ENGINEERS SCALE OF FEES
1
ENGINEERS REGISTRATION BOARD
----------------------------------------------------------------------------------------------------------------------------- -------
3 FEES STRUCTURE FOR ENGINEERING Table 1a: Hourly Rates for Engineering
SERVICES Services
3.1 Introduction
No Category of Engineer Level 1 Level 2 Level 3
This schedule sets minimum fees to be paid 0-4 4-8 8+
for engineering services in Uganda. This Years Years Years
schedule provides for four different methods 1 Technical Assistant 15 17.5 20
of remuneration namely:
2 Technician 20 25 30
I. Percentage fee based on the cost of
works. 3 Technologist 30 37.5 45
II. Time based fees. 4 Engineer 45 67.5 90
III. Reimbursement Fees. 5 Specialist/Principal 0 90 160
IV. Reimbursable expenses.
2
ENGINEERS REGISTRATION BOARD
----------------------------------------------------------------------------------------------------------------------------- -------
3.3 SCALE OF FEES – AS PERCENTAGE OF 4.3 Level 3: Technologist
PROJECT COST
This schedule outlines a scale of fees [billing This is a person with a higher diploma in engineering
rates] as a percentage of project cost. Project from a recognized technical institution in Uganda
cost shall be based on the cost categories shown and Technologist Member of Uganda Institution of
in Table 2. Professional Engineers. Three scales will be
applicable in this category to cover 0-4 years, 4-8
The payment for repetitive work shall be as years and over 8years.
follows:
(a) There will be no reduction for repetition 4.4 Level 4: Engineer
of floors
(b) Where there are a number of identical
This is a person with a Bachelor’s degree in
blocks/units, at the same site or
engineering from a recognized university/college.
different sites, full fees will be charged
Three scales will be applicable in this category to
on the first block and 50% of the full fee
cover 0-4 years, 4-8 years and over 8years.
for each subsequent blocks/units for
designs fees only and 100% for
4.5 Level 5: Specialists and Principals
supervision fees.
3
ENGINEERS REGISTRATION BOARD
----------------------------------------------------------------------------------------------------------------------------- -------
shall be submitted as proof of completion. It implications, list of consents and approvals, and
includes planning, studies, investigations and schedule of required surveys, tests, analyses and
assessments, inception, preliminary design, detail other investigations.
design, tender documentation and procurement,
contract administration and inspection, project 5.2 Inception
completion and handover, engineering
management services and other services. This involves establishment of the client
requirements and preferences, assessment of user
5.1 Planning, Studies, Investigations and needs and options, appointment of the necessary
Assessments consultants, establishment of the project brief
including project objectives, priorities, constraints,
The works involved in this stage include preparation assumptions, aspirations and strategies. It
of reports related to preliminary proposals, encompasses the following activities;
feasibility studies , preparation of cost and time for 1) Assistance in developing a clear project
consideration by the Client, including any of the brief.
following; 2) Attending project initiation meetings.
1) Consultation with the Client or the 3) Advising on procurement policy for the
Client’s representative. project.
2) Inspection of the site of the project. 4) Advising on the rights, constraints,
3) Preliminary investigation, route location, consents and approvals.
planning and a level design appropriate 5) Defining the scope of services and works
to allow project decisions to be made, required.
where any of these are required to 6) Concluding the terms of the agreement
determine the level of feasibility. with the client.
4) Consultation with authorities having 7) Inspecting the site and advising on the
rights or powers of sanction as well as necessary surveys, analyses, tests and site
consultation with the public and other investigations where such
stakeholder groups. information will be required for availability
5) Advice to the Client as to regulatory and and location of infrastructure and services.
statutory requirements, including 8) Determining the availability of data,
environmental management and the drawings and plans relating to the project.
need for surveys, analyses, tests on site 9) Advising on the criteria that could influence
and other investigations, as well as the project life cycle cost significantly.
approvals, where such are required for 10) Providing necessary information within the
the completion of the report and agreed scope of the project to other
arranging for these to be carried out at consultants involved.
the Client’s expense.
6) Searching for, obtaining, investigation Deliverables: agreed scope of services and scope of
and collation of available data, drawings work, signed agreement, report on project, site and
and plans relating to the works. functional requirements, schedule of required
7) Investigation of financial and economic surveys, tests, analyses, site and other
implication relating to the proposals or investigations, and schedule of consents and
feasibility studies. approvals.
8) Clause (7) does not apply in respect of
civil and structural services pertaining to 5.3 Preliminary Design
building projects, except as far as the
interpretation of cost figures for civil This stage involves preparation and finalizing the
and structural works are concerned. project concept according to the brief, including
project scope, scale, character, form and function,
Deliverables: collation of information, reports on preliminary program and viability of the project. It
technical and financial feasibility and related includes the following activities;
4
ENGINEERS REGISTRATION BOARD
----------------------------------------------------------------------------------------------------------------------------- -------
1) Agreeing on documentation program with 4) Incorporating other consultant’s designs
principal consultant and other consultants and requirements into the design.
involved. 5) Preparing design development drawings
2) Attending design and consultants including draft technical details and
meetings specifications.
3) Establishing the concept design criteria. 6) Reviewing and evaluating design and
4) Preparing initial concept design and related outline specifications and exercising cost
documentation. control.
5) Advising the client regarding further 7) Preparing detailed estimates of
surveys, analyses, tests and investigations construction cost.
which may be required. 8) Liaising, co-operating and providing
6) Establishing regulatory authorities’ necessary information to the principal
requirements and incorporate into the consultant and other consultants involved.
design. 9) Submitting the necessary design
7) Refining and assessing the concept design documentation to local and other
to ensure conformity with all regulatory authorities for approval.
requirements and consents.
8) Establishing access, utilities, services and Deliverables: design development drawings, outline
connections required for the design. specifications, local and other authority submission
9) Coordinating design interfaces with other drawings and reports, and detailed estimates of
design consultants involved. construction costs.
10) Preparing process designs, preliminary
designs and related documentation for 5.5 Tender Documentation and
approval by authorities and client and Procurement
suitable for costing.
11) Providing project cost and life cycle cost as This stage involves preparing procurement and
required. construction documentation, confirming and
12) Liaising, cooperating and providing the implementing procurement strategies and
necessary information to the client, procedures for effective procurement of the
principal consult and other consultants necessary resources for execution of the project.
involved. Tasks include;
1) Attending design and consultants’
Deliverables: concept design, schedule of required meetings.
surveys, tests, and other investigations and related 2) Preparing specifications and preambles for
reports, process design, preliminary design and cost the works.
estimates as required. 3) Accommodating services design.
4) Checking cost estimates and adjusting
5.4 Detail Design designs and documents if necessary to
remain within budget.
This stage involves developing the approved 5) Formulating the procurement strategy for
concept to finalize the design, outline specifications, contractors or assisting the principal
cost plan, financial viability and program for the consultant where necessary.
project. The main activities include; 6) Preparing documentation for contractor
1) Reviewing documentation program with procurement.
principal consultant and other consultants 7) Reviewing designs, drawings, and
involved. schedules for compliance with approved
2) Attending design and consultants’ budget.
meetings. 8) Assisting in calling for tenders and/or
3) Incorporating client’s and authorities negotiation of prices and/or assisting the
detailed requirements into the design. principal consultant where relevant.
5
ENGINEERS REGISTRATION BOARD
----------------------------------------------------------------------------------------------------------------------------- -------
9) Liaising, cooperating and providing 12) Preparing valuations for payment
necessary information to the principal certificates to be issued by the principal
consultant and the other consultants as agent.
required. 13) Witnessing and reviewing all tests and
10) Assisting in the evaluation of tenders. mock ups carried out both on and off site.
11) Assisting with the preparation of contract 14) Checking and approving contractor
documentation for signature. drawings for design intent.
12) Assessing samples and products for 15) Updating and issuing drawings register.
compliance and design intent. 16) Issuing contract instructions as and when
required.
Deliverables: specifications, services co-ordination, 17) Reviewing and commenting on operation
working drawings, budget construction cost, tender and maintenance manuals, guarantee
documentation, tender evaluation report, tender certificates, and warranties.
recommendations and priced contract 18) Inspecting the works and issuing practical
documentation. completion and defects lists.
19) Arranging for the delivery of all test
5.6 Contract Administration and Inspection certificates, including the electrical
certificate of compliance, statutory and
This stage includes managing, monitoring and other approvals, as built drawings and
administering construction contracts and processes operating manuals.
including preparing and coordinating procedures
and documentation to facilitate practical Deliverables: schedules of predicted cash flow,
completion of the works. Tasks include; construction documentation, drawing register,
1) Attending site handover. estimates for proposed variations, contract
2) Issuing construction documentation in instructions, financial control reports, valuations for
accordance with the documentation payment certificates, progressive and draft final
schedule including, in the case of structural accounts, practical completion and defects lists and
engineering, reinforcing bending electrical certificate of compliance.
schedules, detailing and specifications of
structural steel sections and connections. 5.7 Project Completion and Handover
3) Carrying out contract administration
procedures in terms of the contract. This stage involves fulfilling and completing the
4) Preparing schedules of predicted cash project including necessary documentation to
flows. facilitate effective completion, handover and
5) Preparing pro-active estimates of operation of the project. Tasks include;
proposed variations for client decision- 1) Inspecting and verifying the rectification of
making. defects.
6) Attending regular site, technical and 2) Receiving, commenting and approving
progress meetings. relevant payment valuations and
7) Inspecting works for conformity to completion certificates.
contract documentation. 3) Preparing and/or procuring operations and
8) Adjudicating and resolving financial claims maintenance manuals, guarantees and
by contractor(s). warranties.
9) Assisting in the resolution of contractual 4) Preparing and/or procuring as-built
claims by the contractor. drawings and documentation.
10) Establishing and maintaining a financial 5) Concluding the final accounts where
control system. relevant.
11) Clarifying details and descriptions during Deliverables: valuations for payment certificates,
construction as required. works and final completion lists, operation and
maintenance manuals, guarantees and warranties,
6
ENGINEERS REGISTRATION BOARD
----------------------------------------------------------------------------------------------------------------------------- -------
and as-built drawings and documentation, and final team, and make recommendations to the
accounts. client for the award of the contract.
9. arrange for the preparation and signing of
5.8 Project Management Services the contract documents with assistance of
the other members of the team.
Should the client require the Engineer to undertake 10. Issuing all instruments to contractors,
duties of an engineering management nature on either directly or by delegation to the
behalf of the client, the services shall include; other members of the team.
1. Leadership of the professional team. 11. Convening and presiding over regular
2. Being responsible for the overall meetings on site with contractors,
administration of the project including the members of the team and the client for
coordination of the work of the team, the the purpose of administering the contract
programming of the execution of designs including the preparation and distribution
and the overall financial control of the of agendas and minutes to all concerned.
project. 12. Processing and certifying all payment and
3. Instructing the other members of the valuation certificates and issue payment
team, on behalf of the client, in writing as certificates for settlement.
to the client’s total requirements in
connection with the project, including the 5.9 Other Services
services required from each of the other
members and make available to them all Other services include; occupational health and
relevant information or data pertaining to safety, quality assurance services such as technical
the project which is required by them. The and financial audits of completed projects and
other members of the team shall be dispute resolution.
entitled to rely upon the accuracy and
completeness of such information and 5.9.1 Occupation Health and Safety
data furnished by the Engineer.
4. Convening and presiding over regular The client may require services of a Engineer for
meetings of the team and the client for occupational health and safety based on
purposes of planning the project including Occupation Health and Safety Act and the
preparing and distributing agendas and construction regulations. Such services include;
minutes to all concerned. 1. The Engineer must arrange, formally and in
5. Coordinating the preparation of a budget writing, for the contractor to provide
for the client, together with assistance documentary evidence of compliance with
from other members of the team and all the requirements of Occupational
update it at regular intervals as agreed Health and Safety Act and Construction
with the client. Regulations.
6. Preparing a construction and procurement 2. The Engineer must execute the duties of
plan and policy according to the client’s the client, as his appointed agent, as
requirements with regard to types of contemplated in the Construction
contracts to be adopted, general and Regulations to the Occupational Health
commercial conditions and the grouping and Safety Act.
of items and elements into various
contracts. 5.9.2 Quality Management Services
7. With assistance of the other members of
the team, determine and recommend to Where the client requires that a quality
the client a policy for calling for tenders management system or quality assurance services,
and/or negotiating contracts. over and above construction supervision services,
8. Coordinating reports and be applied to the project, these are in addition to
recommendations on tenders received, normal services provided by the Engineer and to be
either directly or by other members of the
7
ENGINEERS REGISTRATION BOARD
----------------------------------------------------------------------------------------------------------------------------- -------
specifically defined and separately agreed in writing
prior to commencement. Table 4: Payment of Engineering Services
8
ENGINEERS REGISTRATION BOARD
----------------------------------------------------------------------------------------------------------------------------- -------
Table 3 Guide to Engineering Responsibility Levels
9
ENGINEERS REGISTRATION BOARD
----------------------------------------------------------------------------------------------------------------------------- -------
Table 2: Scale of Fees as a Percentage of Project Costs
Up to 1,000,000 6.25