ANALYSIS OF CONTINUOUS FOOTING FOR NODES 188 TO 194

1148.16 1190.20 1265.88 1265.34 1265.16 1266.49 1268.55

1.74 3.72 3.72 3.72 3.72 3.72 3.72 2.19


A B C D E F G

Load @ A 1148.16 KN
Load @ B 1190.20 KN
Load @ C 1265.88 KN
Load @ D 1265.34 KN
Load @ E 1265.16 KN
Load @ F 1266.49 KN
Load @ G 1268.55 KN
Total 8669.78 KN
Self Wt. 866.98 KN
9536.76 KN
Area of the footing required with SBC as 100 KN/M 2
95.37 Sqm
Let width of the footing B 4.10 M
Length of footing 23.26 M
However keep length as L 26.25 M
Distance of centre of gravity of all column
loads from centre of A 11.38 M
Let L1 be the distance of left overhang from
the centre of the column
L1 +11.38 26.10/2
L1 1.74 M

80.56 KN/M
2
Net Upward Pressure qo

UDL 330.277 KN/M


say 330.00 KN/M

BM @ A -502.36 KN-M
BM @ B -656.54 KN-M
BM @ C -949.85 KN-M
BM @ D -1100.8 KN-M
BM @ E ### KN-M
BM @ F -982.05 KN-M
BM @ G -708.18 KN-M
DESIGN OF RAFT SLAB
700

600

500
200

4100

Net upward pressure 80.56 KN/M2

d 500-50-8 442.00 MM

BM @ beam face 116.40 KN-M


Factored Moment 174.60 KN-M

174.60 x 106 = 0.87*500Ast(d-Fy*Ast/(Fck*1000)

Ast 939.00 MM2

Provide # 16 @175 MM c/c as Main Reinforcement

Distribution Reinforcement

0.12% GCA 0.12% of 350 x 1000

420.00 MM2

Privide #12 @ 200 c/c in longitudinal direction


1148.16

SF Calculations 1.74
SF at LHS 0 KN End A

SF at A -575.81 KN L
SF at A 572.35 KN R
SF at B -655.25 KN L
SF at B 534.95 KN R
SF at C -692.65 KN L SFD A

SF at C 573.23 KN R KN

SF at D -654.37 KN L
SF at D 610.97 KN R
SF at E -616.63 KN L
SF at E 648.54 KN R
SF at F -579.06 KN L
SF at F 687.42 KN R
SF at G -540.18 KN L
SF at G 728.37 KN R
SF at RHS 0 End

BMD

KN-M

BM Calculations

Between
Section of th
A&B -6.01 KN-M
B&C -222.94 KN-M
C&D -451.97 KN-M
D&E -535.17 KN-M Thickness of
E&F -474.00 KN-M Thickness of
F&G -266.07 KN-M

BM at A -502.36 KN-M
BM at B -656.54 KN-M
BM at C -949.85 KN-M Betw
BM at D ### KN-M
BM at E ### KN-M
BM at F -982.05 KN-M
BM at G -708.18 KN-M
1190.20 1265.88 1265.34 1265.16 1266.49 1268.55 KN

3.72 3.72 3.72 3.72 3.72 3.72 2.19


B C D E F G

572.35 534.95 573.23


610.97 648.54 687.42
728.37

B C D E F G 0
1.73 1.62 1.74 1.85 1.97 2.08

-655.25
-692.65 -654.37 -616.63
-579.06 -540.18
-575.81

-6.01
-222.94
-266.07
-502.36
-451.97 -474.00
-535.17
-708.18
-949.85

-1100.76 -1111.27 -982.05

tion of the Raft Beam


B 700.00 MM
D 1100.00 MM
d 1040.00 MM
kness of Raft slab at free end 200.00 MM
kness of Raft slab at fixed end 500.00 MM

Fck 25 MPA # 10 4L @ 175 c/c


Fy 500 MPA Top &
Bottom
MU+/Bd2 MU-/Bd2 4#25 T
Between pt At pt
A&B - A 0.995 0.241 1#20
B&C 0.012 B 1.301 0.32 1#25
C&D 0.442 C 1.882 0.481 5#20
D&E 0.895 0.267 D 2.181 0.57 5#25
E&F 1.060 E 2.202 0.572 5#25
F&G 0.939 F 1.946 0.498 5#26
G 1.403 0.272 1#20
ANALYSIS OF CONTINUOUS FOOTING FOR NODES 179 TO 185

1452.43 1316.71 1326.89 1324.56 1324.57 1324.89 1335.05

2.07 3.72 3.72 3.72 3.72 3.72 3.72 1.81


A B C D E F G

Load @ A 1452.43 KN
Load @ B 1316.71 KN
Load @ C 1326.89 KN
Load @ D 1324.56 KN
Load @ E 1324.57 KN
Load @ F 1324.89 KN
Load @ G 1335.05 KN
Total 9405.09 KN
Self Wt. 940.51 KN
### KN
Area of the footing required with SBC as 100 KN/M 2
103.46 Sqm
Let width of the footing B 4.50 M
Length of footing 22.99 M
However keep length as L 26.20 M
Distance of centre of gravity of all column
loads from centre of A 11.03 M
Let L1 be the distance of left overhang from
the centre of the column
L1 +11.03 26.20/2
L1 2.07 M

79.77 KN/M
2
Net Upward Pressure qo

UDL 358.973 KN/M


say 359.00 KN/M

BM @ A -769.14 KN-M
BM @ B -614.54 KN-M
BM @ C -529.76 KN-M
BM @ D -476.94 KN-M
BM @ E -464.77 KN-M
BM @ F -493.18 KN-M
BM @ G -561.01 KN-M
DESIGN OF RAFT SLAB
700

600

500
200

4500

Net upward pressure 79.77 KN/M2

d 500-50-8 442.00 MM

BM @ beam face 143.99 KN-M


Factored Moment 215.98 KN-M

215.98 x 106 = 0.87*500Ast(d-Fy*Ast/(Fck*1000)

Ast 1187.00 MM2

Provide # 16 @150 MM c/c as Main Reinforcement

Distribution Reinforcement

0.12% GCA 0.12% of 350 x 1000

420.00 MM2

Privide #12 @ 200 c/c in longitudinal direction


SF Calculations
SF at LHS 0 KN End
SF at A -743.13 KN L
SF at A 709.30 KN R
SF at B -626.18 KN L
SF at B 690.53 KN R
SF at C -644.95 KN L
SF at C 681.94 KN R
SF at D -653.54 KN L
SF at D 671.01 KN R
SF at E -664.47 KN L
SF at E 660.10 KN R
SF at F -675.38 KN L
SF at F 649.51 KN R
SF at G -685.97 KN L
SF at G 649.08 KN R
SF at RHS 0 End

BM Calculations

Between

A&B -68.43 KN-M


B&C 49.57 KN-M
C&D 117.92 KN-M
D&E 150.16 KN-M
E&F 142.11 KN-M
F&G 94.37 KN-M

BM at A -769.14 KN-M
BM at B -614.54 KN-M
BM at C -529.76 KN-M
BM at D -476.94 KN-M
BM at E -464.77 KN-M
BM at F -493.18 KN-M
BM at G -561.01 KN-M
1452.43 1316.71 1326.89 1324.56 1324.57 1324.89 1335.05 KN

2.07 3.72 3.72 3.72 3.72 3.72 3.72 1.81


A B C D E F G

709.30 690.53 681.94


671.01 660.10 649.51
649.08

SFD A B C D E F G 0
KN 1.98 1.92 1.90 1.87 1.84 1.81

-626.18
-644.95 -653.54 -664.47
-675.38 -685.97
-743.13

150.16

117.92 142.11
94.37
49.57

-68.43

-476.94 -464.77 -493.18 -561.01


BMD -614.54 -529.76

KN-M -769.14

Section of the Raft Beam

B 700.00 MM
D 1100.00 MM
d 1040.00 MM
Thickness of Raft slab at free end 200.00 MM
Thickness of Raft slab at fixed end 500.00 MM

Fck 25 MPA
Fy 500 MPA

MU+/Bd2 MU-/Bd2
Between pt At pt
A&B - A 1.524 0.38 6 #25 @ bottom
B&C 0.098 B 1.218 0.30 4 #20 + 2#12 @ top
C&D 0.234 C 1.050 # 10 4L @ 175 c/c
D&E 0.297 0.17 D 0.945
0.255
E&F 0.282 E 0.921
F&G 0.187 F 0.977
G 1.111 0.272
Horizontal Vertical HorizontalMoment
Node L/C Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
169 4 5.737 487.799 17.881 17.341 -0.626 -5.297
170 4 -0.444 575.355 6.753 12.811 -0.619 0.666
171 4 -0.196 564.933 7.842 15.234 -0.076 0.366
172 4 -0.113 564.384 7.845 15.264 0.03 0.233
173 4 -0.047 564.207 7.771 15.069 0.023 0.119
174 4 0.019 564.09 7.733 14.968 0.01 0.004
175 4 0.099 564.127 7.755 14.994 -0.036 -0.126
176 4 0.348 573.34 7.626 14.464 0.636 -0.425
177 4 -5.788 489.071 17.558 16.741 0.754 5.496
178 4 5.393 672.677 -13.713 -13.402 -0.467 -5.076
179 4 -0.821 1452.43 16.489 47.116 -1.151 1.453
180 4 -0.571 1316.71 16.871 54.489 -0.255 1.003
181 4 -0.149 1326.89 17.028 54.762 0.058 0.498
182 4 -0.091 1324.56 16.863 53.98 0.054 0.347
183 4 -0.002 1324.57 16.768 53.561 0.01 0.17
184 4 0.121 1324.89 16.815 53.616 0.011 -0.051
185 4 0.626 1335.05 15.238 50.186 1.283 -0.671
186 4 -5.181 682.155 -14.033 -14.026 0.555 5
187 4 4.785 411.778 -3.143 -3.318 0.941 -4.683
188 4 -0.102 1148.16 -24.848 -73.159 1.083 -0.024
189 4 -0.198 1190.2 -13.064 -49.459 -0.669 0.062
190 4 0.198 1265.88 -14.952 -51.929 0.093 -0.234
191 4 0.186 1265.34 -14.968 -52.396 0.026 -0.18
192 4 0.159 1265.16 -15.052 -52.799 0.003 -0.151
193 4 0.226 1266.49 -15.121 -52.95 -0.026 -0.249
194 4 0.591 1268.55 -13.9 -50.322 -1.121 -0.683
195 4 -5.148 510.708 -0.227 -0.805 -0.451 4.965
196 4 3.831 365.836 -1.554 -1.888 -0.217 -3.73
197 4 -3.615 409.832 -7.734 -8.953 1.115 3.595
198 4 0.038 270.647 -9.595 -16.371 1.227 0.045
199 4 -0.143 333.092 -9.093 -16.141 -0.102 0.258
200 4 1.766 342.304 -9.101 -16.231 0.02 -1.564
201 4 -0.249 351.028 -9.141 -16.334 -0.004 0.399
202 4 -0.139 352.877 -9.167 -16.378 0.023 0.295
203 4 -0.097 350.994 -8.97 -15.877 -0.545 0.261
204 4 -1.996 282.107 -3.525 -4.105 -0.599 2.118
229 4 -0.569 422.954 4.843 3.293 -0.288 -0.26
234 4 1.674 388.117 0.95 0.634 0.027 -2.466
265 4 -0.028 349.213 -0.099 -0.161 -0.07 0.069
266 4 0.075 354.562 -0.012 -0.057 -0.022 -0.16
267 4 0.042 325.886 0.386 0.355 0.058 -0.099
268 4 -0.057 341.755 -0.192 -0.357 0.084 0.235
269 4 -0.13 353.672 -0.114 -0.261 -0.012 0.382
270 4 -0.042 327.293 0.303 0.171 -0.089 0.175
STAAD NISA

1452.43 1443.60 8.83


1316.71 1352.69 -35.98
1326.89 1311.19 15.70
1324.56 1362.58 -38.02
1324.57 1308.05 16.52
1324.89 1363.30 -38.41
1335.05 1314.79 20.26

1148.16 1163 -14.885


1190.2 1185.55 4.65333
1265.88 1248.41 17.4723
1265.34 1248.83 16.5087
1265.16 1248.11 17.0477
1266.49 1250.73 15.7517
1268.55 1247.79 20.7587

You might also like