REKAPITULASI KEBUTUHAN BESI KILN

No. Item Pekerjaan Berat


D25 D19 D16 D13 d12 d10
kg Ljr Kg Ljr Kg Ljr Kg Ljr Kg Ljr Kg Ljr Kg

1 ABUTMEN
A PELAT DASAR /FONDASI #REF! #VALUE! #REF!
B WALL DEPAN 23.00 18.00
C KONSOL DEPAN 8.00 4.00
D KONSOL BELAKANG 7.00 4.00
E WALL SAMPING 67.00
F SLAB ATAS 46.00
G WALL TARIK 17.00

TRESTEL -
A PHT 103.00 76.00 49.00
B PILE CAP 472.38
C BALOK 420.00 139.00 505.00
D SLAB 996.00

3 DERMAGA
A PHT 72.00 48.00 48.00
B PILE CAP 890.40
C BALOK 500.00 64.00 492.45
D SLAB 814.00

4 MOORING DOLPHIN
A PHT 72.00 48.00 48.00
B MOORING

5 BREASTING DOLPHIN
A PHT 72.00 48.00 48.00
B MOORING

6 PIEL CAP CAT WALK


A PHT 156.00 104.00 47.00
B PEIL CAP (P7) 18.00 109.20

Total - #REF! - #VALUE! - 565.00 - #REF! - 26.00 240.00 -


#VALUE! 945.00 43,659.00 #VALUE! #VALUE! 565.00 10,712.40 #REF! #REF! 26.00 277.16 240.00 1,776.00
sudah datang 945.00 1,297.00

46.20 26.76 18.96 12.48 10.66 7.40

Banyuwangi, 17 Februari 2011


PT. Swadaya Graha

Chusnur Rofiq
Enginering
awal maret

awal maret
Project : Pembangunan Packing Plant Bywg Date print Saturday, 19 May 2018
Subcont. No. :
BAR BENDING SCHEDULE Revision 0
Title of Work : Abutmen ABUTMEN DERMAGA Prepared by CHN SWG-CR
Subcontractor : PT. SWADAYA GRAHA Checked by SWG-au
Rev : Approval by ST V- M
Length (mm) Quantity
Length
No. Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
1 2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17

I PLAT PONDASI BOILER #REF! Total Weight

A PELAT DASAR /FONDASI #REF!


A.1 Bottom Bar See Drawing No.
arah x bb d8 1940 40 40 2.020 112 0.40 89.36 56.00 7.96 56 P3B-C8-DW-023
arah y bb d8 940 40 40 1.020 224 0.40 90.25 112.00 9.96 112 Rev 0

SLOOF PONDASI SP d19 1940 290 290 2.520 64 2.23 360.14 32.00 6.96 32
d8 700 600 1.300 224 0.40 115.02 112.00 9.40 112
d16 1940 290 290 2.520 32 1.58 127.65 16.00 6.96 16

Kolom pendek d16 1920 290 290 2.500 96 1.58 379.92 48.00 7.00 48
d8 500 800 1.300 208 0.40 106.81 104.00 9.40 104

d8 384.00
d16 64.00
d19 32.00

#REF!
A.2 Top Bar
code no.abm-fond-y/tb bb D19 3350 380 380 4.110 30 - 15.00 3.78 15 dipakai di trestel
code no.abm-fond-x/tb `` bb D19 4350 380 380 5.110 24 - 12.00 1.78 12

B WALL DEPAN c 493.21


B.1 Tulangan Utama
code no.abm-wall-v vw D16 640 4400 350 5.39 46 1.58 391.33 23.00 1.22 23

1.9
a

B.2 Stirup wall


code no.abm-wall-s a c sw d12 120 4350 120 4.59 36 0.62 101.88 18.00 2.82 18
b

C KONSOL DEPAN 134.39


C.1 Tulangan Utama a
code no.abm-konsol dpn-u e ku D16 800 400 750 250 160 2.36 30 1.58 111.75 7.00 2.56 7
b 1.00 7.28 1 dipakai konsol belakang D

c d

C.2 Stirup konsol


code no.abm-konsol dpn-s sk d12 120 4350 120 4.59 8 0.62 22.64 4.00 2.82 4

file:387595334.xls-abutmen _____________
page 3 of 29
Length (mm) Quantity
Length
No. Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
1 2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17

D KONSOL BELAKANG 142.43


D.1 Tulangan Utama a
code no.abm-konsol blk-u e ku D16 500 800 750 160 160 160 2.53 30 1.58 119.80 7.00 1.88 7
b 1.00 2.22 1 sisa potongan tul konsol C

c f
d

D.2 Stirup konsol


code no.abm-konsol blk-s sk d12 120 4350 120 4.59 8 0.62 22.64 4.00 2.82 4
a b c

E WALL SAMPING a 728.82 67.00


E.1 Tulangan Utama (VERTIKAL)
code no.abm-wall samping-vb vw D13 520 4350 130 5.00 72 1.04 375.10 36.00 2.00 36 dipakai medium bar plat pondasi

E.2 Stirup (horisontal)


code no.abm-wall samping-hb a b c sw D13 120 3450 120 3.69 92 1.04 353.72 30.00 0.93 30 dipakai medium bar plat pondasi
1.00 4.62 1 dipakai stirup wall tarik

F SLAB ATAS
F.1 Bottom Bar 435.95 22.00 46.00
code no.abm-slab atas-x/bb b a b bb D13 4400 150 150 4.700 22 1.04 107.74 11.00 2.60 11 dipakai medium bar plat pondasi
code no.abm-slab atas-y/bb bb D13 4300 150 150 4.600 23 1.04 110.24 11.00 2.80 11 dipakai medium bar plat pondasi
4.620 dari stirup wall samping 1.00 0.02 1 dipakai ke top bar salb atas

F.2 Top Bar


code no.abm-slab atas-x/tb b a b `` tp D13 4400 150 150 4.70 22 1.04 107.74 11.00 2.60 11 dipakai medium bar plat pondasi
code no.abm-slab atas-y/tb tp D13 4300 150 150 4.60 23 1.04 110.24 11.00 2.80 11 dipakai stirup wall tarik
D13 1.00 7.40 1 dipakai stirup wall tarik

G WALL TARIK a 225.39 17.00


G.1 Tulangan Utama (VERTIKAL)
code no.abm-wall samping-vb vw D13 520 2250 130 2.90 40 1.04 120.87 10.00 0.40 10

E.2 Stirup (horisontal)


code no.abm-wall samping-hb a b c sw D13 120 1850 120 2.09 48 1.04 104.53 6.00 1.55 6 dipakai di trestel
1.00 3.64 1
dari stirup wall samping & top bar slab atas
2.80 11.00 0.71 11
7.40 3.00 1.13 1
34.00
30.00

``
`
Banyuwangi, 17 Februari 2011
file:387595334.xls-abutmen _____________
page 4 of 29
Length (mm) Quantity
Length
No. Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
1 2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17
PT. Swadaya Graha

6 16 2.5 20

Chusnur Rofiq
Enginering

file:387595334.xls-abutmen _____________
page 5 of 29
Project : Pembangunan Gudang temanggung Date print Saturday, 19 May 2018
Subcont. No. :
BAR BENDING SCHEDULE Revision 0
Title of Work Boiler TRESTEL DERMAGA Prepared by Hty SWG-CR
Subcontractor : PT. SWADAYA GRAHA Checked by SWG-au
Rev : Approval by ST V- M
Length (mm) Quantity
Length
No. Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
### 2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17

I BOILER Total Weight

BPILE CAP
P1 23 unit
23 7.50
bottom b b 449.88
Arah X a d10 850 50 0.95 230 - 19.17 0.60 19.00 dipakai utk stek bar
Arah Y d8 1,400 100 1.60 138 - 19.71 0.80 19.71 dipakai utk stek bar

Top
Arah X b a b d8 850 50 0.95 230 - 19.17 0.60 19.00
Arah Y d8 1,400 100 1.60 138 - 19.71 0.80 19.71

1ljr 12.00 m'


beam bawah 4.00 6.32
bottom c c D16 1,400 200 50 1.90 69.0 - 11.50 0.60 11.50 WASTE
Arah X b b
Arah Y a ambil abutmen
3.6400 1.0 2.00 (0.16) 1.0 dari wall tarik stirup

Horisontal D13 1,150 200 200 1.55 1,104.0 1.04 1,782.98 191.00 1.15 191.00
1.00 10.45 1.00 dipakai untuk P1 conveyor
ambil abutmen 1337
1.55 6 dari wall tarik stirup
0.60 12 (0.95) 12 dari wall vertikal
kurang -251

b c
a

insitu
e a 1.00
Horisontal
D13 500 750 500 750 130 2.63 138.00 1.04 378.16 34.50 1.48 34.50 dipakai utk stek bar
d b

Vertical Top b c D13 750 500 500 1.75 276.0 1.04 503.26 46.00 1.50 46 dipakai utk stek bar
Bottom a

stek
Horisontal D13 1,250 1.25 92.0 1.04 119.82
ambil bottom 0.60 19.0 (0.65) 19
1.50 56.0 0.25 56

vertikal D13 1,200 1.20 184.0 1.04 230.06


ambil bottom 0.80 19.7 (0.40) 20
1.50 (10.0) 0.30 -10
1.48 34.5 0.28 35
1.480 13.0 0.28 13
1.480 11.0 0.28 11
1.150 104.0 104
P1 6 unit (conveyor) 172.21
Precast 6 a
bottom 1.00
Arah X b d D13 1,150 100 1,150 100 130 2.63 54.0 1.04 147.98 13.00 1.48 13 dipakai stek bar P1 trestel

file:387595334.xls-trestel _____________
page 6 of 29
Length (mm) Quantity
Length
No. Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
### 2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17
Arah Y c e D13 1,150 100 1,150 100 130 2.63 54.00 1.04 147.98 13.00 1.48 13 dipakai stek bar P1 trestel
ambil dari peil cap wall 104
10.45 3 2.56 1
ambil dari ins 6.74 1 4.11 1

Wall cek ngikuti atas e a 4.00


Vertical D13 700 100 700 100 130 1.73 216.0 1.04 389.36 36.00 1.62 36.00 WASTE
Horisontal
d b
D13 1,150 200 200 1.55 288.0 1.04 465.13 42.00 1.15 42.00 dipakai stek bar P1 trestel
c (110.00)
41.14

insitu
Vertical e a 1.00 13.50
Horisontal D13 750 500 750 500 130 2.63 54.0 1.04 147.98 13.00 1.48 13 52.00
D13 1.00 6.74 1 2.00
D13 500 750 500 750 130 2.63 36.0 1.04 98.65 9.00 1.48 9 36.00

d b

stek
Horisontal D13 1,250 1.25 24.0 1.04 31.26
ambil dari ins 1.48 13.0 0.23 13
1.48 9.0 0.23 9
1.48 2.0 0.23 2 24.00
vertikal D13 1,200 1.20 48.0 1.04 60.02
ambil dari wa 1.15 48.0

CBALOK 505.00
B3 (500/800)
L-6M UNIT 28
Tulangan Utama
b a b D25 6000 100 100 14 6.200 392 3.85 9,365.21 392.00 5.80 392 #VALUE!
D25 3000 100 100 6 3.200 168 3.85 2,071.57
5.800 168 - 2.60 168 114.00

L-4M UNIT 9 3.00


Tulangan Utama
b a b D25 4000 100 100 14 4.200 126 3.85 2,039.20
5.800 126 1.60 126
D25 2000 100 100 6 2.200 54 3.85 457.78
2.600 54 54.00 0.40 54

L - 4.5 M UNIT 6
Tulangan Utama
b a b D25 3200 100 100 14 3.400 84 3.85 1,100.52
4.800 56 1.40 56
4.590 14 1.19 14
5.800 14 2.40 14

D25 1600 100 100 6 1.800 36 3.85 249.70


1.850 36 - 0.05 36

L - 4.43 M UNIT 5
Tulangan Utama
b a b D25 4430 100 100 14 4.630 70 3.85 1,248.87
dari dermaga 4.800 8

file:387595334.xls-trestel _____________
page 7 of 29
Length (mm) Quantity
Length
No. Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
### 2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17
4.800 34
4.800 28

D25 2215 100 100 6 2.415 30 3.85 279.18


5.800 15.00 30.00 0.97 15

L - 4,63 M UNIT 1 4.80 24.00 20.00 0.17 20.00


Tulangan Utama
b a b D25 4430 100 100 14 4.630 14 3.85 249.77
dari dermaga 4.800 14 14.00 0.17 14

D25 2215 100 100 6 2.415 6 3.85 55.84


dari dermaga 2.815 6 6.00 0.40 6

3.00
L - 5,57 M UNIT 1
Tulangan Utama
b a b D25 5570 100 100 14 5.770 14 3.85 311.27
dari yg lain 5.780
D25 2785 100 100 6 2.985 6 3.85 69.01
dari dermaga 5.800 6 6.00 2.82 6

L - 7,2 M UNIT 1 18.00


Tulangan Utama
b a b D25 7210 100 100 14 7.410 14 3.85 399.75 14.00 4.59 14
D25 3605 100 100 dari dermaga 6 3.805 6 3.85 87.97
4.300 6 -

3.00
L - 6.3 M UNIT 1
Tulangan Utama
b a b D25 6020 100 100 14 6.220 14 3.85 335.55 14.00 5.78 14 dipakai diatas
D25 3010 100 100 6 3.210 6 3.85 74.22
dari dermaga 5.800 6 - 2.59 6

14.00
DSLAB 995.95 996.00
TYPE 1 UNIT 1
Bottom
arah x b a b D13 1700 130 130 1.96 5 1.04 10.21 0.82
arah Y D13 890 130 130 1.15 9 1.04 10.78 0.86
Top
arah x b a b D13 1700 130 130 1.96 5 1.04 10.21 0.82
arah Y D13 890 130 130 1.15 9 1.04 10.78 0.86
c
Shear Conector
b d D13 130 200 200 200 130 0.86 51 1.04 45.70 3.66

a e

TYPE 2 UNIT 2
Bottom
arah x b a b D13 850 130 130 1.11 10 1.04 11.57 0.93
arah Y D13 890 130 130 1.15 10 1.04 11.98 0.96
Top
arah x b a b D13 850 130 130 1.11 10 1.04 11.57 0.93
arah Y D13 890 130 130 1.15 10 1.04 11.98 0.96
c
Shear Conector
b d D13 130 200 200 200 130 0.86 48 1.04 43.01 3.44

a e

TYPE 3 UNIT 26
Bottom
arah x b a b D13 850 130 130 1.11 754 1.04 872.05 69.75
arah Y D13 5660 130 130 5.92 130 1.04 801.88 64.13
Top
arah x b a b D13 850 130 130 1.11 754 1.04 872.05 69.75
arah Y D13 5660 130 130 5.92 130 1.04 801.88 64.13
c
Shear Conector

file:387595334.xls-trestel _____________
page 8 of 29
Length (mm) Quantity
Length
No. Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
### 2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17
b d D13 130 200 200 200 130 0.86 2704 1.04 2,422.99 193.79

a e

TYPE 4 UNIT 30
Bottom
arah x b a b D13 1700 130 130 1.96 450 1.04 919.00 73.50
arah Y D13 2830 130 130 3.09 270 1.04 869.30 69.53
Top
arah x b a b D13 1700 130 130 1.96 450 1.04 919.00 73.50
arah Y D13 2830 130 130 3.09 270 1.04 869.30 69.53
c
Shear Conector
b d D13 130 200 200 200 130 0.86 1620 1.04 1,451.64 116.10

a e

TYPE 5 UNIT 1
Bottom
arah x b a b D13 1884 130 130 2.14 26 1.04 58.08 4.65
arah Y D13 5023 130 130 5.28 10 1.04 55.05 4.40
Top
arah x b a b D13 1884 130 130 2.14 26 1.04 58.08 4.65
arah Y D13 5023 130 130 5.28 10 1.04 55.05 4.40
c
Shear Conector
b d D13 130 200 200 200 130 0.86 50 1.04 44.80 3.58

a e

TYPE 6 UNIT 1
Bottom
arah x b a b D13 694 130 130 0.95 31 1.04 30.81 2.46
arah Y D13 6088 130 130 6.35 4 1.04 26.46 2.12
Top
arah x b a b D13 694 130 130 0.95 31 1.04 30.81 2.46
arah Y D13 6088 130 130 6.35 4 1.04 26.46 2.12

c
Shear Conector
b d D13 130 200 200 200 130 0.86 20 1.04 17.92 1.43

a e

TYPE 7 UNIT 1
Bottom
arah x b a b D13 4000 130 130 4.26 28 1.04 124.28 9.94
arah Y D13 5600 130 130 5.86 20 1.04 122.12 9.77
Top
arah x b a b D13 4000 130 130 4.26 28 1.04 124.28 9.94
arah Y D13 5600 130 130 5.86 20 1.04 122.12 9.77

c
Shear Conector
b d D13 130 200 200 200 130 0.86 195 1.04 174.73 13.98

a e

TYPE 8 UNIT 1
Bottom
arah x b a b D13 854 130 130 1.11 30 1.04 34.82 2.79
arah Y D13 5981 130 130 6.24 5 1.04 32.51 2.60
Top
arah x b a b D13 854 130 130 1.11 30 1.04 34.82 2.79
arah Y D13 5981 130 130 6.24 5 1.04 32.51 2.60

file:387595334.xls-trestel _____________
page 9 of 29
Length (mm) Quantity
Length
No. Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
### 2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17

c
Shear Conector
b d D13 130 200 200 200 130 0.86 52 1.04 46.60 3.73

a e

TYPE 9 UNIT 1
Bottom
arah x b a b D13 800 130 130 1.06 4 1.04 4.42 0.35
arah Y D13 900 130 130 1.16 5 1.04 6.04 0.48
Top
arah x b a b D13 800 130 130 1.06 4 1.04 4.42 0.35
arah Y D13 900 130 130 1.16 5 1.04 6.04 0.48

c
Shear Conector
b d D13 130 200 200 200 130 0.86 4 1.04 3.58 0.29

a e

TYPE 10 UNIT 1
Bottom
arah x b a b D13 1600 130 130 1.86 5 1.04 9.69 0.78
arah Y D13 900 130 130 1.16 8 1.04 9.67 0.77
Top
arah x b a b D13 1600 130 130 1.86 5 1.04 9.69 0.78
arah Y D13 900 130 130 1.16 8 1.04 9.67 0.77

c
Shear Conector
b d D13 130 200 200 200 130 0.86 8 1.04 7.17 0.57

a e

TYPE 11 UNIT 1
Bottom
arah x b a b D13 4499 130 130 4.76 5 1.04 24.79 1.98
arah Y D13 961 130 130 1.22 23 1.04 29.26 2.34
Top
arah x b a b D13 4499 130 130 4.76 5 1.04 24.79 1.98
arah Y D13 961 130 130 1.22 23 1.04 29.26 2.34

c
Shear Conector
b d D13 130 200 200 200 130 0.86 22 1.04 19.71 1.58

a e

TYPE 12 UNIT 1
Bottom
arah x b a b D13 854 130 130 1.11 5 1.04 5.80 0.46
arah Y D13 961 130 130 1.22 4 1.04 5.09 0.41
Top
arah x b a b D13 854 130 130 1.11 5 1.04 5.80 0.46
arah Y D13 961 130 130 1.22 4 1.04 5.09 0.41

file:387595334.xls-trestel _____________
page 10 of 29
Length (mm) Quantity
Length
No. Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
### 2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17

c
Shear Conector
b d D13 130 200 200 200 130 0.86 4 1.04 3.58 0.29

a e

``

``
`
Banyuwangi, 17 Februari 2011
PT. Swadaya Graha

Chusnur Rofiq
Enginering

file:387595334.xls-trestel _____________
page 11 of 29
: Pembangunan Packing Plant Bywg Date print Saturday, 19 May 2018
:
BAR BENDING SCHEDULE Revision 0
: Dermaga DERMAGA Prepared by CHN SWG-CR
: PT. SWADAYA GRAHA Checked by SWG-au
: Approval by ST V- M
Length (mm) Quantity
Length
Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17

DERMAGA Total Weight

PHT 500.00
P1 & P3 DIA 700 MM UNIT 12 12.00
Tulangan utama a D19 1650 990 2.64 144.00 2.23 846.12 36.00 1.44 36
Tulangan Pengantung D16 1650 990 8.000 2.64 96.0 1.58 400.01 24.00 1.44 24

Tulangan stirup d10 1884 13.667 25.748 12.00 0.62 190.50 26.0
a 700

P2 DIA 600 MM UNIT 12 12.00


Tulangan utama a D19 1650 990 2.64 144.00 2.23 846.12 36.00 1.44 36
Tulangan Pengantung D16 1650 990 8.000 2.64 96.0 1.58 400.01 24.00 1.44 24

Tulangan stirup d10 1570 13.667 21.457 12.00 0.62 158.75 22.0
600
a

PILE CAP
P1 6 unit 848.00
Precast 6 a
bottom 1.00
Arah X b d D13 1,150 100 1,150 100 130 2.63 54.0 1.04 147.98 13.00 1.48 13 dipakai utk stek bar
Arah Y c e D13 1,150 100 1,150 100 130 2.63 54 1.04 147.98 14.00 1.48 14 dipakai utk stek bar

Wall e a 4.00
Vertical D13 700 100 700 100 130 1.73 216.0 1.04 389.36
Horisontal
D13 1,150 200 200 1.55 288.0 1.04 465.13 191.00 1.15 191.00 dipakai utk stek bar
d b 47.00

insitu
e a 1.00
Horisontal D13 500 750 500 750 130 2.63 36.00 1.04 98.65 9.00 1.48 9.00 dipakai utk stek bar
D13

d b

Vertical Top b c D13 750 500 500 1.75 72.0 1.04 131.29 12.00 1.50 12
Bottom a

stek
Horisontal D13 1,250 1.25 24.0 1.04 31.26
D13 1.48 13.0 0.23 13
D13 1.48 11.0 0.23 11

vertikal D13 1,200 1.20 48.0 1.04 60.02


1.15 48

file:387595334.xls-dermaga _____________
page 12 of 29
Length (mm) Quantity
Length
Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17

P2 6 unit
Precast 6 a
bottom 2 1.00
Arah X b d D13 1,150 100 1,150 100 130 2.63 108.0 1.04 295.96 27.00 1.48 27 dipakai utk stek bar
Arah Y c e D13 1,150 100 1,150 100 130 2.63 108.00 1.04 295.96 27.00 1.48 27
8.00

Wall 2 e a 4.00
D13 500 750 500 750 130 2.63 144.00 1.04 394.61 36.00 1.48 36.00
Horisontal

d b

Vertical Top b c D13 750 500 500 1.75 576.0 1.04 1,050.28 96.00 1.50 96 dipakai utk stek bar
Bottom a

insitu 2
Vertical e a 1.00
Horisontal D13 750 500 750 500 130 2.63 108.0 1.04 295.96 27.00 1.48 27
D13 500 750 500 750 130 2.63 72.00 1.04 197.30 18.00 1.48 18

d b

Vertical Top b c D13 750 500 500 1.75 144.0 1.04 262.57 24.00 1.50 24 dipakai utk stek bar
Bottom a

stek
Horisontal 2 D13 1,250 1.25 48.0 1.04 62.52
1.48 3.0 3.00 0.23 3
1.48 9.0 9.00 0.23 9
1.50 12.0 12.00 0.25 12
1.48 27.0 27.00 0.23 27

vertikal 2 D13 1,200 1.20 96.0 1.04 120.03


1.15 96

P3 6 unit
Precast 6 a
bottom 1.00
Arah X b d D13 1,150 100 1,150 100 130 2.63 90.0 1.04 246.63 22.00 1.48 22
Arah Y c e D13 2,013 100 2,013 100 130 4.36 54.00 1.04 245.09 27.00 3.29 27

Wall e a 2.00
Vertical D13 2,013 100 2,013 100 130 4.36 72.0 1.04 326.79 24.00 3.29 24
Horisontal D13 700 100 700 100 130 1.73 180.00 1.04 324.46 15

d b 2.00
D13 1,250 100 1,250 100 130 2.83 72.0 1.04 212.31 18.00 0.68 18
D13 700 100 700 100 130 1.73 108.00 1.04 194.68 18.00 1.62 18

file:387595334.xls-dermaga _____________
page 13 of 29
Length (mm) Quantity
Length
Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17

STEK
ATAS D13 1,200 - 1.20 66.00 1.04 82.52
D13 1.15 47.00
D13 1.48 19.00
D13
Horisontal D13 2,200 - 2.20 36.00 1.04 82.52
D13 3.29 27.00 27.00 1.09 27
D13 3.29 9.00 9.00 1.09 9

BAWAH D13 2,120 - 2.12 36.00 1.04 79.52


D13 3.29 15.00 15.00 1.17 15
D13 3.88 14.00 14.00 1.76 14
D13
a
b b D13 1,150 750 130 4.06 27.00 1.04 114.22 14.00 3.88 14
a c

insitu
Vertical e a 1.00
Horisontal D13 750 500 750 500 130 2.63 90.0 1.04 246.63 23.00 1.48 23
D13 1,600 750 1,600 750 130 4.83 36.00 1.04 181.17 18.00 2.34 18

d b

STEK
ATAS D13 1,350 - 1.35 66.00 1.04 92.84
D13 1.48 8.00 8.00 0.13 8
D13 1.48 36.00 36.00 0.13 36
D13 1.48 22.00 22.00 0.13 22
D13

BAWAH D13 2,120 - 2.12 36.00 1.04 79.52 8.00 1.40 8

D13 1,150 - 1.15 27.00 1.04 32.35

BALOK 469.00
B1 (500/850)
L-6M UNIT 10
Tulangan Utama
b a b D25 6000 100 100 12 6.200 120 3.85 2,866.90 120.00 5.80 120
D25 3000 100 100 6 3.200 60 3.85 739.85
4.800 60 - 1.60 60

L-7M UNIT 12 (13.00)


Tulangan Utama
b a b D25 7000 100 100 12 7.200 144 3.85 3,995.16 144.00 4.80 144
D25 3500 100 100 6 3.700 72 3.85 1,026.54 56 dipakai balok terstel
4.300 72 - 0.60 72

Tulangan Susut D25 6 D25 7000 100 100 4.000 7.20 24.0 3.85 665.86 24.00 4.80 24 dipakai balok terstel
L - 7,5 M UNIT 6 (3.00)
Tulangan Utama
b a b D25 7500 100 100 12 7.700 72 3.85 2,136.30 72.00 4.30 72
D25 3750 100 100 6 3.950 36 3.85 547.95
5.800 36 36.00 1.85 36 dipakai ditrestel

Tulangan Susut D25 7500 100 100 4.000 7.70 24.0 3.85 712.10 24.00 4.30 24 8.00

Tulangan Geser a
B2 (500/650) -
L-6M UNIT 6 (3.00)
Tulangan Utama
b a b D25 6000 100 100 12 6.200 72 3.85 1,720.14 72.00 5.80 72 3.00
D25 3000 100 100 4 3.200 24 3.85 295.94
file:387595334.xls-dermaga _____________
page 14 of 29
Length (mm) Quantity
Length
Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17
5.800 12 2.60 12
5.800 12 - 2.60 12

Tulangan Susut D25 6000 100 100 2.000 6.20 12.0 3.85 286.69 12.00 5.80 12

Tulangan Geser a
L-7M UNIT 4 (4.00)
Tulangan Utama (7.00)
b a b D25 7000 100 100 12 7.200 48 3.85 1,331.72 48.00 4.80 48 dipakai balok terstel
D25 3500 100 100 4 3.700 16 3.85 228.12 34 dipakai balok terstel
4.300 16 16.00 0.60 16

Tulangan Susut D25 7000 100 100 2.000 7.20 8.0 3.85 221.95 8.00 4.80 8 dipakai balok terstel

Tulangan Geser a
c D13 510 360 130 2.00 72 1.04 150.04 12.00
D13 510 360 130 2.00 140 1.04 291.75 24.00
\
b 5.75

a
D13 360 130 130 0.62 72 1.04 46.51 4.00 0.22 4 76.00
D13 360 130 130 0.62 140 1.04 90.44 8.00 0.22 8 152.00
212 228.00
16.00
9.00
SLAB 813.80 814.00
TYPE 13 UNIT 2
Bottom
arah x b a b D13 1300 130 130 1.56 8 1.04 13.00 1.04
arah Y D13 794 130 130 1.05 14 1.04 15.37 1.23
Top
arah x b a b D13 1300 130 130 1.56 8 1.04 13.00 1.04
arah Y D13 794 130 130 1.05 14 1.04 15.37 1.23
c
Shear Conector
b d D13 130 200 200 200 130 0.86 102 1.04 91.40 7.31

a e

TYPE 14 UNIT 8
Bottom
arah x b a b D13 1300 130 130 1.56 104 1.04 169.05 13.52
arah Y D13 2594 130 130 2.85 56 1.04 166.53 13.32
Top
arah x b a b D13 1300 130 130 1.56 104 1.04 169.05 13.52
arah Y D13 2594 130 130 2.85 56 1.04 166.53 13.32
c
Shear Conector
b d D13 130 200 200 200 130 0.86 432 1.04 387.10 30.96

a e

TYPE 15 UNIT 2
Bottom
arah x b a b D13 1300 130 130 1.56 14 1.04 22.76 1.82
arah Y D13 1300 130 130 1.56 14 1.04 22.76 1.82
Top
arah x b a b D13 1300 130 130 1.56 14 1.04 22.76 1.82
arah Y D13 1300 130 130 1.56 14 1.04 22.76 1.82
c
Shear Conector
b d D13 130 200 200 200 130 0.86 204 1.04 182.80 14.62

a e

file:387595334.xls-dermaga _____________
page 15 of 29
Length (mm) Quantity
Length
Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17

TYPE 16 UNIT 5
Bottom
arah x b a b D13 1180 130 130 1.44 145 1.04 217.56 17.40
arah Y D13 5680 130 130 5.94 30 1.04 185.68 14.85
Top
arah x b a b D13 1180 130 130 1.44 145 1.04 217.56 17.40
arah Y D13 5680 130 130 5.94 30 1.04 185.68 14.85
c
Shear Conector
b d D13 130 200 200 200 130 0.86 315 1.04 282.26 22.58

a e

TYPE 17 UNIT 20
Bottom
arah x b a b D13 1340 130 130 1.60 580 1.04 966.93 77.33
arah Y D13 5680 130 130 5.94 140 1.04 866.48 69.30
Top
arah x b a b D13 1340 130 130 1.60 580 1.04 966.93 77.33
arah Y D13 5680 130 130 5.94 140 1.04 866.48 69.30
c
Shear Conector
b d D13 130 200 200 200 130 0.86 3400 1.04 3,046.66 243.67

a e

TYPE 18 UNIT 5
Bottom
arah x b a b D13 840 130 130 1.10 145 1.04 166.19 13.29
arah Y D13 5680 130 130 5.94 25 1.04 154.73 12.38
Top
arah x b a b D13 840 130 130 1.10 145 1.04 166.19 13.29
arah Y D13 5680 130 130 5.94 25 1.04 154.73 12.38

c
Shear Conector
b d D13 130 200 200 200 130 0.86 280 1.04 250.90 20.07

a e

``

``
` ``
`
Banyuwangi, 17 Februari 2011
PT. Swadaya Graha

Chusnur Rofiq
Enginering

file:387595334.xls-dermaga _____________
page 16 of 29
Project : Pembangunan Packing Plant Bywg Date print Saturday, 19 May 2018
Subcont. No. :
BAR BENDING SCHEDULE Revision 0
Title of Work : Mooring, Breasting & Cat Walk MOORING, BREASTING & CAT WALK Prepared by CHN SWG-CR
Subcontractor : PT. SWADAYA GRAHA Checked by SWG-au
Rev : Approval by ST V- M
Length (mm) Quantity
Length
No. Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
### 2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17

I MOORING DOLPHIN Total Weight


APHT 600.00
MOORING DIA 600 MM UNIT 24 12.00
Tulangan utama a D19 1650 990 2.64 288.00 2.23 1,692.24 72.00 1.44 63 dipakai utk peil cap P7
Tulangan Pengantung D16 1650 990 8.000 2.64 192.0 1.58 800.03 48.00 1.44 48

Tulangan stirup d10 1727 13.667 23.602 24.00 0.62 349.24 48.0
a 300

BMOORING DOLPHIN
4 unit
Precast 4 a
bottom 1.00
Arah X b d 100 - 100 130 0.33 16.0 #N/A #N/A
Arah Y c e 100 - 100 130 0.33 44 #N/A #N/A

Wall e a 2.00
Vertical 100 - 100 130 0.33 96.0 #N/A #N/A
Horisontal 100 - 100 130 0.33 32.00 #N/A #N/A

d b 100 - 100 130 0.33 32.0 #N/A #N/A


100 - 100 130 0.33 32.00 #N/A #N/A

insitu
Vertical e a 1.00
Horisontal 350 - 350 130 0.83 8.0 #N/A #N/A
350 - 350 130 0.83 40.00 #N/A #N/A

d b

file:387595334.xls-mooring, breasting cat walk _____________


page 17 of 29
Length (mm) Quantity
Length
No. Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
### 2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17

IIBREASTING DOLPHIN Total Weight


APHT 600.00
MOORING DIA 600MM UNIT 24 12.00
Tulangan utama a D19 1650 990 2.64 288.00 2.23 1,692.24 72.00 1.44 72 dipakai utk peil cap P7
Tulangan Pengantung D16 1650 990 8.000 2.64 192.0 1.58 800.03 48.00 1.44 48

300
Tulangan stirup d10 1727 13.667 23.602 24.00 0.62 349.24 48.0
a

BMOORING DOLPHIN
2 unit
Precast 4 a
bottom 1.00
Arah X b d 100 - 100 130 0.33 16.0 #N/A #N/A
Arah Y c e 100 - 100 130 0.33 44 #N/A #N/A

Wall e a 2.00
Vertical 100 - 100 130 0.33 96.0 #N/A #N/A
Horisontal 100 - 100 130 0.33 32.00 #N/A #N/A

d b 100 - 100 130 0.33 32.0 #N/A #N/A


100 - 100 130 0.33 32.00 #N/A #N/A

insitu
Vertical e a 1.00
Horisontal 350 - 350 130 0.83 8.0 #N/A #N/A
350 - 350 130 0.83 40.00 #N/A #N/A

d b

IIIPEIL CAP CAT WALK Total Weight


APHT 300.00
P7 DIA 300 MM UNIT 52 12.00
Tulangan utama a D19 1650 990 2.64 624.00 2.23 3,666.53 156.00 1.44 156 dipakai utk peil cap P7
Tulangan Pengantung D16 1650 990 8.000 2.64 416.0 1.58 1,733.39 104.00 1.44 104
300
Tulangan stirup d10 785 13.667 10.728 52.00 0.62 343.95 47.0
a

file:387595334.xls-mooring, breasting cat walk _____________


page 18 of 29
Length (mm) Quantity
Length
No. Description Shape Type f Qty-unit Kg/m Lonjr Sisa potongan Remark
a b c d e f splice Total (m) Kg
12 m' m' Qty
### 2 3 4 5 6 7 8 9 10 11 12=5 of 11 13 14 15=12x13x14 16 17

BPILE CAP 104.00


P7 26 unit
Precast 26 a
bottom 1.00
Arah X b d D13 1,650 100 1,650 100 130 3.63 104.0 1.04 393.36 34.00 1.11 34 102.00
Arah Y c e D13 500 100 500 100 130 1.33 286 1.04 396.34

Wall e a 2.00
Vertical D13 500 100 500 100 130 1.33 624.0 1.04 864.73
Horisontal D13 1,650 100 1,650 100 130 3.63 208.00 1.04 786.71 70.00 1.11 70 210.00

d b D13 500 100 500 100 130 1.33 208.0 1.04 288.24
D13 500 100 500 100 130 1.33 208.00 1.04 288.24

insitu
Vertical e a 1.00
Horisontal D19 1,350 350 1,350 350 130 3.53 52.0 2.23 408.55 17.00 1.41 17 51.00
1.00 8.47 1 dipakai utk horisontal
D19 200 350 200 350 130 1.23 260.00 2.23 711.78
dari sisa potongan
d b 1.41 17.00 17.00 0.18 17.00
8.47 1.00 6.00 1.09 1.00
1.44 156.00 156.00 0.21 156.00
c 1.44 72.00 72.00 0.21 72.00
1.44 9.00 9.00 0.21 9.00
260.00
``

`
``
Banyuwangi, 17 Februari 2011
PT. Swadaya Graha

Chusnur Rofiq
Enginering

file:387595334.xls-mooring, breasting cat walk _____________


page 19 of 29
TOTAL PERHITUNGAN BESI (PREDIKSI PER TGL 15 NOP' 05)

D22 #REF! KG #REF! LONJOR


D19 #REF! KG #REF! LONJOR
D16 #REF! KG #REF! LONJOR
D13 #REF! KG #REF! LONJOR
D10 #REF! KG #REF! LONJOR

TOTAL #REF! KG
3000 3000

arah X D 32 -200 arah X D 19 -150

8400 8400

arah Y D 32 -200 arah Y D 19 -150

Tulangan Bawah Tulangan Atas


Piel Cap 10 Kiln Piel Cap 10 Kiln
7435
1800 1800

900

arah X D 32 - 200

6700

arah Y D 32 -120

900

Tulangan Bawah
Piel Cap 30 Kiln

7435
1800 1800

900

arah Y D 32 -120

6700
arah X D 32 - 200

900

Tulangan Atas
Piel Cap 30 Kiln
2151 2151
4097

2151

arah x D 32 -200

4097

arah Y D 32 - 200

2151

Tulangan Bawah
Piel Cap 21 Kiln

2151

arah X D 19 -150

4097
arah Y D 19 - 150

2151

Tulangan Atas
Piel Cap 21 Kiln

2151 2151
6732

2151

arah X D 32 -200

5897

arah Y D 32 - 450
arah Y D 32 - 120

2151

Tulangan Bawah
Piel Cap 36 Kiln

2151

arah X D 19 -150

4097
arah Y D 19 - 150

2151
Tulangan Atas
Piel Cap 36 Kiln
MIN. DEVELOPMENT LENGTH MIN. LAP LENGTH CLASS B (SEE NOTE
(RE-BAR STRENGTH 414 Mpa) (RE-BAR STRENGTH 414 Mpa)
WITH STANDARD HOOK WITHOUT STANDARD HOOK IN TENSION
BAR SIZE S-1
HORIZONTAL BARS
Ldh S1 POSITION IN FRESHLY VERTICAL S-2
PLACED CONCRETE (SEE OTHERS BARS
SUB NOTE-1)
CONCRETE STRENGTH 28 Mpa

D10 150 300 490 380 640


D13 165 360 640 490 830
D16 205 445 790 610 1020
D19 245 530 930 720 1210
D22 285 615 1350 1040 1750
D25 325 700 1530 1180 1990
D29 375 810 1770 1370 2310
D32 415 895 1960 1510 2540
CONCRETE STRENGTH 21 Mpa

D10 150 300 570 440 740


D13 195 390 740 570 960
D16 240 480 910 700 1180
D19 285 570 1080 830 1400
D22 330 660 1550 1200 2020
D25 375 750 1770 1360 2290
D29 435 870 2050 1580 2660
D32 480 960 2260 1740 2940

SUB NOTE -1 THE DEVELOPMENT OR SPLICE LENGTH IS APPLIED IN CASE THAT FRESH CONCRETE WITH THICKNESS
300MM OR MORE IS CAST BELOW THE BARS
-2 CLASS A SPLICES SPECIFIED IN ACI-3*8 SHALL NOT BE APPLIED
-3 THE CLEAR SPACING SHALL NOT LESS THAN 2db
AP LENGTH CLASS B (SEE NOTE-2)
RE-BAR STRENGTH 414 Mpa)
IN COMPRESSION

S-3

300
380
470
560
640
730
840
930

300
380
470
560
640
730
840
930

CONCRETE WITH THICKNESS


Compatibility Report for BBS Trestel.xls
Run on 1/31/2011 16:21

The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when you save this workbook in
an earlier file format.

Minor loss of fidelity # of occurrences

Some cells or styles in this workbook contain formatting that is not supported 3
by the selected file format. These formats will be converted to the closest
format available.

You might also like