TABEL PEMBACAAN SONDIR (DCPT TABLE)

PROJECT : PERENCANAAN PEMBANGUNAN GEDUNG SATPAS DATE : FEBRUARY 7th 2022

DAN GEDUNG BPKB POLRES BULUKUMBA POINT : S-01

LOCATION : KAB. BULUKUMBA TESTED BY : FAISAL, S.T.


COORDINATE : E = 189454.126 N = 9388780.699 CHECKED BY : Ir. BUDI PERMANA, S.T.

Hambatan Jumlah Hambatan Unit Hambatan Nilai Total Hambatan Hambatan

Kedalaman Konis Hambatan Pelekat Pelekat fs Pelekat Rasio

qc qc+f f fs tiap 20 cm Tf Fr=fs/qc

(m) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm') (kg/cm')

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00


0.2 10.0 30.0 20.0 2.00 40.00 26.74 13.37
0.4 25.0 60.0 35.0 3.50 70.00 73.54 9.36
0.6 80.0 110.0 30.0 3.00 60.00 113.65 2.51
0.8 100.0 145.0 45.0 4.50 90.00 173.82 3.01
1.0 210.0 250.0 40.0 4.00 80.00 227.30 1.27