Professional Documents
Culture Documents
12 - Mine-Geotechnical - Slope Stabilization PDF
12 - Mine-Geotechnical - Slope Stabilization PDF
SLOPE STABILIZATION
SUPANDI, ST, MT
supandisttnas@gmail.com
GEOTEKNIK TAMBANG
Jurusan : Teknik Geologi
Prodi : Teknik Pertambangan Strata 1.
Kode : AS7446P
Mata Kuliah : Geoteknik Tambang
SKS : 2 SKS
Semester : VII
Waktu Perkuliahan : 2 x 50 menit
Dosen Pengampu : Supandi – ST. MT
Sistem Perkuliahan :
Penilaian : a. Tugas, presentasi dan Diskusi, Quiz, 20%
b. Ujian Tengah Semester (UTS) 30%
c. Ujian akhir semester (UAS) 50%
Range Nilai : 0-20,9 = E ; 21-44 = D ; 45-60.9 = C ; 61 –
80 = B ; 81 – 100 = A
Contact Person : supandisttnas@gmail.com
STTNAS Yogyakarta Slide 2
2011 26/12/2011
GEOTEKNIK TAMBANG
Textbook
1. John Read and Peter Stacey, 2009, Guidelines fr Open Pit
Slope Design, CRC Press.
2. William A Hustrulid, Michael K.McCarter and Dirk J.A Van Zyl,
2000, Slope Stability in Surface Mining, Society for Mining
Mettalurgy and Exploration Inc.
3. Ducan C Wyllie & Christopher W Mah, 2007-4th Edition, Rock
Slope Engineering, Spon Press.
4. Charles A Kliche, 1999, Rock Slope Stability, Society for
Mining Mettalurgy and Exploration Inc.
5. E. Hoek & J.W Bray, 1994, Rock Slope Engineering, Institute
of Mining and Metalurgy.
6. Roy E. Hunt, 2007, Geotechnical Investigation Methods,
CRC Press.
7. Roy E Hunt, 2007, Geologic Hazards, CRC Press.
STTNAS Yogyakarta Slide 3
2011 26/12/2011
Suatu lereng akan longsor bila keseimbangan gaya-gaya yang
bekerja terganggu, yaitu gaya pendorong melampaui gaya
penahan. Oleh karena itu prinsip penanggulangan longsoran
adalah mengurangi gaya pendorong atau menambah gaya
penahan.