You are on page 1of 6

index

TUNNEL MONITORING
Instrumentation for measuring and monitoring
geotechnical and geomechanical parameters in tunnels,
caverns and underground works.
SISGEO design and manufacture a comprehensive range of
equipment to suit specific applications and engineering requirements.
SISGEO will be pleased to assist and provide further information to select equipment.
Instrumentation
33
Application
1 Concrete stress cell
Measurement of concrete
stress changes

3 Measuring anchor
4
3 Stress distribution of anchors

4 Pressure cell
14 Measurements of rock
1 pressure on lining
7
5 Convergence tape extensometer
1 Movements of tunnel lining

5 6 Increx mobile extensometer


4 6
Strains and deformations
14 around tunnel

7 Anchor load cell


4
Monitoring of anchor loads
1
8 Piezo-settlement column
Water level and settlement control

14 Smach accelerograph
8 Vibration monitoring during
excavation

Instrumentation
Application
2
2 Borehole extensometer
Rock movements around tunnel

4 Pressure cell
Pressure measurement
in tunnel linings

5 Convergence tape extensometer


Movements of tunnel lining 4 14 9 2
6 Increx mobile extensometer 7
Strains and deformations
around tunnel 10 9
7 Anchor load cell
Monitoring of anchor loads 55 44
14
9 Embedment strain-gauge
Concrete strain measurements
(shotcrete) 4
9
10 Electrical piezometer
Control of pore-water pressure
10
14 Smach accelerograph
Vibration measurement during
excavation 6
TUNNEL MONITORING INSTRUMENTATION

Well-planned Monitoring Program Planning a performance monitoring programme


Developing Stage in an essential component of succesfull tunnel
Determine the purpose of instrumentation construction. Tunnel monitoring is reccomended to
Select the parameters to monitor determine the behaviour of the surrounding soil
Define factors which influence measurements during excavation, to ensure the stability and the
Prepare budget
safety of the structure.
Select instruments and their locations
Prepare specifications and instrument procurements
Plan instrument installation and maintenance
Plan data management and reporting
Criteria of instrument selection:
Execution Stage Reliability of measurements
Procure and install instruments
Maintain instruments and readouts
(resolution,accuracy and repeatability)
Collect measurements and manage data Long-term stability and instrument longevity
Compare data with design values Easy of automation for real time monitoring
Interpret data
Plan a corrective instrument implementation
Efficient data management

Convergence tape extensometer Concrete hydraulic stress cells Borehole extensometer

Electrical piezometers Anchor load cells Vibrating wire strain-gauges

Pressure cells Inclinometer probe and readout Smach strong motion accelerograph
Starin-gauges on steel lining

Pressure cell and convergence bolt

D422M level gauge

Instrumentation
Application
12 Borehole extensometer
2
Rock movements
14 around tunnel

5 Convergence tape extensometer


Movements of tunnel lining

6 Increx mobile extensometer


11
11 Strains and deformations
around tunnel
14
8 Piezo-settlement column
Water level and settlement
control
88 Settlement system
11
2 Monitoring of ground
settlement
13 6
12 Surface clinometer
22 Structural inclination
movement

13 Settlement column
6 Soil settlement above tunnel

14 Smach accelerograph
5 55
Dynamic measurements
during excavation
AUTOMATIC MONITORING SYSTEM

The performance offered by the Automatic Data Acquisition System is:


On-line management of a network of several hundred instruments
Collection of a large quantity of data
Checking of the design hypotheses
Operating support during the tunnel construction
Data analysis and evaluation of the tunnel safety

REMOTE DATA CENTER


off-line monitoring

PERSONAL
COMPUTER
Data Management Software

PHONE RECORDING
PLOTTER
MODEM CARTDRIDGE

Data Bank
Special processing
Data validation
Graph presentation

ADK-10 DATALOGGER MONITORING


Operating Software SYSTEM

Data acquisition

PERSONAL Self diagnosis


COMPUTER Processing on-line
Data Management Software Data recording
Alarms
PHONE PRINTER
MODEM PLOTTER
Display
Printing

Sisgeos ADK-10 is a powerful and versatile multi


function datalogger which allows to manage a
large instrument network.
index

Via Morandi, 27
20090 Segrate - MI - Italy
Tel. +39 02 2132728
Fax +39 02 26923252
E-mail: info@sisgeo.com
http://www.sisgeo.com

PROJECT REFERENCE

TORINO - BARDONECCHIA Motorway - Italy PORT FOUAD PROJECT - Egypth


MOTTARONE Motorway Tunnel - Italy MATEFER Railway Tunnel - Italy
CELS Motorway Tunnel - Italy Highway Zagreb - Rejka - Gorsky Kotar Tunnel - Croazia
TUNN - REV. 06 - 06/99

M.T.R. - Metro Naples - Italy UNDERGROUND RAILWAYS CROSSING of Genova - Italy


VILLETTA - Motorway Tunnel - Italy KARUN III - Diversion Tunnel - Iran
TORINO - SAVONA Motorway - Italy O.S.E. Railway Tunnel Ano Liossia - Greece
ELMALIK Motorway Tunnel - Turkey TEMBI RAILWAY TUNNEL - Greece
GILO - Motorway Tunnel - Israel T.A.V. MILANO - GENOVA - Italy
AOSTA - S. BERNARDO Motorway - Italy UNDERGROUND RAILWAYS Seoul - Korea
EL SALAAM SYPHON UNDER SUEZ CANAL - Egypth ANCONA - BARI - S. Vito Railways Tunnel - Italy
S. CROCE Railway Tunnel - Italy S. PELLEGRINO TERME - Motorway Tunnel - Italy
FREJUS Motorway Tunnel - Italy GIUSTINO - Hydraulic Reservoir - Italy
M.R.T. - Metro Rome - Italy PETRALIA - Underground mine - Italy
TAIPEI M.R.T. - Taiwan CASECNAN PROJECT - Philippine
UNDERGROUND PARKING in Milan - Italy REALMONTE - Underground mine - Italy
COZZO della GUARDIA Hydraulic Reservoir - Italy KALI GANDAKI H.P. - Nepal
PORCE II HYDROELECTRIC PROJECT - Colombia MRTA BANGKOK - Thailand
T.A.V. Rome-Naples - Colli Albani Railways tunnel - Italy CONTUY MEDIO - Venezuela

You might also like