You are on page 1of 1

TABEL PEMBACAAN SONDIR (DCPT TABLE)

PROJECT : PERENCANAAN PEMBANGUNAN GEDUNG SATPAS DATE : FEBRUARY 7th 2022

DAN GEDUNG BPKB POLRES BULUKUMBA POINT : S-02

LOCATION : KAB. BULUKUMBA TESTED BY : FAISAL, S.T.


COORDINATE : E = 189414.653 N = 9388739.885 CHECKED BY : Ir. BUDI PERMANA, S.T.

Hambatan Jumlah Hambatan Unit Hambatan Nilai Total Hambatan Hambatan

Kedalaman Konis Hambatan Pelekat Pelekat fs Pelekat Rasio

qc qc+f f fs tiap 20 cm Tf Fr=fs/qc

(m) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm') (kg/cm')

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00


0.2 15.0 45.0 30.0 3.00 60.00 40.11 13.37
0.4 30.0 70.0 40.0 4.00 80.00 93.60 8.91
0.6 80.0 125.0 45.0 4.50 90.00 153.76 3.76
0.8 85.0 135.0 50.0 5.00 100.00 220.62 3.93
1.0 150.0 200.0 50.0 5.00 100.00 287.47 2.23
1.2 205.0 255.0 50.0 5.00 100.00 354.33 1.63

You might also like