DIMENSI

TYPE PILE
QTY Panjang Lebar Tinggi
CAP
m m m

P6B 1 7.60 4.60 1.8


P2D 1 4.40 4.00 1.6
PROYEK :
LOKASI :
PEKERJAAN :
REF GAMBAR :

DIMENSI VOLUME PEKERJAAN


Dimensi Luas Keliling Luas 20cm Kel 20cm Luas 40cm Kel 40cm Vol Total Vol Bekisting Urugan Anti Rayap
Type Pile Cap Jumlah Volume Beton Rasio Lantai Kerja Pasir Urug Galian Pile Cap Buang Tanah
P (m) L (m) T (m) m2 m' m2 m' m2 m' Besi Samping Kembali Samping Bawah
(x) (y) m3 (Kg) (kg/m3) m2 m3 m3 m3 m3 m3 m3 m3

P6B 7.60 4.60 1.80 34.96 24.40 37.44 25.20 40.00 26.00 1 62.93 4,953.48 78.7 43.92 1.87 2.62 81.87 14.45 67.42 48.65 37.44
P6B 7.60 4.60 1.80 1
P6B 7.60 4.60 1.80 1
P6B 7.60 4.60 1.80 1
P6B 7.60 4.60 1.80 1
P6B 7.60 4.60 1.80 1
P6B 7.60 4.60 1.80 1

0 - - - - - - - - -
P2D 4.40 4.00 1.60 17.59 16.80 19.31 17.60 21.11 18.40 1 28.15 2,153.04 76.5 26.87 0.97 1.35 39.54 9.08 30.46 30.47 19.31
P2D 4.40 4.00 1.60 1
P2D 4.40 4.00 1.60 1
P2D 4.40 4.00 1.60 1
P2D 4.40 4.00 1.60 1
P2D 4.40 4.00 1.60 1
P2D 4.40 4.00 1.60 1

0 - - - - - - - - -

GRAND TOTAL 62.93 4,953.48 78.72 43.92 1.87 2.62 81.87 14.45 67.42 48.65 37.44
Logo
Nama Perusahaan
Nama Proyek

FORM BAR BENDING SCHEDULE PILE CAP


Lokasi :
Drawing Reff. :

Jumlah Jumlah Material Waste Sebelum Pemakaian Waste Setelah Pemakaian


φ Panjang
JUMLAH JUMLAH Berat/m Ptongan Berat Cut total Remark Jumlah Berat Pemakaian Jumlah Berat total
NO BAR SHAPE potongan Pnjang/btg pembulatan
PILE CAP TULANGAN (Kg) waste per bgt (m) Panjang / Btg Jumlah Pjg Waste Panjang / Btg Jumlaj Pjg
(mm) (m) (m) (btg)
pcs kg (pcs) btg Waste Waste batang
A

1 PILE CAP TYPE P6B

A Tulangan Utama Bawah (x) 1 31 D 25 3.85 14.75 31 1,761.84 12 1 (2.75) 31.0 31 Potongan 1 - 328.48 - 2.75 - 85.25 - 328.48 31.00 - 2.75 - 85.25
2.00 2.00

1.65 1.65

7.45

B Tulangan Utama Atas (x) 1 31 D 16 1.58 11.45 31 560.20 12 1 0.55 31.0 31 Potongan 2 26.91 0.55 17.05 - - 0.55 -

7.45
2.0 2.0

C Tulangan Utama Bawah (y) 1 61 D 25 3.85 11.75 61 2,761.73 12 1 0.25 61.0 61 Potongan 3 58.76 0.25 15.25 - - 0.25 -
2.0 2.0

1.65 1.65

4.45

D Tulangan Utama Bawah (y) 1 61 D 19 2.23 8.45 61 1,147.17 12 2 (4.90) 30.5 31 Potongan 4 - 332.61 - 4.90 - 149.45 - - - 4.90 -

4.45
2.0 2.0

E Tulangan Peminggang 1 10 D 16 1.58 12.00 10 189.39 12 1 - 10.0 10 Potongan 5 - - - - - - -

7.45 1 10 D 16 1.58 1.43 10 22.57 12 11 (3.73) 0.9 1 Potongan 6


2.73 2.73

F Tulangan Penumpu 1 34 D 19 2.23 4.20 34 319.68 12 1 7.80 34.2 35 Potongan 7 593.69 7.80 266.76 - - 7.80 -

0.3
1.65

0.3

1.65
0.3

Dia Berat Gambar Btg Berat Batang


TOTAL 13 = Kg kg
16 = 772.15 Kg 42 795.43 kg
19 = 1,466.85 Kg 66 1,762.65 kg
25 = 4,523.57 Kg 92 4,253.85 kg

SUB TOTAL 6,762.57 Kg 6,811.93 Kg


49.36 1%

Prepared By Cheked By Total waste sebelum diambil 18.27 kg


Total waste setelah diambil - 328.48 kg

persentase waste - 4.82 %

(……………………………………..) (……………………………………..)
STANDAR OVERLAP BESI BETON (Ld)

Mutu Beton
Dia
Fc 30 Fc 35

10 0.33
13 0.43
16 0.53
19 0.63
22 0.91
25 1.03
29 1.16
32 1.32

Ref : Standar Detail