W= 6.13 kg/m fu = 3700 kg/cm = 370 Mpa
Ix = 238 cm4 fy = 2400 kg/cm2 = 240 Mpa
4
Iy = 33.5 cm E= 210000 Mpa
------------------------------------------------------------------------------------------------------------------------------------------------------------
Page 17 of 22 Rev.0
ANALISA STRUKTUR BAJA TEMPORARY OFFICE 16.5 M
Design Load
a). Dead Load
Selfweight (Purlin) = 6.13 kg/m
Roof Weight = 18 kg/m +
Total Weight = 24.13 kg/m
Additional Weight 10 % = 2.413 kg/m
qD = 26.54 kg/m
b). Live Load
Uniform Live Load = (40 - 0.8 a) = = 20kg/m2
qL = gording horizontal distance x q = -23.76 kg/m
Concentrated Live Load, PL = 100 kg
c). Wind Load
Wind Windward Pressure = 13.61 kg/m2
Wind Windward Pressure = 16.34 kg/m
Wind Leeward Pressure = 8.509 kg/m2
Wind Leeward Pressure = 10.21 kg/m
Dead Load + Live Load > Wind Windward Pressure :
26.54 + -23.76 kg/m > 16.34 kg/m
Wind Load Pressure
need calculated ==> qw = 0 kg/m
Calculation of load moment due to the x-axis and y-axis
Dead Load
2
MXD = 1/8 (qD x cosa) L = 0.125 x 26.543 x 0.999 x 25 = 82.83 kg.m
2
MYD = 1/8(qDxsina) x L/2 = 0.125 x 26.543 x 0.052 x 6.25 = 4.341 kg.m
Uniform Live Load
MXLD = 1/8 (qL x cosa) L2 = 0.125 x -23.76 x 0.999 x 25 = -74.15 kg.m
MYL = 1/8(qLxsina) x L/22 = 0.125 x -23.76 x 0.052 x 6.25 = -3.886 kg.m
Concentrated Live Load
MXL = 1/4 (qL x cosa) L = 0.25 x 100 x 0.999 x 5 = 124.8 kg.m
MYL = 1/4(qL x sina)(L/3) = 0.25 x 100 x 0.052 x 2.89 = 2.181 kg.m
Uniform Wind Load
MXW = 1/8 x qw x L = 0.125 x 0 x 5 = 0 kg.m
Moment Resistance ( Mu = 1.2 MD + 1.6 ML + 0.8 MW )
Mu (Uniform Dead Load, Live Load and Wind Load)
X axis Y axis
MD = 82.83 kg.m MD = 4.341 kg.m
ML = -74.15 kg.m ML = -3.886 kg.m
Mw = 0 kg.m
------------------------------------------------------------------------------------------------------------------------------------------------------------
Page 18 of 22 Rev.0
ANALISA STRUKTUR BAJA TEMPORARY OFFICE 16.5 M
------------------------------------------------------------------------------------------------------------------------------------------------------------
Page 19 of 22 Rev.0
ANALISA STRUKTUR BAJA TEMPORARY OFFICE 16.5 M
2 2 2 2
δtot = δx + δy = (δx1 + δx2 + δx3) + (δy1 + δy2 + δy3)
------------------------------------------------------------------------------------------------------------------------------------------------------------