LOADING CALCULATION

A. Dead load (DL)

A.1 Roof Load


Roofing load+Insulation+Metal ceiling = 12.00 kg/m2
12.00 kg/m2 ….(as requested)

Span of purlin = 1.20 m


Join load - full span for SAP 2000 (roof load) = 14.40 kg/m

A.2 Elektrical load


Elektrikal /m² = 3.00 kg/m²

Span of purlin = 1.20 m


Join load - full span for SAP 2000 (roof load) = 3.60 kg/m

B. Live Load (LL)

B.1 Rain load


Rain load α = 36 ° = 20 kg/m2

Span of purlin = 1.20 m


Join load - full span for SAP 2000 (rain load) = 24.00 kg/m

B.2 Roof live load


Roof live load = 100.00 kg

Join load - full span for SAP 2000 (worker load) = 100.00 kg

C. Wind Load (WL)

Basic wind speed ( V ) = 120.00 kph


= 33.33 m/dtk

P = V2 / 16 …..(PPIUG 1983)
= 69.44 kg/m2

Section Cp
1/2 (windward) 0.50
1/2 (leeward) -0.52

α = 36.00
Span of purlin = 1.20 m

Join load - full span (wind load - windward) = 42.00 kg


Join load - full span (wind load - leeward) = -44.00 kg