ALGERIA GAS TASK RISK ASSESSMENT.

Risk Assessment No. 2 IA Department / Location Number of People Involved 3


March 10 Drilling
Activity: Lifting of skid units during rig moves.
Notes: This assessment is purely on the integrity of the skid lifting points , further risk assessments required to be carried out for the use of the lifting
equipment required to lift the skids or move them.

Hazard Identified Hazard Effect Risk Evaluation Control Measures Action Residual Risk
Use the checklist as a guide and be Type of Injury / Refer to the Required Person Date R
specific equipment damage or Responsible Completed
evaluation forms (Include existing and proposed)
Environmental impact
HE Prob Risk HE Prob Risk

1.Failure of skid lift points resulting in 1. Fatality A M 12 1. Restricting people around lift. TP/Co A L 8
dropped object. Man
2. Visual inspection prior to lift.
3. Tool box talks prior to lift

2. SIMOPS 1. Fatality A M 12 1. Any task which may have an TP/Co A L 8


impact on the lifting operation will Man
be Risk Assessed and a Permit to
work will be raised where necessary
2. Equipment 2. As Above
damage

General Comments:
Emergency Provisions Required:

Assessment Team: Jim Morrice ( HSE), Willy Wallace, Len Boud ( Sen drill sup )

Authorising Signatures Below:


Team Leader: Print Willy Wallace Sign: Date 10 March 2001
Drilling Manager / Delegate Print Sign Date

ALGERIA GAS TASK RISK ASSESSMENT.

POST TASK RISK ASSESSMENT REVIEW DATE:

REVIEW TEAM NAMES: (Must include at least one person involved in task, e.g. P.A.)

Were any improvements made to the Assessment following the review? YES/NO

What were the nature of the improvements? e.g. Additional hazards identified? Additional control measures identified?

Has the Assessment been updated to reflect the improvements? YES/NO


Review Team Leader: Print Sign: Date

Drilling Manager / Delegate Print Sign Date