TEST RESULTS
Table: Cement

Sl.No Source Standard Initial Final Soundness Fineness Compressive


consistency setting setting Mm (%) strength (MPa)
(%), time time limit = 10 limit = 3 7 28
limit = (min) (min) mm 10% days days days
25% to Minimum Maximum
35% 30 min. 600 min.
1 Max 30 90 340 4.26 8.6 22.7 33.6 47.2

2 Star 28 95 354 4.02 8.8 20.2 31.4 44.3

Table: M25 concrete cube at 28 days


Average Strength
Cube 28 days Comp. strength
Compressive load ( KN) (N/mm2)
Designation (N/mm2)
Minimum = 25 N/mm2
Sample 1 (Star) 786 34.93
Sample 2 (Star) 729 32.40 33.40
Sample 3 (Star) 740 32.88

Average Strength
Cube 28 days Comp. strength
Compressive load ( KN) (N/mm2)
Designation (N/mm2)
Minimum = 25 N/mm2
Sample 1 (Max) 786 34.9
Sample 2 (Max) 729 32.4 33.6
Sample 3 (Max) 752 33.4

Remark: The test results are as per the Materials brought to the Laboratory of Civil Engineering Dept.