Test Specification: ASTM C-39 Casting Date: 02/03/18

COMPRESSION TEST REPORT


Description = 28-days Concrete Cylinders. (28-days Strength 3000 psi required)

Structure = Footing F5, F8 (3-no)

28-days Concrete Cylinders.


Area of X-
Ultimate Load Ultimate Stress
Sr. No. Mark Testing Date Section
(Kgf) (Psi)
(Sq.in)
1 3000 psi 30/03/18 29061 28.28 2265(75%)
2 3000 psi 30/03/18 22433 28.28 1749(62%)
Average Strength = 2007 (67%)

Remarks:

28-Days Concrete Cylinders Tested in Nagina Site Laboratory not found satisfactory. 7-days and
14-days strength found satisfactory. May be it’s an error while casting the concrete cylinders or
may be Through Which TM (Transit Mixer) Sample had been taken contain huge amount of
water which increased the slump and lower the compressive strength.