PRELIMINARY LOAD CALCULATION FOR TEST PILE GUHAWATI

SUPERSTRUCTURE

VERTICAL LOADS LENGTH WIDTH HEIGHT/ TOTAL WEIGHT LOAD AT PILE


NO. (M) (M) DEPTH (M) WEIGHT (KN) EFFECT LEVEL

1 RCC RAILING 2 28.350 0.300 1.250 2.500 KN/M 141.750 1.000 141.75 KN
2 RCC CRASH BARRIER 2 28.350 0.500 0.900 25.000 KN/M^3 510.300 1.000 510.3 KN
3 WEARING COAT 1 28.350 14.500 0.053 22.000 KN/M^3 822.150 1.000 822.15 KN
4 DECK SLAB 1 28.350 14.500 0.220 25.000 KN/M^3 2260.913 1.000 2260.9125 KN
5 LONGI. GIRDER 5 28.350 - - 25.000 KN/M^3 614.000 5.000 3070 KN

TOTAL = 680.51125 T
SUBSTRUCTURE

1 PEDESTRAL 4 0.500 0.500 1.000 25.000 KN/M^3 25.000 1.000 25 KN


2 ABUTMENT CAP 1 13.500 2.300 1.800 25.000 KN/M^3 1721.000 1.000 1721 KN
3 BEARINGS 2 - - - 78.500 KN/SET 157.000 1.000 0 KN
4 ABUTMENT 1 1.800 1.800 6.000 25.000 KN/M^3 382.000 1.000 382.000 KN
5 PILE CAP 1 10.800 3.600 1.500 25.000 KN/M^3 1458.000 1.000 1458 KN
6 LIVE LOAD 4 CLASS A 2 - - - - KN/VEH. 2210.600 1.000 2210.6 KN

TOTAL = 358.600 T

VERTICAL LOAD PER PILE = 157.521406 T

HORIZONTAL LOADS Ka = 0.297 ϒ= 20.000 KN/M^3 H= 2.500 M Span = 25 M


W= 1.2 KN/M μ= 0.05 TEFLON ON STAILNESS STEEL b1 = 3.2 M
1 EARTH PRESSURE 1 14.5 269.15625 KN b2 = 21.8 M
2 SURCHARGE LOAD 14.5 258.39 KN
3 BRAKING FORCE 1 255.4 KN Rg/2 = 340.2556 T
TOTAL HORIZONTAL FORCES 255.4 KN Rq/2 = 110.53 T
782.94625 μ(Rg+Rq) = 22.53928
HORIZONTAL FORCE AT BEARING LEVEL = 35.3092813 T

MOMENT AT PILE TOP

DUE TO FORCE LA M

TOTAL MOMENT AT TOP OF PILE = 35.30928 5.5 194.201 T-M


COUPLE GENERATED DUE TO MOMENT = 3 64.73368 T-M
32.36684
TOTAL VERTICAL FORCE = 189.8882 T 125.1545651
PRELIMINARY LOAD CALCULATION FOR TEST PILE GUHAWATI

VERTICAL LOADS LENGTH WIDTH HEIGHT/ TOTAL WEIGHT LOAD AT PILE


NO. (M) (M) DEPTH (M) WEIGHT (KN) EFFECT LEVEL

1 RCC RAILING 2 29.300 0.300 1.250 2.500 KN/M 146.500 1.000 146.5 KN
2 RCC CRASH BARRIER 2 29.300 0.500 0.900 25.000 KN/M^3 527.400 1.000 527.4 KN
3 WEARING COAT 1 29.300 14.500 0.065 22.000 KN/M^3 849.700 1.000 849.7 KN
5 DECK SLAB 1 29.300 14.500 0.220 25.000 KN/M^3 2336.675 1.000 2336.675 KN
6 LONGI. GIRDER 4 29.300 - - 25.000 KN/M^3 735.000 5.000 3675 KN
7 END CROSS GIRDER 2 14.500 - - 25.000 KN/M^3 735.000 5.000 3675 KN
8 MIDDLE CROSS GIRDER 1 14.5
TOTAL = 753.5275 T

4 PEDESTRAL 4 1.200 1.200 0.500 25.000 KN/M^3 72.000 1.000 72 KN


5 ABUTMENT CAP(UNIFORM DEPTH) 1 8.000 3.800 1.000 25.000 KN/M^3 760.000 1.000 760 KN
6 ABUTMENT CAP (VARYING DEPTH) 2 3.100 3.800 1.000 25.000 KN/M^3 294.500 1.000 294.5 KN
7 BEARINGS 2 - - - 78.500 KN/SET 157.000 1.000 0 KN
8 PIER 1 1.800 1.800 6.000 25.000 KN/M^3 382.000 1.000 382.000 KN
9 PILE CAP 1 10.800 3.600 1.500 25.000 KN/M^3 1458.000 1.000 1458 KN
10 LIVE LOAD 2 CLASS A &1 70 R 4 - - - 55.400 KN/VEH. 2974.600 1.000 2974.6 KN

TOTAL = 792.694 T

VERTICAL LOAD PER PILE DUE TO DL & LL = 132.115625 T

HORIZONTAL LOADS Ka = 0.297 ϒ= 20.000 KN/M^3 H= 4.000 M Span = 25 M


W= 1.2 KN/M μ= 0.03 TEFLON ON STAILNESS STEEL b1 = 3.2 M
1 EARTH PRESSURE 1 14 665.28 KN b2 = 21.8 M
2 SURCHARGE LOAD 14 399.168 KN
3 BRAKING FORCE 1 255.4 KN Rg = 753.5275 T
TOTAL HORIZONTAL FORCES 255.4 KN Rq = 297.46 T
μ(Rg+Rq) = 31.52963
HORIZONTAL FORCE AT BEARING LEVEL = 44.299625 T 376.76375

183.333333333
MOMENT AT PILE TOP

DUE TO FORCE LA M U= 0.03 23.9903 5.5 131.9469


U*(Rg+Rq) 31.529625 Pier 3 43.9823
TOTAL MOMENT AT TOP OF PILE = 44.29963 5.5 243.6479 T-M U*(Rg+Rq) 22.53928125 Abutment 14.66077
COUPLE GENERATED DUE TO MOMENT = 3 81.21598 T 23.99034375 146.7764
40.60799

TOTAL VERTICAL FORCE PER PILE = 172.7236 T 91.50763542


PRELIMINARY LOAD CALCULATION FOR TEST PILE GUHAWATI

VERTICAL LOADS LENGTH WIDTH HEIGHT/ TOTAL WEIGHT LOAD AT PILE


NO. (M) (M) DEPTH (M) WEIGHT (KN) EFFECT LEVEL

8 GIRDER 5 31.050 - - 25.000 KN/M^3 775.000 5.000 3875 KN

LOAD PER PILE = 64.5833333 T


MOMENT AT PILE TOP

DUE TO FORCE LA M

TOTAL MOMENT AT TOP OF PILE = 23.29 0.75 17.4675 T-M


COUPLE GENERATED DUE TO MOMENT = 3 5.8225 T
2.91125

TOTAL VERTICAL FORCE PER PILE = 67.49458 T


SPAN 1 = 26650 m
SPAN2 = 31050 m
SPAN3 = 27400 m

LONGUTUDINAL GIRDER AT SUPPORT = 1.605 m^2 SPACING = 2.8


LONGITUDINAL GIRDER AT FLARING = 1.259 m^2
LONGITUDINAL GIRDER AT MIDSPAN = 0.913 m^2

WIDTH OF CARRIAGEWAY = 14.5 M


THICKNESS OD DECK SLAB = 220 mm
WC = 53 mm

PILE CAP = 7.3*1.5*4.3


PIER CAP(UNIFORM DEPTH) = 8*1*3.8 PIER CAP(UNIFORM DEPTH) =
PIER CAP(VARYING DEPTH) = 6.2*1*3.8 PIER CAP(VARYING DEPTH) =

PIER = 1.8 m DIA.


PILE DIA.= 1 m DIA.
C/C PILE GAP = 3m
m

8*1*2.5
6.2*1*2.5
MID SUPPORT FLARE
A= 1.08
A1 = 0.135 A1 = 0.135 m^2
A2 = 0.015 A2 = 0.0825 m^2
A3 = 0.015 A3 = 1.14375 m^2
A4 = 0.285 A= 1.36125 m^2
A5 = 0.028125
A6 = 0.028125
A7 = 0.03
A8 = 0.075
A9 = 0.1875
A= 0.79875

L 4.3
B 4.3

A1 = 18.49 m2
A1/4 = 27.735 m3
Pile
A= 0.78 m2
19.11 m3

A1/4-A = 26.955 m2

1010.813 KN