GOVERNMENT OF ANDHRA PRADESH

PANCHAYATI RAJ ENGINEERING DEPARTMENT


OFFICE OF THE ENGINEER.IN.CH!EF, PR, AP. VIJAYAWADA

Circular Memo No. AEE /DEE/APRRP/ Cold Mix Datas/ 2018.


Dt.18.06.2018
Sub: APRRP-EAP/AllB-Datas for Black Topping using Cold Mix Technology -
Communicated - Regarding.
Ref: 1. Office Memo Dated 24.07 .2018, of Ministry of Rural Development ,

Department of Rural Development , Rural Connectivity (RC) Division,


New Delhi
2) T.O Memo No.APRRP/ EAP/DEE-2|AEE|2017111 Dt:
18.06.2018
' 2. Cold Mix datas furnished by one supplier cum service provider and
approved on pilot Om::o:certain PMGSY and other works.

The Ministry of Rural Development , vide reference 1't cited has recommended the
APRRP Project Proposal for funding under AllB subject to condition, that the state would
follow the PMGSY Parameters of Design , Quality assurance , use of Green Technology
and Space technology as well as simplified asset management regimes.
Accordingly , vide reference 2nd cited, all the Superintending Engineers were
informed to provide Cold Mix for some road works in both the Packages , where DPR
Scrutiny is in progress in Batch-l and in all the packages in Batch-ll where ever feasible
under APRRP(AIlB) as per MoRD Specifications.

The Cold mix datas are herewith communicated to all the Superintending Engineers,
PR in the State for using in the DPRs of proposed Cold mix roads. Further, the
Superintending Engineers, PR are requested to bring to the notice of the undersigned, if any
variations found in the datas, based on the actual observations during execution.

Encl: 1) Cold Mix Datas

sD/------.
Engineer-in-Chief (PR)
AP-VIJAYAWADA
To
All the Superintending Engineer, PR in the State
Copy to.
1) The Technical Consultants for necessary action
2) The DPR Scrutiny Teams for necessary action.
//Authenticatedll
'! o
Execulrve tngrneer
/p-
- t{dtr!
,irt'1(*.nlr!Ar,v &ffiffieffi
;ii:--dffi;;;*u*noW fffin #ryi=:?ffifumffirere
.1rr r '.,ihr ht"ll il! (,*pri.; F'jriol ,l*r*FlflIt{3 llrrer:*. ftnlet/. 1,- tn"rrrt*r
Tho t' ,e'.u, lA,r,,
it$I.

To, Date: 05.05.2A1.8


The Chief Engineer
O/o Engineer in Chief
Panchayati Raj Engineering Department
Vijayawada,
Andhra Pradesh.

Dear Sir,

As discussed I am herewith sending the CRRI Bitchem product price list w.e.f L.t
May-18.

BAT L PRICE tlST W.E.f 1't May-2018


Sales Price Andhra Pradesh (lnclusive of GST @ 1B%)

Product
RS-1 (Tack Coat) SS-l (Prime coat) Bitchem Binder
HDPE (New)
41241.00 42998.00 47902.00
Drums
Sales Price Andhra Pradesh (Exclusive of GST @ Bn
Product
RS-I (Tack Coat) SS-1 (Prime coat) Bitchem Binder
HDPE (New)
34950.00 36438.98 40594.91
Drums

Please Note
l.Please note that the price list changes on every 1st and 15th of the Month subject to changes
in bitumen prices of lndian Oil in the Ratio 55%.
2.We also review other raw material price changes once on every quarter in our price list.
3.The prices are Ex-Bitchem -Visakhapatnam depot.

For Bitchem Asphalt Technologies Limited

A. Suresh Kumar
(Territory Head-South)
Cell No 9948440 480 / 99 66613162
:

Afi
,sir$iii*&N.r
,\H"t I"t ?l
*ite lr*re &*ph*lt ?*rhnrlcgi*s l-inrited
3r* i:l*r:r, &ilif i:}lexi:. i::; il**iJ. ili;rv;:traii ?$i$S$,
'iri +!,}'i 3f-r1 ;4Sq*;3J ?+, l.xx +*J -**1 J4hr+*3*
'!.Tgryt:.l'al1
ta{erpriss
ANNEXURE
Cola Ulx gt Oatr
'S
S. thOex Description of item Unit ' Qty f Rate ] Amount
No Code t;,
1 Prime Coat (usinq eold mix Bitumen emulsion)
Low porosity r[
Providing and applying primer coat with Tailor made (]old mix bitumen emulsion (CSS-1) on prepira
E
surface of granular base including cleaning of road sirrface and spraying primer at the rate of 0.70-1.1
kg/sqm using meehanica! means as per Technical Spr ecification Clause 502 MORD (for use on Wet mi:
]macadam or WBM), including contractors profit & Ove r head charges, but excluding GST etc., completr
'for Prime Coat
r-
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day
I
Mazdoor (Unskilled) day 1.040
Add Municipal/ {gency Allowance

, Hydraulic broom @ 1250 sqm per hour hour 1.400


Air compressor 210 Cim _ hour 1.400
Bitumen emulsion pressure distributor @ 1750 hour 1.000 i

sqm/hour
Water tanker 6 kl capacity 1 trip per hour hour 0.500 I
I

lc) Material
Coid mix Bitumen emulsion (CSS-1) @ 0.S5 kg per t 1.480
sqm
lvatea I
kr 3.000
I

j
{qVeI
r'geqx q Contractor's prolit ]_
of
[lost 1750 sqm = a+b+c+d+e
]!"t"._pqSq, (a+ b+c+d+e)/l 750
TACK GOAT (usinq = Cpld mix Bitumen emulsion) I

Providing and applying tack coat with Tailor made Corldmix Bitumen emulsion (RS-1) using emulsion
per sqm on ther prepared granular surfaces treatr ad with primer &
]distributor at the rate of 0.25 to 0.30 kg
icleaned with Hydraulic broom as per Technical Speci'fication Clause 503 MORD, inclu ding contractors
jprofit & Over head charges, but excluding GST etc., connplete for Tack Coat
I

1Yl,il,#il,,=
,,,,,.* l

a) Labour
-
iMate :
I

tlAdd M unicipal/ Agency3llowance

Hydraulic broom @ 1250 sqm per hour 1.400


Air compressor 210 cfm hour 1.400
Emulsion pressure distributor @1750 sqm per hour ]
hour 1.000

c) Material
Cold mix eitun'e pt
sqm
Cost of 1750 sqm,.= (a+b+c+d+e)
Rate per sqm = a+b+c+d+e/1750
Over heads & Contractoas profit
Rate per_Sqm

113
Description of item

Providing and laying Open GraOeO eremk Carpet lOGeCl surf of


13.20 mm to 5.60 mm size machine crushed hard blasted granite chips (Table 500.10 of MORD) using
Tailor made Gold Mix Binder @21.50 kg per 10 sqm area of road surface over tack coat to required line,
level, grade to serve as wearing course on previously prepared base including mixing in a Mixer of 6 to 10
T capacity, trasporting the mixer to point of use and rolloing with three wheeled 8-10 Tonnes capacity
power roller and finishing to required level and grades including cost, conveyance, leads and lifts of all
materials from approved sources, labour charges and hire and operational charges of power road roller
and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags
other incidental and operational charges etc., complete for finished item of work as per technical
specifications clause 506.2 of MORD. including contractors profit & Over head charges, but excluding
GST and seigniorage etc., complete.

rnanual nreans as 508 of MORD


Cold Mix Binder
Unit = sqm
]Taking output = 900 sqm (24.3 cum)
Labour
]

Mazdoor Unskilled)
Mazdoor

Mixall6/10 T capacity
Three wheel 80-'100 kN static roller

Cold Mix Binder @21.50


Crushed stone chipping,13.2 mm to 5.6 mm @0.27
cum per 10 sqm
Basic rate for 900 Sqm

Over heads & Contractor's profit

Providing and laying bituminous premixed seal coat (Type C) comprising of stone chipping of grading as
defined with Crushed stone chips of 6.7 mm size 100% passing through 9.5mm seive and retained on
2.36 mm sieve applied @ 0.09 cum per 10 sqm, chips to be premixed by manual means with the
bitumunous binder using 10 kgs of Tailor made Cold Mix Binder for 10 sqm and rolling with power
including of required line, level, grade to serve as wearing course on previously prepared surface and
finishing to required level and grades including cost and conveyance of all materials from approved
sources and stacking at site to departmental gauge for premeasurements, labour charges and hire and
operational charges of power road roller 8 to 10 tonnes capacity and allother machinery, tools and plants,
providing barricading for diversion of traffic, erecting red flags other incidental and operational
etc., complete for finished item of work as per technical specification clause 508 of MORD including
contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for seal coat.

Unit = sqm
Taking out put = 1250
Labour
Mate

2/j
Mazdoor (semi-skilled)
Add Municipal/ Aqency Allowance

Three wheereO-100 mrctatic roller

Gold IUlix Binder @ 10.000 kg per 10


Crushed stone chipping of 6.7 mm size 100% passing
9.50mm seive and retained on 2.36 mm sieve applied
@ 0.0e cgm_p9l l9_sqm *
Over heads & Contractor's profit
Basic rate of Seal coat T' for 1250

..n,,#ffier,PR
AP =Vijayawada

&=retutr)fr

3/3