September 2005
Petrofac
Total Facilities Solutions CONTROL SYSTEMS
PLANT CONTROL SYSTEMS :
(PROCESS AUTOMATION SYSTEM: PAS)
SAFEGUARDING SYSTEM:
• EMERGENCY SHUTDOWN SYSTEM (PLC BASED).
(IPS: INSTRUMENT PROTECTIVE SYSTEM)
September 2005
Petrofac
DCS :DISTRIBUTED
Total Facilities Solutions CONTROL SYSTEM.
September 2005
Petrofac Typical configuration diagram of DCS
Total Facilities Solutions
Field or
Control Marshalling
Room Cabinets
JB
JB
Field
September 2005
Petrofac CONTROL SYSTEM
Total Facilities Solutions ARCHITECTURE
September 2005
Petrofac
Total Facilities Solutions
September 2005
Petrofac
Total Facilities Solutions DCS COMPONENTS
• SYSTEM MARSHALLING CABINET.
• SYSTEM CABINET.
• ENGINEERING STATION.
• OPERATING STATION.
• COMMUNICATION LINK HARDWARE.
• LOCAL AREA NETWORK
• SOFTWARE PACKAGES.
• GPS CLOCK.
• PRINTERS, PLASMAS, CONTROL DESKS (CONSOLES).
• MISC. FURNITURE (Eg. CHAIRS, FILING CABINETS, WHITE
BOARDS)
September 2005
Petrofac
SYSTEM MARSHALLING CABINET
Total Facilities Solutions
September 2005
Petrofac
SYSTEM MARSHALLING CABINET
Total Facilities Solutions
• POWER SUPPLY:
• 230 VAC: TO PROVIDE POWER TO INTERNAL
CABINET UTILITIES (LIGHT, FUN, FLOW SWITCH)
AND TO 230VAC/24VDC POWER CONVERTER.
September 2005
Petrofac
Total Facilities Solutions SYSTEM CABINET
• POWER DISTRIBUTION BOARDS: TO PROVIDE
POWER TO ALL RACKS.
September 2005
Petrofac
Total Facilities Solutions SYSTEM CABINET
• OTHER SLOTS: CAN BE EITHER:
• REDUNDANT I/O CARDS: AI, AO, DO, DI AND FF
CARDS WHICH ARE CONNECTED TO FTA (FIELD
TERMINAL ASSEMBLY) THROUGH SYSTEM
CABLE.
• COMMUNICATION CARDS: TO COMMUNICATE
DCS SYSTEM WITH OTHER SUB-SYSTEMS.
• REDUNDANT INTERNAL COMMUNICATION
CABLES TO CONNECT BETWEEN DIFFERENT
RACK.
• REDUNDANT NETWORK CABLE TO CONNECT
BETWEEN DIFFERENT CONTROLLERS.
September 2005
Petrofac
Total Facilities Solutions
ENGINEERING STATION
September 2005
Petrofac
Total Facilities Solutions OPERATING STATION
• OPERATING STATION HAS DIFFERENT LEVEL OF
USER NAME AND PASSWORD, AND IT IS
DESIGNED TO PROVIDE SOME FACILITIES TO
OPERATOR:
• MONITORING THE PLANT.
• CONTROLLING THE PLANT BY CHANGING THE
SET POINT OF SOME CONTROLLERS.
• OPERATING AND MAINTAINING THE PLANT BY
ACTIVATING SOME BUTTONS SUCH AS: MOS,
START & STOP, AND RESET BUTTONS.
September 2005
Petrofac
COMMUNICATION
Total Facilities Solutions LINK HARDWARE
September 2005
Petrofac
Total Facilities Solutions LOCAL AREA NETWORK
• IT IS REDUNDANT COMMUNICATION LINK
BETWEEN ALL PARTS OF DCS, IT RECENTLY
DEPENDS ON ETHERNET PROTOCOL FOR MOST
VENDORS.
• IT CONNECTS BETWEEN:
• DCS CONTROLLERS.
• OPERATOR AND ENGINEERING STATIONS.
• OTHER SOFTWARE STATION SUCH AS: AMS
(ASSET MANAGEMENT SYSTEM), CCTV AND
OPC.
September 2005
Petrofac
Total Facilities Solutions DCS SOFTWARE'S
• STANDARD OPERATING & MONITORING
FUNCTION
• LONG TERM DATA ARCHIVE, REPORT PACKAGE
• GRAPHIC BUILDER PACKAGE
• FOUNDATION FIELDBUS COMMUNICATION
PACKAGE
• SERVER FOR REMOTE OPERATION &
MONITORING FUNC.
• ELECTRONIC INSTRUCTION MANUAL.
• ADVANCE ALARM MANAGEMENT PACKAGE.
• AMS (ASSET MANAGEMENT SYSTEM).
September 2005
Petrofac
Total Facilities Solutions GPS CLOCK
• THE FUNCTION OF GPS CLOCK MODULE IS TO
MAINTAIN THE SAME TIME IN ALL DCS
CONTROLLERS AND PC’s ACCORDING TO
LOCAL TIME.
• IT CONSISTS OF:
• GPS ANTENNA WHICH RECEIVES TIME FORM
THE SATELLITE AND TRANSMITS IT TO GPS
MODULE.
• GPS MODULE IS CONNECTED TO NETWORK
THROUGH SWITCHES OR GATEWAY.
September 2005
Petrofac FEATURES AND CAPABILITIES OF DISTRIBUTED CONTROL
Total Facilities Solutions SYSTEM
• MODULAR SYSTEM
• EXPANDING CAPABILITY
September 2005
Petrofac
Total Facilities Solutions TYPICAL LOOP FF AI/AO
September 2005
Petrofac
Total Facilities Solutions TYPICAL LOOP FOR FF AI
September 2005
Petrofac
Total Facilities Solutions TYPICAL LOOP AI
September 2005
Petrofac
Total Facilities Solutions TYPICAL LOOP DI/DO
September 2005
Petrofac
Total Facilities Solutions SYSTEM ENGG. ACTIVITIES
• INQUIRY SPECIFICATION
• OFFER EVALUATIONS WITH TECHNICAL QUERIES
• TECHNICAL BID EVALUATION
• PURCHASE ORDER
• KICK OF MEETING
• DRAWING CHECKING
• PRE-FAT & FAT INSPECTIONS
• SIT :SYSTEM INTEGRATION TESTS
• DISPATCH
• SAT
• COMMISSIONING
September 2005
Petrofac
Total Facilities Solutions DOCUMENTATION
September 2005
Petrofac
Total Facilities Solutions DOCUMENT. (CONTD)
September 2005
Petrofac
Total Facilities Solutions DOCUMENT. (CONTD)
• DOCUMENT SCHEDULE
• MONTHLY/WEEKLY PROGRESS REPORTS
• PROJECT QUALITY PLAN & INSPECTION TEST PLANS
• FDS:FUNCTIONAL DESIGN SPECIFICATION
• SYSTEM ARCHITECTURE
• BILL OF MATERIAL
• CONTROL ROOM LAYOUT
• I/O NEST LOADING
September 2005
Petrofac
Total Facilities Solutions DOCUMENT. (CONTD)
September 2005
Petrofac
Total Facilities Solutions DOCUMENT. (CONTD)
September 2005
Petrofac
SAFEGUARDING
Total Facilities Solutions SYSTEMS ESD (IPS)
FEATURES
• TUV –GERMANY : CERTIFIED
• FUNCTIONAL SAFETY CLASSIFICATION AS PER
IEC-61508
• SYSTEM CYCLE TIME : TYPICAL 300ms FOR ESD.
September 2005
Petrofac
SAFEGUARDING SYSTEMS
Total Facilities Solutions
September 2005
Petrofac
SAFEGUARDING SYSTEMS
Total Facilities Solutions
HARDWARE
• SAME DCS HARDWARE, AND SOME
ADDITIONAL HARDWARE ARE ALSO REQUIRED:
• ESD CONSOLE.
September 2005
Petrofac
Total Facilities SolutionsFIRE & GAS SYSTEMS FGS
September 2005
Petrofac
FUNCTIONAL REQUIREMENTS OF FGS
Total Facilities Solutions
September 2005
Petrofac
DESIGN CONSIDERATIONS DETECTOR SYSTEM
Total Facilities Solutions
September 2005
Petrofac
Total Facilities Solutions
FGS SYSTEM
September 2005
Petrofac
Total Facilities Solutions FGS HARDWARE
HARDWARE
• SAME DCS HARDWARE, AND SOME
ADDITIONAL HARDWARE ARE ALSO REQUIRED:
• FGS CONSOLE.
September 2005
Petrofac