRIVANAM JN. PEDESTRIAN CROSSING SEPARATE PHASE FOR


PEDESTRAIN CROSSINGS
INSTALL BULLBOUTS

MYTHRIVANAM JN. MINOR LEG EXPERIENCING GREEN TIME HAS TO BE


MORE DELAY ALTERED

Page 38
MYTHRIVANAM – SR NAGAR
LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES

MYTHRIVANAM BUS STOP HIGH SPEEDS OF THE INSTALL SPEED BREAKERS


VEHICLES, PEDESTRAIN OR CUSHIONS OR A SPEED
CROSSING HUMP
FOOT OVER BRIDGE

SR NAGAR JN. SIGNAL JUMPING AT TYRE FLATTENING,


AMEERPET TO KUKATPALLY
LEG

SR NAGAR JN. DELAY AND QUEUE LENGTH CLOSE THE DIVIDER WHICH
ARE GETTING INCREASED IS JUST 28M OF LENGTH
FOR THE MINOR LEG
Page 39
SR NAGAR - ESI
LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES

ESI BUS STOP SLOWING DOWN OF SPEEDS MUST BE RELOCATED


BECAUSE IT WAS LOCATED AFTER 300M
VERY NEXT TO THE
NARROWED ROAD AT
DARGA.

ESI JN. SIGNAL JUMPING FROM THE TYRE FLATTENING.


TWO WHEELERS.

Page 40
ESI - ERRAGADDA
LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES

FRUIT MARKET ENCROACHMENTS AND SIDE ENCROACHMENTS NEED TO


FRICTION. BE STRICTLY CLEARED

FRUIT MARKET ILLEGAL MEDIAN OPENING, ILLEGAL MEDIAN OPENING


HAS TO BE CLOSED.

ERRAGADDA JN. PEDESTRIAN CROSSINGS MEDIAN HAS TO BE RAISED


CAUSING INTERFERENCE TO TO SOME HEIGHT SO THAT
THE THROUGH TRAFFIC. THE CROSSINGS WILL BE
DONE AT THE ESI JN.
Page 41
ERRAGADDA - KUKATPALLY
LOCATION PROBLEM IDENTIFIED MANAGEMENT MEASURES

MOOSAPET ENCROACHMENTS AND SIDE ENCROACHMENTS NEED TO


FRICTION. BE STRICTLY CLEARED

MOOSAPET BUS STOP ILLEGAL MEDIAN OPENING ILLEGAL MEDIAN OPENING


HAS TO BE CLOSED.

KUKATPALLY “Y” JN. BUSES ARE STOPPING ON THE BUS STOP HAS TO BE
PASSENGERS REQUEST AT RELOCATED AT A DISTANCE
THE JUNCTION OF 250M FROM THE “Y” JN.
INSTALL A SPEED HUMP JUST
BEFORE THE INTERSECTION
SO AS TO REDUCE THE SPEED
OF THE THROUGH TRAFFIC.
Page 42
BULL BOUTS

Page 43
SPEED HUMPS

Page 44
CONCLUSIONS

¾ PEAK HOUR VOLUME IS HIGH AT SR NAGAR Jn & SR


NAGAR – ESI MID BLOCK
¾ DELAY AT SR NAGAR IS HIGH & LESS AT SRINAGAR
¾ SR NAGAR – ESI HAVE HIGHEST CAPACITY
¾ AMEERPET – MYTHRIVANAM HAVE LESS CAPACITY
¾ KUKATPALLY – ERRAGADDA HAVE MORE DELAY
¾ ESI – SR NAGAR HAVE LESS DELAY
¾ 4 BOTTLENECKS IDENTIFIED WITH 2 ON EITHER
SIDE
Page 45
• OVERALL CORRIDOR PERFORMANCE CAN BE
IMPROVED WHEN,
™ PEDESTRAIN CROSSINGS
IMPROVED
™ ENCROACHMENTS CLEARED

Page 46
VERY GLAD TO HAVE THIS OPPORTUNITY
THANKING YOU,

J Pradeep Chytanya