SUBSTATIONS
In the Power System of the Future
Terry Krieg
Chairman CIGRE Study Committee B3 - Substations
Overview
• Background
• CIGRE Study Committee B3 Activities
• Challenges in Industry
• Trends in Substation Development
• The Future Substation
• Questions
The big picture - global influences
Background
World Energy Consumption
3.0%
2.5%
2.0%
1.5%
1.0%
0.5%
0.0%
CIGRÉ
Who is CIGRÉ?
Technical Committee
SC C6 Distributed Systems
& Dispersed Generation
SC B3 Structure
Study Committee
24 Regular Members, 14 Observer Members, 2 Special Reporter, all WB Convenors
B3.29 B3.32
B3/C1/C2.14
Field test technology on UHV substation Saving through optimized maintenance of
Circuit Configuration Optimisation
construction and operation Air insulated Substations
B3.36
B3.30
Special Considerations for AC Collector
Guide to minimize the use of SF6 during
Systems and Substations associated with
routine testing of electrical equipment
HVDC connected Wind Powers Plants
B3.35
JWG B3/B1.27
Substation earthing system design
Factors for investment decision GIL vs.
optimisation through the application of
Cables for AC Transmission
quantified risk analysis
WG B3.24
Benefits of PD diagnosis on GIS condition
assessment
WG B3.37
Internal arc effects in medium voltage
switchgear (1-52kV) - mitigation techniques
B1/B3.33
Feasability of a common dry type interface
for GIS and Power cables of 52 kV and
above
SC B3 – Membership
Study Committee B3
Mission:
• To facilitate and promote the progress of engineering
• International exchange of information and knowledge
• Add value to this information and knowledge by:
• Synthesizing state-of-the-art practices and
• Developing recommendations and providing best practice.
Scope:
• Design, construction, maintenance and management
• Technical, economic, environmental and social aspects for
stakeholders
• Increased reliability and availability, cost effective solutions,
managed environmental impact, effective asset
management.
• Requires effective relationships with other SC‟s
Preferential Subjects 2014
PS 1 : Substation Developments to address future needs
• Integration of new approaches to grid automation in
Transmission and Distribution substations
• Impact of new grid developments on substation design
• Off shore substations
• Low cost and fast deployment distribution substations
B3.25 SF6 Analysis for AIS, GIS and MTS Condition Assessment 567
Challenges
Some global challenges
• Increasing demand in some countries – megacities
• Integration of renewables and embedded generation
• Industry restructuring and regulation
• Cyber security
• Severe weather conditions
• Design standards and lack of innovation
• Aging assets
• Skill shortages, retention,
• Resistance to change
• Generation Y (born 1980 -1995)
Some Utility challenges
Environment
Reduce emissions of (CO2,…)
Sound, visual impact, ….
Interior (Personel safety)
Exterior (Third party safety)
Stakeholders Profitability
Increased customer services Reduce maintenance costs
Reliability Utility Reduce outages
Political pressure Minimize penalties
Investment decisions Image
Ellagen
Legislation
Health & Safety
Report inventory of SF6
SF6 leakage limited by law (California)
Import tax (Australia)
Trend 1
Current Design
Substation Design
State Policies
Primary
CAPEX Functional
Review Specific-
ations
Secondary
Future Concept
State Design
Vision
Civil
Reference
Tech
Tech Tech
Tech Tech
Tech
Design
Stds. Tech
Specs. Other
Specs.
Stds.
Manual Specs.
Specs. Specs.
Docs.
Standard Designs in Ergon
TB389
Trend 2
SMART Grids
Traditional Topology
61850 Development
One Protocol for Substations
GOOSE
61850 – The digital substation
1950 2000
Source: Hans-Erik Olovsson, SC B3/AA1 2011
Disconnecting Circuit Breaker
• Combines the disconnecting function with CB
Reduces substation footprint
Extends maintenance intervals
Higher overall availability
DS CB
CT DCB
CT
BB BB
ES VT ES VT
43
Source: Hans-Erik Olovsson, SC B3/AA1 2011
Rotating Withdrawable
44
Source: Hans-Erik Olovsson, SC B3/AA1 2011
Gas Insulated Switchgear
Key Features:
• V = 1100kV DC
• P = 22,000MW
• L = 5,600kM
• Cost = ?
UHV – New Test Techniques
Trend 7
Consideration of risk
Information systems
Changes to design standards
New test techniques:
On-line monitoring of DGA enhancing traditional methods
Integrated condition monitoring
Frequency Response Analysis
Trend 8
Islanding
Control
Energy Flow
SVC G
Voltage &
Load
Control
Fault
Limiter
G Storage
• TERRY KRIEG
• tkrieg@globalskm.com