Schedule of Footings Schedule of Slab: S-2 6 5 Typical Detail 1-Way Slab
Schedule of Footings Schedule of Slab: S-2 6 5 Typical Detail 1-Way Slab
( D) DEPTH OF
SCHEDULE OF SLAB SIZES
THICKNESS EXCAVATION
FROM NATURAL
DESIGNATION: (LxW) T1 T2 GRADE LINE REBARS REQ'D.
REBARS ALONG SHORT SPAN REBARS ALONG LONG SPAN
TWO-WAY
MM
TOP BARS (SP1) TOP BARS (SP2) F1 1600MM x 1600MM 300 MM - 1200MM
(see section detail) B.W.
21 SETS
(SP1) BOTTOM BARS (SP2) BOTTOM BARS
B1 B2 B1
S-1 125 @ 100 MM O.C. @ 100 MM O.C. @ 100 MM O.C. @ 100 MM O.C.
F2 900MM x 900MM 200 MM - 1200MM 2 SETS
(see section detail) B.W.
A C3a
C1a C1a C1a
A
RB-1 RB-1 RB-1
S1
RB-1
RB-1
RB-1
RB-1
F3
B1
B1
B1
B2 S1 S1 1000MM x 1000MM 250 MM 1200MM
B1
- 7 SETS
(see section detail)
B3
STAIR WELL
B
STAIR WELL
C3a C1a
C1a C1a
B
B2 B1 RB-1 RB-1
F4 900MM x 900MM 200 MM - 1200MM 2 SETS
B2
S1 B.W.
B3 C2a (see section detail)
C C
RB-1
RB-1
RB-1
RB-1
B1
B1
B1
S1 S1
B1
RB-1
RB-1
S1
B3
RB-1
D C3a D
B1 C1a B2 C1a B1 C1a B3 C2a RB-1 RB-1 RB-1 SCHEDULE OF BEAMS
NUMBER OF REBARS
DETAIL OF COLUMNS
RB-1
RB-1
RB-1
RB-1
B1
B1
B1
F F
RB-1
RB-1
RB-1
RB-1
B1
B1
B1
B3 RB-1
PC1
RB-1
G S1 G SPACING:
B3
C3 TIES:
B2 C1a B2 C1a B1 C1a RB-1 RB-1 RB-1 5 @ 50 MM.,
RB-1
RB-1
RB-1
RB-1
S1 S1 S1
B1
B1
B1
H
B1
H
B3 C2a RB-1
PC1 SPACING:
I C3 C1a I 5 @ 50 MM.,
B2 C1a B2 C1a B1 RB-1 RB-1 RB-1 TIES:
5 @ 50MM;
C3 5 @ 100 MM., 7 SETS
B3
RB-1
RB-1
RB-1
RB-1
B1
B1
B1
S1 S1 S1
B1
SPACING:
PC1 5 @ 50 MM.,
J C3
B2 B2 B1
J
RB-1 RB-1 RB-1
C1a 5 @ 100 MM.,
21 SETS
SPACING:
5 @ 50 MM.,
C2a 5 @ 100 MM., 4 SETS
S-2 2ND FLOOR FRAMING PLAN S-2 ROOF BEAM LAYOUT TIES:
5 @ 50MM;
1 6 2 6 B-2 250 350 REST @ 100MM O.C.
SPACING:
5 @ 50 MM.,
C3a 5 @ 100 MM.,
3 SETS
TIES:
5 @ 50MM;
B-3 250 350
REST @ 100MM O.C.
@ 150 mm
DEPTH
NO.OF MID BARS IF ANY NO.OF MID BARS IF ANY
@ SUPPORT @ MISPAN
L/4 L/4
L/4 L/4