Tunneling Cirata

DIVERSION & SPILLWAY TUNNEL


BAB II. DATA TEKNIS

Panjang tunnel (1) : 732 m


Panjang tunnel (2) : 769 m
Slope : 0.0015 ~ 0.0085
Ø excavation (B Line) : 12.00 m
Ø lining concrete : 10.00 m
Penampang : lingkaran bulat
Vol excavation : 108.660 m3
Vol concrete : 49.270 m3
Vol rock bolt : Ø 25 – 14.500 m
Vol shotcrete : 50.000 m2

Gambar : Spillway / Diversion Tunnel

Bab II Data Teknis 9