The document provides technical specifications for two tunnels at the Cirata diversion and spillway project. Tunnel 1 is 732 meters long and Tunnel 2 is 769 meters long. Both tunnels have a slope between 0.0015-0.0085, an excavation diameter of 12 meters, and a concrete lining diameter of 10 meters with a circular cross-section. The estimated excavation volume is 108,660 cubic meters, concrete volume is 49,270 cubic meters, rock bolt volume uses 14,500 meters of 25mm bolts, and shotcrete volume is 50,000 square meters.
The document provides technical specifications for two tunnels at the Cirata diversion and spillway project. Tunnel 1 is 732 meters long and Tunnel 2 is 769 meters long. Both tunnels have a slope between 0.0015-0.0085, an excavation diameter of 12 meters, and a concrete lining diameter of 10 meters with a circular cross-section. The estimated excavation volume is 108,660 cubic meters, concrete volume is 49,270 cubic meters, rock bolt volume uses 14,500 meters of 25mm bolts, and shotcrete volume is 50,000 square meters.
The document provides technical specifications for two tunnels at the Cirata diversion and spillway project. Tunnel 1 is 732 meters long and Tunnel 2 is 769 meters long. Both tunnels have a slope between 0.0015-0.0085, an excavation diameter of 12 meters, and a concrete lining diameter of 10 meters with a circular cross-section. The estimated excavation volume is 108,660 cubic meters, concrete volume is 49,270 cubic meters, rock bolt volume uses 14,500 meters of 25mm bolts, and shotcrete volume is 50,000 square meters.