Project Name: Metra Electric Line Substations

Project No.: 21002 Kaltsouni Mehdi,


Location:
Client:
Homewood Substation
Metra
Inc.
ARCHITECTS 4 ENGINEERS
407 South Dearborn Street, Suite 200
Designer: EG Date: 9/17/2018 Chicago, Illinois 60605
Checked By: MK Date: 10/25/2010 Tel.: 312.987.9800 Fax.: 312.987.9892

DESIGN OF TWO-WAY REINFORCED CONCRETE SLAB

Design Specifications: ACI 318-08

Yield Stresses:
fy 40000 psi
fc' 3000 psi

Loading:
Service Live Load 100 psf
Service Dead Load 50 psf Excluding slab weight)

Slab: M Ratio 0.72 Two - way Slab


L - Long span 18.75 ft
S - Short span 13.5 ft Min. h
Slab h 7 in => 6.8 in
Concrete cover 1.5 in

Case Number (#) 1 All Four Edges discontinues

Slab Reinforcement: Bar # 4


Bar Area 0.2 in²
Bar Dia 0.500 in

Check for Shear:


Along Long Support: O.K.
Along Short Support: O.K.

Case # Description Standard reinforcing Bars


1 All Four Edges discontinues Bar # Area Diameter
2 All Four Edges continues 3 0.11 0.375
3 Two long edges discontinues 4 0.20 0.5
4 One long and one short discontinues 5 0.31 0.625
5 Two short edges discontinues 6 0.44 0.75
6 Two short and one long edge discontinues 7 0.60 0.875
7 Two long and one short edges discontinues 8 0.79 1
8 One long edge discontinues 9 1.00 1.128
9 One short edge discontinues 10 1.27 1.27

Page 1 of 6
Project Name: Metra Electric Line Substations
Project No.: 21002 Kaltsouni Mehdi,
Location:
Client:
Homewood Substation
Metra
Inc.
ARCHITECTS 4 ENGINEERS
407 South Dearborn Street, Suite 200
Designer: EG Date: 9/17/2018 Chicago, Illinois 60605
Checked By: MK Date: 10/25/2010 Tel.: 312.987.9800 Fax.: 312.987.9892

Analysis Results:

Slab Weight: 87.50 psf


Deadload: 137.50 psf
Liveload 100.00 psf
Wu = 1.2Wd + 1.6WL
Total Load, Wu = 325.00 psf

M = La/Lb 0.72

Considering 1 foot strip: 325.00 plf

SHORT SPAN:

Negative Moment at Continues Edges (Top Bars)


Ca, neg. 0.000
Ma, neg. = Ca, neg WLa² 1.03 ft-kip
Positive Moment at Midspan (Bottom Bars)
Deadload, Ca 0.052
Ma, pos, dL = CaWLa² 1.58 ft-kip
Liveload, Ca 0.052
Ma, pos, LL = CaWLa² 1.53 ft-kip
Ma, pos.(dL+LL) 3.10 ft-kip
Negative Moment at Discontinues Edge (1/3 pos. moment) Top Bars
Ma, neg. = Ma,pos(dL+LL)/3 1.03 ft-kip

LONG SPAN:

Negative Moment at Continues Edges (Top Bars)


Cb, neg. 0.000
Mb, neg. = Cb, neg WLb² 0.94 ft-kip
Positive Moment at Midspan (Bottom Bars)
Deadload, Cb 0.025
Mb, pos, dL = CbWLb² 1.44 ft-kip
Liveload, Cb 0.025
Mb, pos, LL = CbWLb² 1.40 ft-kip
Mb, pos.(dL+LL) 2.83 ft-kip
Negative Moment at Discontinues Edge (1/3 pos. moment) Top Bars
Mb, neg. = Mb,pos(dL+LL)/3 0.94 ft-kip

Page 2 of 6
Project Name: Metra Electric Line Substations
Project No.: 21002 Kaltsouni Mehdi,
Location:
Client:
Homewood Substation
Metra
Inc.
ARCHITECTS 4 ENGINEERS
407 South Dearborn Street, Suite 200
Designer: EG Date: 9/17/2018 Chicago, Illinois 60605
Checked By: MK Date: 10/25/2010 Tel.: 312.987.9800 Fax.: 312.987.9892

Reinforcement Design: SHORT SPAN LONG SPAN


Top Bottom Top Top Bottom Top
Cont. Edge Midspan Discont.Edge Cont. Edge Midspan Discont.Edge
Max. Ultimate Moment, Mu = 1.03 3.10 1.03 0.94 2.83 0.94
Mn = Mu/0.90 1.15 3.45 1.15 1.05 3.15 1.05
Effective depth, d 5.25 5.25 5.25 4.75 4.75 4.75
Rn = Mn/bd² 41.71 125.12 41.71 46.51 139.54 46.51
ρmin. = 0.0018( ACI 7.12) 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018
ρmax=0.75*0.85β(fc'/fy)(87/(87+fy)) 0.0278 0.0278 0.0278 0.0278 0.0278 0.0278
m = fy/.85fc' 15.686 15.686 15.686 15.686 15.686 15.686
ρ = 1/m(1 - sqrt(1-2mRn/fy) 0.0018 0.0032 0.0018 0.0018 0.0036 0.0018
As = ρbd 0.113 0.202 0.113 0.103 0.205 0.103
Reinf. Bar # 4 4 4 4 4 4
Reinf. Bar Spacing, in 21.16 11.87 21.16 23.39 11.73 23.39
Max. Spacing, Min(2h; 18in) 18.00 18.00 18.00 18.00 18.00 18.00
Final Bar Spacing, in 18.00 11.00 18.00 18.00 11.00 18.00

Shear Check:

Load on Supporting Beams:

W = Wu*L*S 82.27 kip

Along Long Support:


Wa = Shear ratio on slab 0.68
WS = Wa*W 55.94 kip
Load on long support beam, WS/2L 1.49 klf
ØVc = 0.75(2)(√fc')(Eff. d) 5.18 klf O.K.

Along Short Support:


Wb = Shear ratio on slab 0.32
WL = Wb*W 26.33 kip
Load on short support beam, WL/2S 0.98 klf
ØVc = 0.75(2)(√fc')(Eff. d) 4.68 klf O.K.

Page 3 of 6
Project Name: Riverfront Plaza RT
Project No.: ML90-018 Concordia Wireless,
Location: Roof slab Inc.
Client: T-Mobile
Designer: EG Date: 9/17/2018
Checked By: Date:

TWO-WAY REINFORCED CONCRETE SLAB

Design Specifications: ACI 318-08

Yield Stresses:
fy 40000 psi
fc' 3000 psi

Loading:
Service Live Load 56 psf (25psf Snow + 31 psf from sled mount)
Service Dead Load 25 psf Roofing and Insullation (Excluding slab weight)

Slab: M Ratio 0.94 Two - way Slab


L - Long span 21.25 ft
S - Short span 20 ft Min. h
Slab h 8 in => 7.7 in
Concrete cover 1.5 in

Case Number (#) 1 All Four Edges discontinues

Slab Reinforcement: Bar # 5


Bar Area 0.31 in²
Bar Dia 0.630 in

Check for Shear:


Along Long Support: O.K.
Along Short Support: O.K.

Case # Description Standard reinforcing Bars


1 All Four Edges discontinues Bar # Area Diameter
2 All Four Edges continues 3 0.11 0.375
3 Two long edges discontinues 4 0.20 0.5
4 One long and one short discontinues 5 0.31 0.625
5 Two short edges discontinues 6 0.44 0.75
6 Two short and one long edge discontinues 7 0.60 0.875
7 Two long and one short edges discontinues 8 0.79 1
8 One long edge discontinues 9 1.00 1.128
9 One short edge discontinues 10 1.27 1.27

Page 4 of 6
Project Name: Riverfront Plaza RT
Project No.: ML90-018 Concordia Wireless,
Location: Roof slab Inc.
Client: T-Mobile
Designer: EG Date: 9/17/2018
Checked By: Date:

Analysis Results:

Slab Weight: 100.00 psf


Deadload: 125.00 psf
Liveload 56.00 psf
Wu = 1.2Wd + 1.6WL
Total Load, Wu = 239.60 psf

M = La/Lb 0.94

Considering 1 foot strip: 239.60 plf

SHORT SPAN:

Negative Moment at Continues Edges (Top Bars)


Ca, neg. 0.000
Ma, neg. = Ca, neg WLa² 1.67 ft-kip
Positive Moment at Midspan (Bottom Bars)
Deadload, Ca 0.052
Ma, pos, dL = CaWLa² 3.14 ft-kip
Liveload, Ca 0.052
Ma, pos, LL = CaWLa² 1.88 ft-kip
Ma, pos.(dL+LL) 5.02 ft-kip
Negative Moment at Discontinues Edge (1/3 pos. moment) Top Bars
Ma, neg. = Ma,pos(dL+LL)/3 1.67 ft-kip

LONG SPAN:

Negative Moment at Continues Edges (Top Bars)


Cb, neg. 0.000
Mb, neg. = Cb, neg WLb² 0.89 ft-kip
Positive Moment at Midspan (Bottom Bars)
Deadload, Cb 0.025
Mb, pos, dL = CbWLb² 1.68 ft-kip
Liveload, Cb 0.025
Mb, pos, LL = CbWLb² 1.00 ft-kip
Mb, pos.(dL+LL) 2.68 ft-kip
Negative Moment at Discontinues Edge (1/3 pos. moment) Top Bars
Mb, neg. = Mb,pos(dL+LL)/3 0.89 ft-kip

Page 5 of 6
Project Name: Riverfront Plaza RT
Project No.: ML90-018 Concordia Wireless,
Location: Roof slab Inc.
Client: T-Mobile
Designer: EG Date: 9/17/2018
Checked By: Date:

Reinforcement Design: SHORT SPAN LONG SPAN


Top Bottom Top Top Bottom Top
Cont. Edge Midspan Discont.Edge Cont. Edge Midspan Discont.Edge
Max. Ultimate Moment, Mu = 1.67 5.02 1.67 0.89 2.68 0.89
Mn = Mu/0.90 1.86 5.58 1.86 0.99 2.98 0.99
Effective depth, d 6.19 6.19 6.19 5.56 5.56 5.56
Rn = Mn/bd² 48.62 145.87 48.62 32.21 96.62 32.21
ρmin. = 0.0018( ACI 7.12) 0.0018 0.0018 0.0018 0.0018 0.0018 0.0018
ρmax=0.75*0.85β(fc'/fy)(87/(87+fy)) 0.0278 0.0278 0.0278 0.0278 0.0278 0.0278
m = fy/.85fc' 15.686 15.686 15.686 15.686 15.686 15.686
ρ = 1/m(1 - sqrt(1-2mRn/fy) 0.0018 0.0038 0.0018 0.0018 0.0025 0.0018
As = ρbd 0.134 0.279 0.134 0.120 0.164 0.120
Reinf. Bar # 5 5 5 5 5 5
Reinf. Bar Spacing, in 27.8 13.3 27.8 31.0 22.7 31.0
Max. Spacing, Min(2h; 18in) 16.0 16.0 16.0 16.0 16.0 16.0
Required Bar Spacing, in 16.0 13.0 16.0 16.0 16.0 16.0
Provided Bar Spacing, in 12 12 12 12 12 12
Check O.K. O.K. O.K. O.K. O.K. O.K.

Shear Check:

Load on Supporting Beams:

W = Wu*L*S 101.83 kip

Along Long Support:


Wa = Shear ratio on slab 0.68
WS = Wa*W 69.24 kip
Load on long support beam, WS/2L 1.63 klf
ØVc = 0.75(2)(√fc')(Eff. d) 6.10 klf O.K.

Along Short Support:


Wb = Shear ratio on slab 0.32
WL = Wb*W 32.59 kip
Load on short support beam, WL/2S 0.81 klf
ØVc = 0.75(2)(√fc')(Eff. d) 5.48 klf O.K.

Existing roof slab is adequate to support proposed sled mount.

Page 6 of 6