Architectural Drawing Bid Set 02212018 Interpretive Center Plans
Architectural Drawing Bid Set 02212018 Interpretive Center Plans
Interpretive
Center
Renovations
Liberty State Park
Jersey City, NJ
for the
State of New Jersey
DPMC Project # P1111-00
P 1111-00 / 21501
Bidding
DGR
JEE
CS-1
OF TWO
946 S. Main Street
Williamstown, NJ 08094
Phone: (856)-875-2792
Fax: (856)-728-1483
MB TH
MB TH
PT PT
CARP.T
PT
CARP.T
AL TH
PT
CARP.T PT
AL TH
CARP.T PT
CARP.T FLOOR FINISH TILE
PATTERN - TYPICAL
S.S. TILE TRANSITION -
TYPICAL AT ALL OPEN
EDGES
FACE OF WALL ABOVE
CLOSETS
AL TH
TYPICAL AT ALL OPEN
EDGES
AL TH
CARP.T PT
RECESSED ENTRANCE
MAT AND FRAME
PT CARP.T
CARP.T PT
S.S. TILE TRANSITION -
TYPICAL AT ALL OPEN
EDGES
AL TH
AL TH AL TH
Bidding
DGR
A-0
946 S. Main Street
Williamstown, NJ 08094
Phone: (856)-875-2792
Fax: (856)-728-1483
REMOVE PORTION OF EXISTING
WALL, TO ALLOW INSTALLATION James E. Ebersberger, AIA
OF NEW DOOR & FRAME INTO NJ ARCH AI1154
STORAGE 101 A REMOVE PORTION OF EXISTING
WALL, TO ALLOW Daniel G. Rodier, AIA
INSTALLATION OF NEW DOOR &
NJ ARCH AI08961
FRAME INTO STORAGE 102 A
ALL EXISTING
INTERIOR AND
REMOVE EXISTING EXTERIOR DOORS
REMOVE EXISTING GYP BD & STUD
REMOVE EXISTING ACOUSTIC PANEL & STUCCO SYSTEM AND FRAMES TO BE
FRAMING AROUND THESE COLUMNS
GYP BD FINISH AT THE LIGHT COVE THROUGH-OUT ENTRY / REMOVED
FROM FINISH FLOOR UP TO THE REMOVE EXISTING
STRUCTURES. REPLACE LIGHT LOBBY AREA DOWN TO
OPENING HEADER CONSTRUCTION. DECORATIVE WOOD COLUMN
FIXTURES & GYP BD IN PREP FOR NEW EXISTING SHEATHING/
CUT-OFF ANY EXPOSED BOLT ENDS (TYPICAL OF FOUR)
ACOUSTIC PANELS SHOWN ON FRAMING
AND COVER BOLT HEADS AND NUTS
DRAWINGS. TYPICAL OF 16 IN EXISTING
WITH PROTECTIVE RUBBBER COVERS.
AUDITORIUM AND EXHIBIT HALL
REMOVE EXISTING
DECORATIVE WOOD COLUMN
REMOVE EXISTING GYP BD & STUD (TYPICAL OF FOUR)
FRAMING AROUND THESE COLUMNS
FROM FINISH FLOOR UP TO THE
OPENING HEADER CONSTRUCTION.
CUT-OFF ANY EXPOSED BOLT ENDS REMOVE EXISTING
AND COVER BOLT HEADS AND NUTS STUCCO SYSTEM
WITH PROTECTIVE RUBBBER COVERS. THROUGH-OUT ENTRY / ALL EXISTING INTERIOR
LOBBY AREA DOWN TO AND EXTERIOR DOORS
EXISTING SHEATHING/ AND FRAMES TO BE
FRAMING REMOVED
Bidding
GENERAL DEMOLITION NOTES REMOVE PORTION OF REMOVE EXISTING DOORS, FRAMES, REMOVE PORTION OF
EXTERIOR WALL TO ALLOW TILE FLOOR AND WALL FINISHES, EXTERIOR WALL TO ALLOW
1. REMOVE ALL DAMAGED GYPSUM BOARD FROM CEILINGS AND WALLS THROUGHOUT PROJECT.
INSTALLATION OF NEW ALL PLUMBING FIXTURES, INSTALLATION OF NEW
INCLUDE IN THE BASE BID A MINIMUM OF 3,000 SQUARE FEET OF GYP BD REMOVAL THROUGHOUT EXTERIOR ENTRANCE TO LIGHTING FIXTURES, GRILLES, EXTERIOR ENTRANCE TO
PROJECT (DOES NOT INCLUDE THE REMOVAL SPECIFIED UP TO 3'-0" AFF). A UNIT PRICE WILL BE REST ROOM REGISTERS AND GYPSUM BOARD IN REST ROOM
USED TO ADD OR SUBTRACT FROM THIS AMOUNT. ROOMS 109A, 110, 112, 113 AND
114C
2. REMOVE ALL REMAINING GYP BD AND INSULATION FROM FLOOR TO 3'-0" AFF (PART OF BASE
BID BUT NOT TO BE INCLUDED IN THE 3,000 SQUARE FOOT REPLACEMENT NOTED ABOVE).
3. REMOVE ALL INTERIOR AND EXTERIOR DOORS AND FRAMES THROUGHOUT PROJECT. 18. REMOVE EXISTING ACOUSTIC PANEL & GYP BD FINISH AT THE LIGHT COVE
4. REMOVE PORTIONS OF EXTERIOR WALL WITH WOOD SIDING FOR NEW RESTROOM ENTRANCES AS STRUCTURES. REPLACE LIGHT FIXTURES & GYP BD IN PREP FOR NEW ACOUSTIC
SHOWN ON DRAWINGS. PANELS SHOWN ON DRAWINGS. TYPICAL OF 16 IN EXISTING AUDITORIUM AND EXHIBIT HALL
5. REMOVE PORTIONS OF INTERIOR FRAME WALLS AS SHOWN ON DRAWINGS.
6. REMOVE CMU PIERS, PLYWOOD BOX BEAMS, WOOD FRAMING, WOOD DECKING AND METAL SHED 19. REMOVE EXISTING GYP BD & STUD FRAMING AROUND SIX COLUMNS IN AUDITORIUM FROM DGR
ROOF AT ENTRY COURTYARD. REMOVE SCREEN AT TRUSS MEMBERS. FINISH FLOOR UP TO THE OPENING HEADER CONSTRUCTION. ADD REQUIRED WOOD STUD
1
7. REMOVE EXISTING PROJECTION BOOTH CONSTRUCTION UP TO 8'-1 2 " AFF TO UNDERSIDE OF DUCT FRAMING AND GYP BD TO CLOSE OFF THE WALLS / CEILINGS. CUT-OFF ANY EXPOSED BOLT
ENCLOSURE. WALLS ABOVE TO REMAIN. REMOVE EXISTING 5'-1" SQUARE FIXED INTERIOR WINDOW ENDS AND COVER BOLT HEADS AND NUTS WITH PROTECTIVE RUBBBER COVERS. PREP AND
AT TOP OF NORTH WALL. PROVIDE SPECIFIED FINISH OF ALL EXPOSED WOOD COLUMNS, TRUSSES AND TIMBER MEMBERS.
8. REMOVE EXISTING WALLS, DOORS, FRAMES AND PILASTERS AT ROOMS 101 A AND 102 A FOR
INSTALLATION OF NEW AQUARIUMS AS SHOWN ON DRAWINGS. 20. REMOVE EXISTING STUCCO FINISH, INCLUDING LATH AND INSULATION BOARD, AROUND
9. REMOVE CONCRETE BASE AT FORMER BIRDHOUSE ON EXTERIOR OF NORTH WALL OF AUDITORIUM. 1
ENTIRE ENTRY / LOBBY. INSTALL NEW 2 " CEMENT BOARD AND FRP PANEL FROM FINISH FLOOR
10. REMOVE ALL LIGHT FIXTURES AS SHOWN ON ELECTRICAL DRAWINGS. 1
11. REMOVE ALL PLUMBING FIXTURES AS SHOWN ON PLUMBING DRAWINGS. UP TO 3'-0" AFF. INSTALL NEW 2" GYP BOARD REMAINDER OF ALL WALLS. INSTALL DRYWALL REGLET
12. REMOVE ALL FINISHES IN EXISTING RESTROOMS. PATCH ADJACENT FINISHES. IN ENTRY / LOBBY ON ALL WALLS IN THE PATTERN AS SHOWN ON DRAWINGS.
A-1
13. TRENCH EXISTING CONCRETE FLOOR FOR NEW ELECTRIC AND PLUMBING LINES. SEE MEP
DRAWINGS FOR SCOPE. 21. PROVIDE TEMPORARY WATERPROOF BARRIERS AND ENCLOSURES TO SECURE BUILDING DURING
14. REMOVE AND REPLACE ALL EXISTING CAULKING AT WINDOWS, GLASS BLOCK AND FIXED GLASS. THE COURSE OF CONSTRUCTION. PROVIDE ALL REQUIRED TEMPORARY BRACING AND SAFETY
REMOVE EXISTING VERTICAL BLINDS AT AUDITORIUM WINDOW. PRECAUTIONS TO MEET OSHA STANDARDS.
15. REMOVE ANY DAMAGED EXISTING STUCCO AND/OR WOOD SIDING ON EXTERIOR OF BUILDING
AND REPLACE/PATCH AS REQUIRED TO MATCH EXISTING CONSTRUCTION. INCLUDE IN THE
BASE BID A MIN. OF 800 LINEAR FEET OF SIDING REMOVAL AND REPLACEMENT. A UNIT PRICE
WILL BE USED TO ADD OR SUBTRACT FROM THIS AMOUNT.
16. REMOVE ANY DAMAGED INTERIOR WOOD TRIM AND REPLACE / PATCH AS REQUIRED.
17. REMOVE PLYWOOD INSERTS FROM EXTERIOR SIDE OF GLASS BLOCK WINDOWS.
6'-8"
946
946S.S.Main Street
Main Street
Williamstown, NJ 08094
Williamstown, NJ 08094
9" Phone: (856)-875-2792
3'-0"
Fax: (856)-728-1483
2'-9"
James E. Ebersberger, AIA
NJ ARCH AI1154
9"
Daniel G. Rodier, AIA
NJ ARCH AI08961
3'-4 1/2"
1'-8"
6'-8"
18"
30"
12.5"
76.5"
INTERPRETIVE
2'-10"
34"
CENTER
RENOVATIONS
4"
P 1111-00 / 21501
Bidding
6'-1"
DGR
A-2
946 S. Main Street
Williamstown, NJ 08094
Phone: (856)-875-2792
Fax: (856)-728-1483
LINE OF NEW WOOD STUD & LINE OF NEW WOOD STUD &
GYP BD HEADER ABOVE GYP BD HEADER ABOVE
OPENING OPENING
12
STUD WALL
NEW CASED
A-10 OPENINGS, TRIM
WITH SYNTHETIC
STUD WALL
TRIM
CLEAR OPNG
11
A-10
LINE OF NEW
LINE OF EXISTING WALL ROOF ABOVE
(DUCT ENCLOSURE) ABOVE
TO REMAIN
NEW CASED
OPENINGS, TRIM
WITH SYNTHETIC
TRIM
STUD WALL
NEW ACCESSIBLE
INFORMATION DESK
STUD WALL
CLEAR OPNG
STUD WALL
STUD WALL
PATCH GYP BD
CLEAR OPNG
for the
State
of
New Jersey
Bidding
RWC RWC
GENERAL CONSTRUCTION NOTES
1. INSTALL NEW CEMENT BOARD SHEATHING ON ALL EXISITNG STUD WALLS UP TO 3'-0" AFF, TYPICAL FOR
INTERIOR OF ALL WALL SURFACES. REMOVE ANY EXISTING GYP BOARD AND INTERMEDIATE TRIM IN February 21, 2018
THESE AREAS. FINISH OF ALL CEMENT BOARD (EXCEPT REST ROOMS) SHALL BE FINISHED FRP / PVC
PANELS WITH TRIM.
2. RENOVATION OF MEN'S AND WOMEN'S RESTROOMS TO INCLUDE INCLUSION OF FORMER STORAGE
ROOMS 109A & 114C. WORK INCLUDES REMOVAL OF ALL TILE & GYP BOARD FROM THE WALLS, 11. REMOVE RUST, LOOSE PAINT, CAULKING, ETC. FROM EXISTING WINDOWS INTERIOR AND NEW CANOPY RWC CONNECTED TO EXISTING
EXTERIOR, AND RE-FINISH AND RE-CAULK. UNDERGROUND STORM WATER PIPING WITH
REMOVAL OF ALL TILE FROM THE FLOORS, REMOVAL OF ALL PLUMBING FIXTURES, INSTALLATION OF NEW UNDERGROUND PIPING. SEE A-13, P-1
NEW CEMENT BOARD SHEATHING AND NEW TILE ON WALLS ( MOISTURE RESISTANT GYP BD ABOVE 12. RE-PAINT ALL EXPOSED LAMINATED WOOD TRUSSES, INTERIOR AND EXTERIOR, AT PITCHED AND P2. TYPICAL OF TWO LOCATIONS
6'-9") AND NEW FLOOR TILE ON FLOORS, INSTALLATION OF NEW PLUMBING FIXTURES (MEP),AND ROOFS AND WINDOWS.
ACCESSORIES. INSTALL SOLID WOOD BLKG AT NEW TOILET PARTITIONS, GRAB BARS AND TOILET 13. REMOVE LOOSE PAINT AND PREP ALL EXISTING WOOD SIDING. PRIME AND PAINT SIDING AS
ACCESSORY LOCATIONS. INSTALL NEW INTERIOR DOOR, FRAME AND THRESHOLD INSTALL NEW SPECIFIED.
EXTERIOR DOORS,FRAMES THRESHOLDS AND EXTERIOR CANOPY AS SHOWN. SEE MEP DRAWINGS FOR 14. PATCH /REPAIR ALL DAMAGED EXTERIOR STUCCO. FILL CRACKS PER MANUFACTURER'S
OTHER WORK. RECOMMENDATIONS.
3. ALL EXISTING HORIZONTAL WOOD TRIM ( 8'-6" AFF) SHALL REMAIN. REMOVE PORTIONS OF TOP TRIM 15. RE-PAINT ENTIRE INTERIOR WALLS, TRIM, CEILINGS.
WHERE EXHIBITS WILL BE MOUNTED TO WALLS. PATCH/REPLACE ANY DAMAGED/MISSING HORIZONTAL 16. INSTALL NEW MOTORIZED BLACK-OUT SHADE AT AUDITORIUM WINDOW ON NORTH WALL.
TOP WOOD TRIM. NEW WALL BASE TRIM AND INTERMEDIATE TRIM SHALL BE SYNTHETIC BOARD IN 17. INSTALL NEW OPAQUE FILM TO INTERIOR SURFACE OF GLASS BLOCK WINDOWS IN AUDITORIUM
PROFILES SHOWN ON DRAWINGS. INSTALL THOUGHOUT PROJECT. INTERMEDIATE TRIM ON ALL WALLS AND NIGHT THEATER AND THE FIXED GLAZING BETWEEN THE TRUSS AT THE NORTH AUDITORIUM DGR
EXCEPT RESTROOMS AND WHERE EXHIBITS WILL BE MOUNTED TO WALLS. BASE TRIM ON ALL WALLS WALL.
EXCEPT REST ROOMS. RUN BASE AT FACE OF EXHIBIT PANELS THAT ARE MOUNTED TO WALLS. 18. PATCH INTERIOR AND EXTERIOR NORTH WALL OF AUDITORIUM WHERE CONCRETE BASE OF
4. REPLACE ANY DAMAGED GYPBOARD ABOVE 3'-0" (WALLS AND CEILINGS, ETC.). FINISH PER THE ROOM FORMER BIRDHOUSE AND GAS PIPING IS BEING OR HAS BEEN REMOVED.
FINISH SCHEDULE AND SPECIFICATIONS. PATCH AROUND ANY NEW OPENINGS AS REQUIRED. A MINIMUM 19. INSTALL NEW RECEPTION DESK AT DOORWAY BETWEEN ENTRY/LOBBY 108 AND OFFICE 114.
REPLACEMENT QUANTITY OF 3000 SQUARE FEET FOR REPLACEMENT ABOVE 3'-0"AFF SHALL BE INSTALL NEW UNIT KITCHEN IN OFFICE 114.
INCLUDED IN THE BASE BID. UNIT PRICES WILL BE SUBMITTED TO ADD OR SUBTRACT FROM THIS 20. INSTALL NEW FIBERGLASS BATT INSULATION IN ALL EXTERIOR WALLS AND CEILINGS (MIN. 6"
MINIMUM AMOUNT. R-21) AND NEW SOUND BATTS IN ALL INTERIOR WALLS WHERE EXISTING SHEATHING AND/OR
5. INSTALL ALL NEW DOORS AND FRAMES THROUGHOUT PROJECT. SEE DOOR SCHEDULE. INSULATION HAS BEEN OR WILL BE REMOVED. THICKNESS SHALL MATCH CAVITY OF
6. CLEAN EXISTING CONCRETE SUB-FLOORS OF ALL GLUE, DIRT, DEBRIS, ETC. PREP EXISTING CONCRETEE CONSTRUCTION. MAINTAIN CONTINUATION OF ALL VAPOR BARRIERS.
SUBFLOORS, INSTALL NEW FLOOR FINISHES AS SHOWN ON ROOM FINISH SCHEDULE. 21. INSTALL NEW RAIL SNOW GUARDS SECURED TO STANDING SEAMS OF EXISTING PITCHED METAL
A-3
7. TRENCH EXISTING CONCRETE SUB-FLOOR FOR PLUMBING AND ELECTRIC AS REQUIRED. PATCH ROOFS.
SUBFLOOR. PATCH CONCRETE IN ENTRY WHERE CMU PIERS HAVE BEEN REMOVED. . INSTALL RECESSED 22. PAINT ENTIRE EXTERIOR STUCCO FINISH.
ENTRY MAT AND FRAME. LEVEL LOBBY FLOOR PRIOR TO INSTALLATION OF FINAL FLOOR FINISH. 23. PACK OUT EXISTING WALL AS REQUIRED TO INSTALL NEW DOOR FRAME AT DOOR 106a.
8. INSTALL NEW EXTERIOR 4" THICK CONCRETE WALK AND PAD TO CONNECT NEW EXTERIOR RESTROOM 24. REMOVE EXISTING WOOD FRAMING AROUND COLUMNS IN AUDITORIUM UP TO HEIGHT
ENTRANCE TO EXISTING WALK. ADJUST SURROUNDING GRADING AS REQUIRED. OF FRAMED OPENING. CLOSE OFF UNDERSIDE OF OPENINGS WITH WOOD FRAMING AND GYP
9. INFILL AREAS WHERE DOORS AND WINDOWS HAVE BEEN REMOVED AS SHOWN ON DRAWINGS. BD AT EACH COLUMN, FINISH COLUMNS WITH STAIN AND INSTALL PROTECTIVE COVERS
CONSTRUCT NEW WALLS FOR NIGHT THEATER AND STORAGE ROOMS 106A, 106B, 104A & 104B. NOTE ON BOLTS/BRACKETS.
WALL THICKNESS. ALL NEW INTERIOR WALLS TO HAVE SOUND INSULATION BATTS BETWEEN STUDS. 25. REMOVE AND REPLACE EXISTING 32' X 33' EXTERIOR 4" CONC. PAD OUTSIDE OF NEW MAIN
FINISH FLUSH TO EXISTING WALLS THAT REMAIN. INFILL 5'-1" SQUARE OPENING AT TOP OF NORTH ENTRANCE. MEET LEVEL OF FINISH FLOOR AT ENTRY DOORS AND SLOPE AWAY FROM THE
WALL OF FORMER PROJECTION BOOTH. BUILDING AS SHOWN. GRADE AND SOD ADJACENT DISTURBED AREAS.
10. INSTALL NEW ALUMINUM STOREFRONT AND GLASS ENTRY INCLUDING NEW ENTRY DOORS TO 26. INSTALL NEW STEEL TUBE BEAMS AT NEW CURTAINWALL ENTRY. SEE DETAILS.
UNDERSIDE OF EXISTING WOOD ROOF TRUSS. INSTALL NEW FIXED WINDOW BETWEEN EXISTING WOOD 27. PRIOR TO ORDERING ANY MATERIALS, FIELD VERIFY ALL DIMENSIONS AND CONDITIONS.
TRUSS MEMBERS TO MATCH EXISTING. SHOP DRAWINGS MUST REFLECT THE ACTUAL FIELD DIMENSIONS AND CONDITIONS PRESENT. 28.
10.a. REMOVE EXISTING STUCCO SYSTEM IN ENTRY/ LOBBY AND INSTALL NEW 1/2 "CEMENT BOARD UP TO 28. FILL-IN WALL OPENINGS WHERE CABINET HEATERS ARE BEING REMOVED AND WHERE ANY
3 FEET AFF AND NEW 1/2"GYP BOARD WITH REGLET REVEAL PATTERN (SEE DRAWING A-7) ABOVE 3 FEET OTHER UTILITY, DUCTWORK, UNIT, ETC IS BEING REMOVED.
ON ALL WALLS IN THIS ROOM. USE 1.5", 18 ga. FURRRING ON MASONRY AND ON EXPOSED STEEL BEAM. 29. PROVIDE A MOBILE WIRELESS ASSISTED LISTENING SYSTEM TO THE OWNER. SEE SPECS.
30. INSTALL NEW ART HANGING SYSTEM IN ALCOVES. SEE BUILDING SECTIONS AND SPECS.
INSTALL NEW RAIL SNOW
GUARDS ON ALL INSTALL OPAQUE FILM
EXISTING METAL ON INSIDE OF GLASS
ROOFS WINDOWS IN-BETWEEN 946 S. Main Street
TRUSS MEMBERS.
RE-PAINT / RE-CAULK
Williamstown, NJ 08094
WINDOWS Phone: (856)-875-2792
INSTALL 72" X 42" ACOUSTIC INSTALL MOTORIZED BLACKOUT Fax: (856)-728-1483
BAFFLES, 2 PANELS HUNG FROM SHADES OVER EXISITNG
THE BOTTOM OF EACH LAM WINDOW ON NORTH WALL OF James E. Ebersberger, AIA
WOOD TRUSS IN AUDITORIM & AUDITORIUM NJ ARCH AI1154
EXHIBIT SPACE D 106 Daniel G. Rodier, AIA
NJ ARCH AI08961
60"(OR 44") LONG X 54" REMOVE EXISTING WOOD FRAMIING AND GYP BD SHEATHING FROM 1" CEMENT BOARD SHEATHING
AROUND EACH LAMINATED WOOD COLUMN IN THE AUDITORIUM UP INSTALL NEW 2 ALL EXTERIOR WALLS WHERE GYP BD HAS BEEN
HIGH, ART DISPLAY SYSTEM
1"AFF. CLEAN COLUMN, STAIN WOOD, PAINT STEEL BASE THROUGHOUT PROJECT UP TO 3'-0" AFF. INSTALL OR WILL BE REMOVED WILL RECEIVE NEW
AT EACH ALCOVE. SEE TO 8'-12
NEW FRP/PVC PANEL FROM FINISH FLOOR TO 3'-0" THERMAL BATT INSULATION FOR THE FULL
DRAWING EX-1 FOR AND INSTALL PROTECTIVE COVER OVER EACH EXPOSED AFF. INSTALL SYNTHETIC TRIM AS DETAILED. THICKNESS OF THE WALLS.
LOCATIONS (15 TOTAL) BOLT/NUT/BASE. INSTALL BASE/INTERMEDIATE TRIM. INSTALL WD
1" TO CLOSE OFF OPENING.
FRAMING AND GYP BD AT 8'-1 2
ALL NEW INTERIOR WALLS AND EXISTING INTERIOR WALLS
WHERE GYP BD HAS BEEN OR WILL BE REMOVED WILL
RECEIVE NEW SOUND BATT INSULATION FOR THE FULL
THICKNESS OF THE WALLS.
INSTALL 2 X 6 WOOD
INSTALL NEW RAIL SNOW STUDS BETWEEN TRUSS
GUARDS ON ALL MEMBERS WITH 2 1" GYP
EXISTING METAL BD FINISH AND SOUND
ROOFS BATTS BETWEEN
A-4
INSTALL NEW RAIL SNOW INSTALL NEW RAIL SNOW
GUARDS ON ALL GUARDS ON ALL
EXISTING METAL RE-CAULK AND
EXISTING METAL
RE-CAULK AND RE-PAINT ROOFS RE-PAINT ALL
RE-CAULK AND RE-PAINT ROOFS
ALL WINDOWS ON THE WINDOWS ON THE
ALL WINDOWS ON THE
PROJECT, REPAINT ALL PROJECT, REPAINT ALL
PROJECT, REPAINT ALL
EXPOSED WOOD EXPOSED WOOD
EXPOSED WOOD
TRUSSES TRUSSES
TRUSSES
ENTIRE EXTERIOR WD DECK & RE-PAINT ENTIRE EXTERIOR WD DECK & RE-PAINT NJ ARCH AI08961
INSTALL NEW INSTALL NEW SYNTHETIC INTERMEDIATE INSTALL NEW DOOR &
SYNTHETIC BASE TRIM IN ALL AREAS EXCEPT FRAME FOR HINGED INSTALL NEW CASED TRIM INSTALL NEW DOOR &
IN ALL AREAS BATHROOMS, STORAGE ROOMS AND PANEL EXHIBIT. NOTE IN EXISTING OPENINGS. FRAME FOR HINGED
EXCEPT BEHIND ANY WALL MOUNTED EXHIBITS SPECIAL FRAME DETAIL SEE DETAILS 11 & 12 ON PANEL EXHIBIT. NOTE
BATHROOMS & HARDWARE DRAWING A-10 SPECIAL FRAME DETAIL
& HARDWARE
INTERPRETIVE
CENTER
TYP @ ALL
RENOVATIONS
REPAIR / REPLACE DAMAGED OR
CLERESTORIES: REPAIR Liberty State Park
REMOVED GYP BD CEILINGS FROM
ANY DAMAGES TO REPAIR ANY Ave
RE-ROOFING PROJECT.
EXTERIOR EXPOSED DAMAGES TO EIFS Jersey City, NJ
SOFFIT, WD TRUSS & SYSTEM. REPAINT
WD DECK & RE-PAINT ENTIRE EXTERIOR REPAIR/REPLACE AND RE-PAINT ALL for the
EIFS FINISH WOOD SIDING ON THE PROJECT
State
of
REPAIR / REPLACE DAMAGED TOP
TRIM. REMOVE ANY TOP TRIM
New Jersey
REPAIR AND RE-PAINT ALL WOOD
FROM WALL BEHIND ANY WALL
TRUSS FRAMING AT WINDOWS
MOUNTED EXHIBITS.
UP TO 3'-0" AFF. INSTALL NEW FRP ALL GYPSUM BOARD WILL BE REMOVED UP TO 3'-0" AFF
AND REPLACED WITH A NEW 2 1" CEMENT BOARD AND FRP/PVC February 21, 2018
PANEL FROM FINISH FLOOR TO 3'-0"
AFF. INSTALL SYNTHETIC TRIM AS PANEL FINISH. IN ADDITION, ANY OTHER GYP BD ABOVE
DETAILED. 3'-0" THAT IS DAMAGED (WET PEALING, DENTED, ETC.) WILL
RE-CAULK AND RE-PAINT
ALL WINDOWS ON THE BE REMOVED AND REPLACED WITH NEW GYP BD. THIS
INCLUDES BOTH WALLS AND CEILINGS. ANY AREAS ABOVE
PROJECT
3'-0" WHERE GYP BD HAS ALREADY BEEN REMOVED WILL BE
REPLACED IN KIND.
ENTIRE EXTERIOR WD DECK & RE-PAINT ENTIRE EXTERIOR WD DECK & RE-PAINT NJ ARCH AI08961
INSTALL NEW INSTALL NEW SYNTHETIC INTERMEDIATE REMOVE FRONT WALL, DOOR AND REMOVE FRONT WALL, DOOR AND
SYNTHETIC BASE TRIM IN ALL AREAS EXCEPT BATHROOMS, FRAME AND PORTION OF SIDE WALLS FRAME AND PORTION OF SIDE WALLS
IN ALL AREAS STORAGE ROOMS AND BEHIND ANY WALL FOR INSTALLATION OF NEW AQUARIUM FOR INSTALLATION OF NEW AQUARIUM
EXCEPT MOUNTED EXHIBITS ENCLOSURE BY EXHIBIT CONTRACTOR ENCLOSURE BY EXHIBIT CONTRACTOR
BATHROOMS
INTERPRETIVE
CENTER
RENOVATIONS
TYP @ ALL CLERESTORIES:
REPAIR ANY DAMAGES TO Liberty State Park
REPAIR ANY DAMAGES TO
EXTERIOR EXPOSED SOFFIT, WD Ave
EIFS SYSTEM. REPAINT
TRUSS & WD DECK & RE-PAINT REPAIR / REPLACE DAMAGED OR Jersey City, NJ
ENTIRE EXTERIOR EIFS INSTALL NEW SLATE SILLS &
REMOVED GYP BD CEILINGS
FINISH RE-CAULK INTERIOR & EXTERIOR for the
FROM RE-ROOFING PROJECT.
REPAIR/REPLACE AND RE-PAINT AT EVERY GLASS BLOCK WINDOW
ALL WOOD SIDING ON THE REPAIR ANY DAMAGES TO EIFS State
PROJECT SYSTEM. REPAINT ENTIRE of
EXTERIOR EIFS FINISH
New Jersey
RE-CAULK AND RE-PAINT ALL REPAIR / REPLACE DAMAGED TOP
WINDOWS ON THE PROJECT TRIM. REMOVE ANY TOP TRIM
FROM WALL BEHIND ANY WALL
MOUNTED EXHIBITS.
P 1111-00 / 21501
REMOVED AT VARIOUS HEIGHTS. THROUGHOUT PROJECT ALL RE-PAINT ALL SHEATHING THROUGHOUT
GYPSUM BOARD WILL BE REMOVED UP TO 3'-0" AFF AND WINDOWS ON THE PROJECT UP TO 3'-0" AFF. February 21, 2018
REPLACED WITH A NEW 2 1" CEMENT BOARD AND FRP/PVC PROJECT & INSTALL INSTALL NEW FRP/PVC PANEL
NEW SLATE SILL FROM FINISH FLOOR TO 3'-0"
PANEL FINISH. IN ADDITION, ANY OTHER GYP BD ABOVE 3'-0"
AFF. INSTALL TRIM AS
THAT IS DAMAGED (WET PEALING, DENTED, ETC.) WILL BE
DETAILED.
REMOVED AND REPLACED WITH NEW GYP BD. THIS INCLUDES
BOTH WALLS AND CEILINGS. ANY AREAS ABOVE 3'-0" WHERE RE-CAULK AND
GYP BD HAS ALREADY BEEN REMOVED WILL BE REPLACED IN RE-PAINT ALL
KIND. WINDOWS ON THE
INSTALL NEW BATT INSULATION IN ANY PORTION OF WALL PROJECT
THAT IS OR WILL BE OPEN TO FRAMING. ALL NEW WALL
DGR
CONSTRUCTION WILL ALSO RECEIVE NEW BATT INSULATION.
THICKNESS OF INSULATION WILL BE THE FULL WIDTH OF THE
WALL CAVITY. USE THERMAL INSULATION BATTS ON INSTALL NEW SYNTHETIC INSTALL NEW SYNTHETIC BASE IN
EXTERIOR WALLS AND SOUND BATTS IN ALL INTERIOR WALLS. REMOVE ALL EXISTING GYP BD AND TILE IN THE RESTROOMS. INTERMEDIATE TRIM IN ALL AREAS ALL AREAS EXCEPT BATHROOMS.
EXTERIOR WALLS WILL ALSO RECEIVE A VAPOR BARRIER INSTALL NEW CEMENT BOARD SHEATHING INSIDE ALL EXCEPT BATHROOMS, STORAGE BASE TO BE INSTALLED AT
PRIOR TO RE-SHEATHING. RESTROOMS WALLS WITH A TILE FINISH AS SHOWN. ABOVE ROOMS AND BEHIND ANY WALL FACE/SIDES OF SOME WALL
TILE INSTALL NEW MOISTURE RESISTANT GYP BD AND MOUNTED EXHIBITS MOUNTED EXHIBITS.
PAINTED FINISH. FLOORS TO RECEIVE NEW TILE FINISH.
A-6
COORDINATE WITH EXHIBIT
SUBCONTRACTOR
INSTALL 2 X 6 WOOD
STUDS BETWEEN TRUSS 1" S.S. CABLE
MEMBERS WITH 2 1" GYP 4
SUPPORTS @
BD FINISH AND SOUND EACH HOOK
BATTS BETWEEN
ROUGH OPENING
946 S. Main Street
TRUSS TO WD.
NEW ALUMINUM Williamstown, NJ 08094
BOTTOM OF
NEW ALUMINUM
BLOCKING
INSTALL NEW BLACK-OUT CURTAINWALL 750 OG
AND ENTRY Phone: (856)-875-2792
SHADE OVER ENTIRE CURTAINWALL Fax: (856)-728-1483
WINDOW OPENING WITH INFILL WALL SYSTEM SYSTEM
REMOVE LIGHTS
LIGHT SEAL JAMBS & SILL WHERE WINDOW
FROM ABOVE
HAS BEEN James E. Ebersberger, AIA
NIGHT THEATER NJ ARCH AI1154
INSTALL OPAQUE REMOVED
CL
HIGH, ART DISPLAY SYSTEM ELECTRICAL PRINT ON GLASS
PROJECT. REMOVE ANY INSULATION
AT EACH ALCOVE. SEE DRAWINGS- SURFACE #2
BENEATH DAMAGED GY BD.
DRAWING EX-1 FOR TYPICAL
REPLACE WITH NEW GYP BD ABOVE
3'-0" AFF. INSTALL NEW INSULATION LOCATIONS (15 TOTAL)
BENEATH. PATCH ADJACENT AREAS, 2 X 8 WD UNI-STRUT GRID
CL
TRIM, ETC. FRAMING WITH 2' X 2' EA WAY,
3"PLYWOOD PAINTED FLAT CLEAR GLASS
4 BLACK
CL
DECKING NEW ALUMINUM
CURTAINWALL
AND ENTRY
REMOVE ANY ACOUSTIC SYSTEM
PANELS. REPAIR / REPLACE
EXISTING GYP BD ON EXISTING
PANEL LIGHT COVE SCONCE 2 X 6 WD
STRUCTURES. STUD WALL PATTERNED
CL
INSTALL NEW BARREL DIFFUSER 1" GYP
WITH 2 SCREEN PRINT ON
PANELS. BD FINISH. GLASS SURFACE
REMOVE ANY ACOUSTIC INSTALL NEW 12"
#2
2 X 4 WD PATCH
PANELS. REPAIR / CEMENT BOARD WALL
STUD WALL INSTALL 6 NEW 48" X 78"
REMOVE CONCRETE REPLACE EXISTING GYP SHEATHING 1" GYP WHERE
FOUNDATION FOR FORMER BD ON EXISTING PANEL THROUGHOUT WITH 2 ACOUSTIC WALL PANELS
CABINET ON EAST AND WEST
BIRDHOUSE TO DOWN LIGHT COVE PROJECT UP TO 3'-0" BD FINISH
HEATERS WALLS (3 ON EA. WALL)
BELOW GRADE, PATCH STRUCTURES. AFF. INSTALL NEW FRP 7 SOUND
ARE BEING OF ENTRY/LOBBY
EXTERIOR WALL FINISH AND INSTALL NEW ACOUSTIC PANEL FROM FINISH BATTS
REMOVED NEW ALUMINUM
SHEATHING AS REQUIRED PANELS. FLOOR TO 3'-0" AFF. BETWEEN.
750 OG
INSTALL TRIM AS
CURTAINWALL
DETAILED.
SYSTEM
REMOVE ANY
REMAINING
PROVIDE BASE REMOVE EXISTING WOOD PROVIDE ALL NEW INTERIOR WALLS AND DAMAGED GYPSUM INSTALL NEW 1 REMOVE EXISTING DOOR INSTALL NEW SYNTHETIC PREP EXISTING
ACOUSTICAL BOARD
PROTECTIVE EXISTING INTERIOR WALLS WHERE GYP BOIARD HAS BEEN 2" CEMENT AND FRAME, PACK OUT TRIM IN ALL AREAS EXCEPT CONCRETE SLAB.
FINISH AND INSTALL TRIM AT FRAMING FROM AROUND BOARD SHEATHING
NEW ACOUSTIC BOARD COLUMNS AND COLUMNS IN AUDITORIUM COVER OVER BD HAS BEEN OR WILL BE REMOVED REMOVED TO VARYING WALL AS REQUIRED AND BATHROOMS. BASE TO BE LEVEL EXISTING
THROUGHOUT PROJECT
FINISH ON WALL WALL BEYOND UP TO FRAMED OPENING BOLTS AND WILL RECEIVE NEW SOUND BATT HIEGHTS AFF. ALL INSTALL NEW ALUMINUM INSTALLED AT FACE/SIDES FLOOR w/ LEVELING
UP TO 3'-0" AFF. INSTALL
SCONCE STRUCTURES HEIGHT. PAINT EXPOSED BRACKET INSULATION FOR THE FULL THICKNESS REMAINING GYPSUM LOBBY ENTRANCE DOOR OF SOME WALL MOUNTED COMPOUND (+/-
NEW FRP/PVC WAINSCOT
TYPICAL THROUGHOUT COLUMNS. OF THE WALLS. BOARD THROUGHOUT AND FRAME SYSTEM. EXHIBITS. COORDINATE WITH 3"@LOWEST POINT)
FROM FINISH FLOOR TO
PROJECT. REPLACE PROJECT, UP TO 3'-0" EXHIBIT DRAWINGS. PRIOR TO
3'-0" AFF. INSTALL
ANY DAMAGED GYP BD AFF SHALL BE REMOVED INSTALLATION OF
SYNTHETIC TRIM AS
FINISH TO THESE FINISH TILE
DETAILED.
SCONCES
1" ALUMINUM
NEW 2
REGLET PATTERN
ON ALL WALLS IN
ENTRY/ LOBBY.
1" GYP BD
NEW 2
ON ALL WALLS IN
ENTRY/ LOBBY.
INTERPRETIVE
IREMOVE EXISTING SOLID
PANELS BETWEEN TRUSS
MEMBERS IN INSIDE OF
CENTER
GLASS.
RENOVATIONS
Liberty State Park
REMOVE EXISTING REMOVE EXISTING
DGR
A-7
REMAIINING GYPSUM BOARD TO DUCT ENCLOSURES
THROUGHOUT PROJECT, UP INSTALL PROTECTIVE COVER OVER EACH EXPOSED BOLT/NUT/BASE
THROUGHOUT PROJECT, UP
TO 3'-0" AFF SHALL BE TO 3'-0" AFF SHALL BE
REMOVED REMOVED
946 S. Main Street
Williamstown, NJ 08094
Phone: (856)-875-2792
Fax: (856)-728-1483
INTERPRETIVE
CENTER
RENOVATIONS
Liberty State Park
Ave
Jersey City, NJ
for the
State
of
New Jersey
P 1111-00 / 21501
Bidding
DGR
A-8
946 S. Main Street
Williamstown, NJ 08094
Phone: (856)-875-2792
Fax: (856)-728-1483
MB TH
MB TH
MB TH
AL TH
AL TH
AL TH
AL TH
AL TH
INTERPRETIVE
AL TH AL TH
CENTER
RENOVATIONS
Liberty State Park
MB TH MB TH MB TH Ave
Jersey City, NJ
for the
State
of
New Jersey
P 1111-00 / 21501
Final Design # 4
December 1, 2017
AL TH AL TH
DGR
A-9
AL TH
MB TH MB TH MB TH
946 S. Main Street
Williamstown, NJ 08094
Phone: (856)-875-2792
Fax: (856)-728-1483
AL TH AL TH
INTERPRETIVE
CENTER
RENOVATIONS
Liberty State Park
Ave
Jersey City, NJ
for the
State
New Jersey
P 1111-00 / 21501
Bidding
DGR
A-10
3.A
A-11 946 S. Main Street
Williamstown, NJ 08094
Phone: (856)-875-2792
PREP / RE-PAINT INTERIOR & Fax: (856)-728-1483
EXTERIOR OF EXISTING WOOD
TRUSS James E. Ebersberger, AIA
NJ ARCH AI1154
TRUSS MEMBERS
TRUSS MEMBERS
ROUGH OPENING
3.B
A-11
BOTTOM OF TRUSS
3.C
TO WD.BLOCKING
ROUGH OPENING
NEW 1" SLATE SILLS A-11 NEW ALUMINUM CURTAINWALL SYSTEM
BETWEEN TRUSS BOTTOM AND NEW
NEW WD STUD WALL STEEL TUBE BEAM
WITH GYP BD INTERIOR,
WEATHER BOARD EXTERIOR
& BATT INSULATION
BETWEEN STUDS. CL
12
12 NEW METAL ROOF SYSTEM ON
TOP OF STEEL TUBE
2 X 8 WOOD FRAMING
MEMBERS @ 12" O.C.
CL
1"
NEW STUCCO SOFFIT ON ON 2
DENSGLASS SHEATHING OVER 2 X 6
WD FRAMING MEMBERS @12" O.C.
3.D
A-11
EXISTING STUCCO /
PLYWOOD / MASONRY
COLUMN & BEAM
CL
INTERPRETIVE
CL
CENTER
RENOVATIONS
Liberty State Park
Freedom Way
Jersey City, NJ
for the
State
NEW CONCRETE TOPPING
of
ON EXISTING SLOPED New Jersey
CONCRETE FLOOR
P 1111-00 / 21501
Bidding
DGR
A-11
946 S. Main Street
Williamstown, NJ 08094
Phone: (856)-875-2792
Fax: (856)-728-1483
INTERPRETIVE
CENTER
RENOVATIONS
Liberty State Park
Freedom Way
Jersey City, NJ
for the
State
of
New Jersey
P 1111-00 / 21501
Bidding
DGR
A-12
946 S. Main Street
Williamstown, NJ 08094
Phone: (856)-875-2792
Fax: (856)-728-1483
INTERPRETIVE
CENTER
RENOVATIONS
Liberty State Park
Freedom Way
Jersey City, NJ
for the
State
of
New Jersey
P 1111-00 / 21501
Bidding
DGR
A-13