Feeder name Sultani

Average Power factor 0.86


Maximum Demand (A) 80
Minimum Demand 30
Ratio (Maximum/Minimum) 0.375
Desired Power Factor 0.9
Capacitor Loacation
Capacitor rating 300 KVAR

Situation at maximum Demand of the feeder before capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Sultani 4573.07 86.03 3934.17 86.03 20.50 34.57 54.31 52.40

Situation at maximum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Sultani 4428.67 88.85 3934.77 88.85 20.22 34.08 54.03 52.41

Current situation at minimum Demand of the feeder before capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Sultani 1579.03 95.68 1510.80 95.68 2.71 4.56 24.14 89.11

Current situation at minimum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Sultani 1690.42 89.36 1510.54 89.36 2.78 4.69 24.22 88.97
Losses% V.D.

1.38% 1.40%

Losses% V.D.

1.37% 1.37%

Losses% V.D.

1.60% 0.46%

Losses% V.D.

1.60% 0.47%
Feeder name Lajoon
Average Power factor 0.86
Maximum Demand (A) 73
Minimum Demand 10
Ratio (Maximum/Minimum) 0.136986301369863
Desired Power Factor 0.9
Capacitor Loacation
Rating of the capacitor 300 KVAR

Situation at maximum Demand of the feeder before capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Lajoon 4171.60 86.01 3587.83 86.01 61.45 90.48 79.48 60.47

Situation at maximum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Lajoon 4026.03 89.02 3583.87 89.02 57.46 84.61 75.52 60.74

Current situation at minimum Demand of the feeder before capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Lajoon 531.50 95.64 508.34 95.64 1.03 1.51 17.16 99.47

Current situation at minimum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Lajoon 528.49 -96.18 508.32 -96.18 0.96 1.42 17.14 99.52
Losses% V.D.

2.22% 2.68%

Losses% V.D.

2.11% 2.53%

Losses% V.D.

3.38% 0.31%

Losses% V.D.

3.37% 0.16%
Feeder name Qutraneh
Average Power factor 0.86
Maximum Demand (A) 120
Minimum Demand 60
Ratio (Maximum/Minimum) 0.5
Desired Power Factor 0.9
Capacitor Loacation
Rating of the capacitor 300 KVAR
Capacitor Loacation
Rating of the capacitor 300 KVAR

Situation at maximum Demand of the feeder before capacitor placement


Total Load Total Load Cond Losses Total Losses
Losses%
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Qutraneh 6856.27 86.01 5897.39 86.01 97.24 142.99 158.29 48.96 2.68%

Situation at maximum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Losses%
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Qutraneh 6569.18 89.69 5892.11 89.69 91.93 135.17 153.01 48.79 2.60%

Current situation at minimum Demand of the feeder before capacitor placement


Total Load Total Load Cond Losses Total Losses
Losses%
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Qutraneh 3468.87 84.58 2933.81 84.58 24.88 36.59 67.19 67.78 2.29%

Current situation at minimum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Losses%
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Qutraneh 3188.38 91.94 2931.30 91.94 22.30 32.79 64.68 68.40 2.21%
V.D.

3.20%

V.D.

3.07%

V.D.

1.64%

V.D.

1.50%
Feeder name JV2
Average Power factor 0.85
Maximum Demand (A) 185 8977.40
Minimum Demand 65
Ratio (Maximum/Minimum) 35.1%
Desired Power Factor 0.9
Capacitor Loacation
Rating of the capacitor 300 KVAR
Capacitor Loacation
Rating of the capacitor 300 KVAR
Capacitor Loacation
Rating of the capacitor 300 KVAR
Capacitor Loacation
Rating of the capacitor 300 KVAR
`
Situation at maximum Demand of the feeder before capacitor placement
Total Load Total Load Cond Losses Total Losses
Losses%
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
JV2 10553.90 84.97 8967.12 84.97 424.62 752.00 692.26 43.14 7.72%

Situation at maximum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Losses%
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
JV2 10059.93 89.65 9018.92 89.65 392.58 695.41 662.88 42.84 7.35%

Current situation at minimum Demand of the feeder before capacitor placement


Total Load Total Load Cond Losses Total Losses
Losses%
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
JV2 3887.42 89.77 3489.56 89.77 57.86 102.30 140.14 54.68 4.02%

Current situation at minimum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Losses%
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
JV2 3556.83 98.82 3514.89 98.82 49.58 87.68 132.67 55.09 3.77%
V.D.

7.20%

V.D.

6.50%

V.D.

2.40%

V.D.
1.70%
Feeder name JV1
Average Power factor 0.85
Maximum Demand (A) 180
Minimum Demand 50
Ratio (Maximum/Minimum) 27.8% 3.6
Desired Power Factor 0.9
Capacitor Loacation
Rating of the capacitor 300 KVAR
Capacitor Loacation
Rating of the capacitor 300 KVAR
Capacitor Loacation
Rating of the capacitor 300 KVAR
Capacitor Loacation
Rating of the capacitor 300 KVAR
`
Situation at maximum Demand of the feeder before capacitor placement
Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW
JV1 10292.00 84.98 8746.33 84.98 374.33 631.24 613.51

Situation at maximum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW
JV1 9830.63 89.68 8815.72 89.68 345.56 582.73 587.53

Current situation at minimum Demand of the feeder before capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW
JV1 3311.59 90.16 2985.78 90.16 38.93 65.67 121.77

Current situation at minimum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW
JV1 3028.07 99.61 3016.32 99.61 32.93 55.56 116.99
Total Losses
Losses% V.D.
PF (%)
44.66 7.01% 6.70%

Total Losses
Losses% V.D.
PF (%)
44.34 6.66% 6.21%

Total Losses
Losses% V.D.
PF (%)
66.79 4.08% 2.10%

Total Losses
Losses% V.D.
PF (%)
67.88 3.88% 1.50%
Feeder name University
Average Power factor 0.87
Maximum Demand (A) 100
Minimum Demand 30
Ratio (Maximum/Minimum) 30.0%
Desired Power Factor 0.9
Capacitor Loacation
Rating of the capacitor 300 KVAR

Situation at maximum Demand of the feeder before capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
University 5715.16 87.02 4973.17 87.02 140.78 235.38 255.81 39.35

Situation at maximum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
University 5570.29 89.16 4966.48 89.16 134.42 224.70 249.11 39.19

Current situation at minimum Demand of the feeder before capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
University 1537.22 95.41 1466.63 95.41 9.97 16.68 51.35 76.62

Current situation at minimum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
University 1475.01 99.40 1466.12 99.40 9.31 15.58 50.83 77.19
Losses% V.D.

5.14% 6.00%

Losses% V.D.

5.02% 5.76%

Losses% V.D.

3.50% 1.38%

Losses% V.D.

3.47% 1.20%
Feeder name Southern
Average Power factor 0.87
Maximum Demand (A) 180
Minimum Demand 30
Ratio (Maximum/Minimum) 16.7%
Desired Power Factor 0.9
Capacitor Loacation
Rating of the capacitor 300 KVAR
Capacitor Loacation
Rating of the capacitor 300KVAR
Capacitor Loacation
Rating of the capacitor 300KVAR

Situation at maximum Demand of the feeder before capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Southern 10289.51 87.00 8951.39 87.00 188.63 311.56 364.55 38.17

Situation at maximum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Southern 9869.74 90.55 8936.77 90.55 174.77 288.18 349.98 37.85

Current situation at minimum Demand of the feeder before capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Southern 1507.71 -99.95 1506.88 -99.95 11.27 18.89 46.92 81.65

Current situation at minimum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Southern 1784.65 -84.56 1509.17 -84.56 13.06 21.95 49.17 80.38
Losses% V.D.

4.07% 3.60%

Losses% V.D.

3.92% 3.30%

Losses% V.D.

3.11% 0.28%

Losses% V.D.

3.26% -0.06%
Feeder name Sad Karameh
Average Power factor 0.85
Maximum Demand (A) 170 8.25
Minimum Demand 60 26.229767254975
Ratio (Maximum/Minimum) 35.3% 5.12150048862392
Desired Power Factor 0.9
Capacitor Loacation
Rating of the capacitor 300 KVAR
Capacitor Loacation
Rating of the capacitor 300 KVAR
`
Situation at maximum Demand of the feeder before capacitor placement
Total Load Total Load Cond Losses Total Losses
Losses%
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Sad Karam 9719.74 87.04 8459.66 87.04 634.72 1557.23 924.01 36.76 10.92%

Situation at maximum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Losses%
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Sad Karam 9527.76 89.45 8522.92 89.45 627.73 1532.63 919.61 36.85 10.79%

Current situation at minimum Demand of the feeder before capacitor placement


Total Load Total Load Cond Losses Total Losses
Losses%
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Sad Karam 3826.83 95.08 3638.74 95.08 100.42 245.97 191.76 45.50 5.27%

Current situation at minimum Demand of the feeder After capacitor placement


Total Load Total Load Cond Losses Total Losses
Losses%
Network ID kVA PF (%) kW PF (%) kW kVAR kW PF (%)
Sad Karam 3720.12 98.66 3670.18 98.66 98.26 238.81 190.46 45.83 5.19%
V.D.

13.92%

V.D.

13.50%

V.D.

4.90%

V.D.

4.50%
Feeder name Substation name Investement in capacitors (JD) annual revenue (JD)
Sad Karameh Subeihi 4000 668
Southern Karak 4000 2211
University Karak 2000 1017
JV1-subeihi Subeihi 8000 3942
JV2-subeihi Subeihi 8000 4458
Qutraneh Qutraneh 4000 1186
Lajoon Qutraneh 2000 601
Sulatni Qutraneh 2000 42