PEMBERI TUGAS KONSULTAN PENGAWAS KONTRAKTOR

REKAPITULASI MATERIAL SITE ACCEPTANCE TERMIJN 10% (Minggu Ke-1 s/d Minggu Ke-30)

Pekerjaan : Perluasan Apron dan Taxiway Berikut Fasilitas Penunjangnya


Lokasi : Bandar Udara Nasional Juanda-Surabaya
Pemberi Tugas : PT.Angkasa Pura 1 Internasional Juanda Surabaya
Konsultan Pengawas : PT. Brantas Abipraya
Kontraktor : PT.Brantas Abipraya

Minggu Kumulatif Volume


No Nama Material Satuan Volume Deviasi
Ke- Mingguan Termijn 10%

1 Cerucuk Gelam btg 14 3,908.00 2,000.00


15 5,438.00 7,438.00
16 5,673.00 13,111.00
19 3,059.00 16,170.00
20 10,327.00 26,497.00
21 5,118.00 31,615.00
22 13,283.00 44,898.00
23 15,900.00 60,798.00
24 27,228.00 88,026.00
25 40,100.00 128,126.00
26 33,330.00 161,456.00
27 17,559.00 179,015.00
28 6,250.00 185,265.00
29 12,900.00 198,165.00
30 5,871.00 204,036.00 163,364.00 40,672.00

2 Sirtu m³ 22 708.05 708.05


23 1,378.39 2,086.44
24 248.70 2,335.14
25 1,643.85 3,978.99
26 4,806.27 8,785.26
27 10,106.23 18,891.49
28 16,944.96 35,836.45
29 4,563.08 40,399.53
30 983.94 41,383.47 23,086.16 18,297.31

3 LPA m³ 27 1,758.96 1,758.96


28 2,807.79 4,566.75
29 1,155.38 5,722.13
30 4,473.37 10,195.50 4,254.25 5,941.25

4 Geotextile m² 15 22,800.00 22,800.00


26 22,800.00 45,600.00
28 2,280.00 47,880.00
PEMBERI TUGAS KONSULTAN PENGAWAS KONTRAKTOR

REKAPITULASI MATERIAL SITE ACCEPTANCE TERMIJN 10% (Minggu Ke-1 s/d Minggu Ke-30)

Pekerjaan : Perluasan Apron dan Taxiway Berikut Fasilitas Penunjangnya


Lokasi : Bandar Udara Nasional Juanda-Surabaya
Pemberi Tugas : PT.Angkasa Pura 1 Internasional Juanda Surabaya
Konsultan Pengawas : PT. Brantas Abipraya
Kontraktor : PT.Brantas Abipraya

Minggu Kumulatif Volume


No Nama Material Satuan Volume Deviasi
Ke- Mingguan Termijn 10%

29 3,420.00 51,300.00 42,662.90 8,637.10

5 CTB m³ 29 165.71 165.71


30 1,598.09 1,763.79 1,467.08 296.71

6 PANCANG 40.A2.M.13.7,1 B m¹ 29 442.00 442.00


PANCANG 40.A2.U.09.7,1 B m¹ 29 414.00 856.00
PANCANG 40.A2.B.08.7,1 B m¹ 29 448.00 1,304.00 120.00 1,184.00

7 Besi Beton D10 (Polos) Kg 29 18,167.00 18,167.00 -

8 Besi Beton D16 (Ulir) Kg 29 9,991.92 9,991.92 -

9 Besi Beton D25 (Ulir) Kg 29 6,791.40 6,791.40 -

Besi Beton Dowel Ø32 (Polos)


10 Kg 30 47,703.60 47,703.60 -
P=50Cm
PEMBERI TUGAS KONSULTAN PENGAWAS KONTRAKTOR

REKAPITULASI MATERIAL SITE ACCEPTANCE TERMIJN 10% (Minggu Ke-31 s/d Minggu Ke-38)

Pekerjaan : Perluasan Apron dan Taxiway Berikut Fasilitas Penunjangnya


Lokasi : Bandar Udara Nasional Juanda-Surabaya
Pemberi Tugas : PT.Angkasa Pura 1 Internasional Juanda Surabaya
Konsultan Pengawas : PT. Brantas Abipraya
Kontraktor : PT.Brantas Abipraya

Minggu Kumulatif Volume


No Nama Material Satuan Volume Deviasi
Ke- Mingguan Termijn 30%

1 Cerucuk Gelam btg 31 2,363.00 206,399.00


32 5,099.00 211,498.00 183,988.00 27,510.00

2 Sirtu m³ 31 991.77 42,375.24


32 1,150.42 43,525.66 27,129.38 16,396.28

3 LPA m³ 31 4,473.37 14,668.87


32 50.16 14,719.03
35 924.94 15,643.97 9720.206 5,923.76

4 Geotextile m² 32 2,280.00 53,580.00


36 6,270.00 59,850.00 49,309.01 10,540.99

5 CTB m³ 31 2,048.50 3,812.29


32 875.29 4,687.58
34 513.76 5,201.34
35 2,234.83 7,436.18
37 157.86 7,594.04
38 921.45 8,515.49 7,310.90 1,204.59

6 PANCANG 40.A2.M.13.7,1 B m¹ 32 265.00 1,569.00


35 585.00 2,154.00
PANCANG 40.A2.U.09.7,1 B m¹ 32 324.00 2,478.00
35 522.00 3,000.00
PANCANG 40.A2.B.08.7,1 B m¹ 32 448.00 3,448.00
35 224.00 3,672.00 3,072.00 600.00

7 Besi Beton D10 (Polos) Kg 32 350.00 18,517.00


37 2,403.00 20,920.00 10,439.70 10,480.30

8 Besi Beton D16 (Ulir) Kg 32 175.00 10,166.92


37 801.00 10,967.92 -

9 Besi Beton D25 (Ulir) Kg 32 45.00 6,836.40


Minggu Kumulatif Volume
No Nama Material Satuan Volume Deviasi
Ke- Mingguan Termijn 30%

37 52.00 6,888.40 2,132.90 4,755.50

Besi Beton Dowel Ø32 (Polos)


10 Kg 32 5,000.00 52,703.60
P=50Cm

37 6,076.00 58,779.60 33,058.09 25,721.51

11 Wire Mesh UM SNI 7 (Ulir) Lbr 35 4,876.20 4,876.20

36 2,438.10 7,314.30
37 14,571.90 21,886.20 11,580.16 10,306.04

12 U-Ditch Bh 32 24.00 24.00


35 140.40 164.40
36 132.00 296.40
37 188.40 484.80
38 30.00 514.80 -

13 Cover U-Ditch Bh 36 120.00 120.00


37 450.00 570.00
38 148.00 718.00 -

14 Box Culvert Bh 35 196.80 196.80


36 163.20 360.00
37 100.80 460.80
38 316.80 777.60 192 585.60

Varia Usaha Beton K-500 (K-


15
350) m³ 37 213.00 213.00

38 197.50 410.50 262.40 148.10

16 Varia Usaha Beton K-100 m³ 36 86.00 86.00

37 159.00 245.00
38 18.00 263.00
17 Holcim K-100 m³ 36 4.00 4.00
37 17.50 21.50
38 147.50 169.00
Total 432.00

Varia Usaha Beton K-400 (Fs-


18
46) m³ 32 60.00 60.00

36 669.50 729.50
37 1,075.00 1,804.50
38 925.50 2,730.00

19 Holcim K-400 (Fs-46) m³ 34 10.00 10.00

35 1,058.50 1,068.50
Minggu Kumulatif Volume
No Nama Material Satuan Volume Deviasi
Ke- Mingguan Termijn 30%

36 788.00 1,856.50
37 952.50 2,809.00
38 1,141.00 3,950.00

20 Adhimik K-400 (Fs-46) m³ 38 20.50 20.50

Total 6,700.50 5,016.38 1,684.13