You are on page 1of 2

REF. NO.

INSPECTION & TEST PLAN REV. NO. 00


DATE :
PAGE : 1 OF 2

ACTIVITY: DESIGN, INSTALLATION, TESTTING & COMMISSIONING OF CLEAN AGENT FIRE SUPPRESSION SYSTEM

Area/Location:

ITP approved by Unisafe QA/QC: ITP approved by Client:


Signature: Signature:
Date: Date:
SPECIFICATION INSPECTION LEVEL VERIFICATION
SERIAL NO. DESCRIPTION FREQUENCY
/ CRITERIA ITL UNISAFE CLIENT RECORD

1 DOCUMENTATION

Once (Approval
1.1 Material Approval prior to start of Specifications.
activity)

Shop Drawing Each Shop Specifications and


1.2
Approval Drawing submittals.

Once (Approval
Method Statement Specifications and
1.3 prior to start of
Approval submittals.
activity)
MATERIAL
2
INSPECTION

Check the Material


Specifications and
2.1 as per approved Each Delivery
submittal. submittals.

INSTALLATION
3
INSPECTION

Check the
installation as per
Area Wise or As
approved drawing. Specifications and
3.1 instructed by
Check the physical submittals.
Client
Installation of
equipment.

TESTING & As instructed by Specifications and


4
COMMISSIONING Client submittals.

LEGEND: H: HOLD W: WITNESS S: SURVEILLANCE R: REVIEW


ITL: Urgency Level : 1 – Normal Duration, 2 – Critical, 3 - Urgent

ITP Sign-Off Post completion of Works

Inspection Date Unisafe QA/QC: Client APPROVAL

NAME : NAME :

SIGN : SIGN :

DATE: DATE: