You are on page 1of 11

ESTIMATED QUANTITY FABRICATION DELIVERY DRIVING CUTTING

AS OF AS OF AS OF AS OF
ITEM LENGTH QTY POS PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL
10/04/18 10/04/18 10/04/18 10/04/18

PHASE 1
15M BOTTOM 28 26 0 26 2 25 0 25 3
28 25 0 25 3 24 0 24 4
25M TOP 28 25 0 25 3 18 0 18 10
1. TEST PILE
Balance 3 positions
will be considered as 3 - - - - - - - -
regular pile as per 3 - - - - - - - -
instruction of
constech.
3 - - - - - - - -

11M SINGLE 411 411 411 0 411 0 387 2 389 22 317 17 334 77 312 312 99

10M SINGLE 165 165 177 0 174 0 157 19 176 -11 135 2 137 28 140 140 25

14M SINGLE 12 12 0 0 0 12 0 0 0 12 0 0 0 12 0 0 0 12

6M SINGLE 48 48 49 0 49 0 35 13 48 0 32 16 48 0 32 32 16

8M SINGLE 21 21 21 0 21 0 11 9 20 1 0 8 8 13 0 0 0 21

9M SINGLE 97 97 4 88 92 5 0 0 0 97 0 0 0 97 0 0 0 97

2. REGULAR
9M Bot. 123 53 70 123 0 0 0 0 123
PILE
123 0 0 0 123 0 0 0 123
10M Top 123 63 60 123 0 0 0 0 123

10M Bot. 254 50 0 50 204 1 22 23 231


254 0 7 7 247 0 0 7 247
12M Top 254 50 0 50 204 0 12 12 242

10M Bot. 42 0 0 0 42 0 0 0 42
42 0 0 0 42 0 0 0 42
10M Top 42 0 0 0 42 0 0 0 42

FOR CMGI S.I. 188 188 0 0 0 188 0 0 0 188 0 0 0 188 0 0 0 188

1,830 1,386 929 218 1,144 702 634 77 711 1,125 509 50 559 830 508 0 515 874
ESTIMATED QUANTITY FABRICATION DELIVERY DRIVING CUTTING
AS OF AS OF AS OF AS OF
ITEM LENGTH QTY POS PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL
9/27/18 9/27/18 9/27/18 9/27/18

PHASE 1
15M BOTTOM 28 28 0 28 0 25 0 25 3
28 25 0 25 3 24 0 24 4
25M TOP 28 28 0 28 0 18 0 18 10
1. TEST PILE
Balance 3 positions
will be considered as 3 - - - - - - - -
regular pile as per 3 - - - - - - - -
instruction of
constech.
3 - - - - - - - -

11M SINGLE 403 403 411 0 411 0 369 18 387 24 296 21 317 86 296 21 317 86

10M SINGLE 173 173 174 0 174 0 136 21 157 16 135 0 135 38 135 0 135 38

8M SINGLE 21 21 21 0 21 0 0 11 11 10 0 0 0 21 0 0 0 21

6M SINGLE 48 48 49 0 49 0 24 11 35 13 0 32 32 16 0 15 15 33

10M Bot. 254 28 22 50 204 0 1 1 253


254 0 0 0 254 0 0 0 254
12M Top 254 27 23 50 204 0 0 0 254

2. REGULAR
9M Bot. 123 0 53 53 70 0 0 0 123
PILE
123 0 0 0 123 0 0 0 123
10M Top 123 0 63 63 60 0 0 0 123

9M SINGLE 97 97 4 0 4 93 0 0 0 97 0 0 0 97 0 0 0 97

14M SINGLE 12 12 0 0 0 12 0 0 0 12 0 0 0 12 0 0 0 12

10M Bot. 42 0 0 0 42 0 0 0 42
42 0 0 0 42 0 0 0 42
10M Top 42 0 0 0 42 0 0 0 42

FOR CMGI S.I. 188 188 0 0 0 188 0 0 0 188 0 0 0 188 0 0 0 188

1,830 1,386 770 161 931 915 572 62 634 1,210 456 53 509 880 455 36 491 898
ESTIMATED QUANTITY FABRICATION DELIVERY DRIVING CUTTING
AS OF AS OF AS OF AS OF
ITEM LENGTH QTY POS PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL
9/20/18 9/20/18 9/20/18 9/20/18

PHASE 1
15M BOTTOM 28 28 0 28 0 25 0 25 3
28 25 0 25 3 24 0 24 4
25M TOP 28 28 0 28 0 18 0 18 10
1. TEST PILE
Balance 3 positions
will be considered as 3 - - - - - - - -
regular pile as per 3 - - - - - - - -
instruction of
constech.
3 - - - - - - - -

11M SINGLE 403 403 403 0 403 0 320 49 369 34 271 20 291 112 271 20 291 112

10M SINGLE 173 173 132 47 179 -6 130 6 136 37 102 38 140 33 102 38 140 33

14M SINGLE 12 12 0 0 0 12 0 0 0 12 0 0 0 12 0 0 0 12

6M SINGLE 48 48 0 48 48 0 0 24 24 24 0 0 0 48 0 0 0 48

8M SINGLE 21 21 0 21 21 0 0 0 0 21 0 0 0 21 0 0 0 21

9M SINGLE 97 97 0 4 4 93 0 0 0 97 0 0 0 97 0 0 0 97

2. REGULAR
9M Bot. 123 0 0 0 123 0 0 0 123
PILE
123 0 0 0 123 0 0 0 123
10M Top 123 0 0 0 123 0 0 0 123

10M Bot. 254 0 28 28 226 0 0 0 254


254 0 0 0 254 0 0 0 254
12M Top 254 0 27 27 227 0 0 0 254

10M Bot. 42 0 0 0 42 0 0 0 42
42 0 0 0 42 0 0 0 42
10M Top 42 0 0 0 42 0 0 0 42

FOR CMGI S.I. 188 188 0 0 0 188 0 0 0 188 0 0 0 188 0 0 0 188

1,830 1,386 591 175 766 1,070 493 79 572 1,264 398 58 456 933 397 58 455 934
ESTIMATED QUANTITY FABRICATION DELIVERY DRIVING CUTTING
AS OF AS OF AS OF AS OF
ITEM LENGTH QTY POS PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL
9/20/18 9/20/18 9/20/18 9/20/18

PHASE 1
15M BOTTOM 28 28 0 28 0 25 0 25 3
28 25 0 25 3 24 0 24 4
25M TOP 28 28 0 28 0 18 0 18 10
1. TEST PILE
Balance 3 positions
will be considered as 3 - - - - - - - -
regular pile as per 3 - - - - - - - -
instruction of
constech.
3 - - - - - - - -

11M SINGLE 403 403 403 0 403 0 278 42 320 83 267 4 271 132 267 4 271 132

10M SINGLE 173 173 132 0 132 41 93 37 130 43 70 32 102 71 70 32 102 71

14M SINGLE 12 12 0 0 0 12 0 0 0 12 0 0 0 12 0 0 0 12

6M SINGLE 48 48 0 0 0 48 0 0 0 48 0 0 0 48 0 0 0 48

8M SINGLE 21 21 0 0 0 21 0 0 0 21 0 0 0 21 0 0 0 21

9M SINGLE 97 97 0 0 0 97 0 0 0 97 0 0 0 97 0 0 0 97

2. REGULAR
9M Bot. 123 0 0 0 123 0 0 0 123
PILE
123 0 0 0 123 0 0 0 123
10M Top 123 0 0 0 123 0 0 0 123

10M Bot. 254 0 0 0 254 0 0 0 254


254 0 0 0 254 0 0 0 254
12M Top 254 0 0 0 254 0 0 0 254

10M Bot. 42 0 0 0 42 0 0 0 42
42 0 0 0 42 0 0 0 42
10M Top 42 0 0 0 42 0 0 0 42

FOR CMGI S.I. 188 188 0 0 0 188 0 0 0 188 0 0 0 188 0 0 0 188

1,830 1,386 591 0 591 1,245 414 79 493 1,343 362 36 398 991 361 36 397 992
ESTIMATED QUANTITY FABRICATION DELIVERY DRIVING CUTTING
AS OF AS OF AS OF AS OF
ITEM LENGTH QTY POS PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL
9/6/18 9/6/18 9/6/18 9/6/18

PHASE 1
15M BOTTOM 28 28 0 28 0 25 0 25 3
28 25 0 25 3 24 0 24 4
25M TOP 28 28 0 28 0 18 0 18 10
1. TEST PILE
Balance 3 positions
will be considered as 3 - - - - - - - -
regular pile as per 3 - - - - - - - -
instruction of
constech.
3 - - - - - - - -

11M SINGLE 411 411 411 0 411 0 245 33 278 133 218 49 267 144 218 49 267 144

10M SINGLE 160 160 132 0 132 28 93 37 130 30 62 8 70 90 62 8 70 90

14M SINGLE 12 12 0 0 0 12 0 0 0 12 0 0 0 12 0 0 0 12

6M SINGLE 91 91 0 0 0 91 0 0 0 91 0 0 0 91 0 0 0 91

9M SINGLE 97 97 0 0 0 97 0 0 0 97 0 0 0 97 0 0 0 97

9M Bot. 123 0 0 0 123 0 0 0 123 0 0 0 123 0 0 0 123


2. REGULAR
123
PILE
10M Top 123 0 0 0 123 0 0 0 123 0 0 0 123 0 0 0 0

10M Bot. 254 0 0 0 254 0 0 0 254 0 0 0 254 0 0 0 254


254
12M Top 254 0 0 0 254 0 0 0 254 0 0 0 254 0 0 0 0

10M Bot. 42 0 0 0 42 0 0 0 42 0 0 0 42 0 0 0 42
42
10M Top 42 0 0 0 42 0 0 0 42 0 0 0 42 0 0 0 0

FOR CMGI S.I. 179 179 0 0 0 179 0 0 0 179 0 0 0 179 0 0 0 179

1,838 1,394 599 0 599 1,245 381 70 451 1,393 305 57 362 1,454 304 57 361 1,036
ESTIMATED QUANTITY FABRICATION DELIVERY DRIVING CUTTING
AS OF AS OF AS OF AS OF
ITEM LENGTH QTY POS PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL
8/30/18 8/30/18 8/30/18 8/30/18

PHASE 1
15M BOTTOM 28 28 0 28 0 25 0 25 3
28 25 0 25 3 24 0 24 4
25M TOP 28 28 0 28 0 18 0 18 10
1. TEST PILE
Balance 3 positions
will be considered as 3 - - - - - - - -
regular pile as per 3 - - - - - - - -
instruction of
constech.
3 - - - - - - - -

11M SINGLE 411 411 411 0 411 0 245 0 245 166 191 27 218 193 191 27 218 193

10M SINGLE 141 141 132 0 132 9 65 28 93 48 36 26 62 79 36 26 62 79

12M SINGLE 81 81 0 0 0 81 0 0 0 81 0 0 0 81 0 0 0 81

15M SINGLE 65 65 0 0 0 65 0 0 0 65 0 0 0 65 0 0 0 65

2. REGULAR
12M BOTTOM 408 0 0 0 408 0 0 0 408 0 0 0 408 0 0 0 408
PILE
408
13M TOP 408 0 0 0 408 0 0 0 408 0 0 0 408 0 0 0 0

12M BOTTOM 221 0 0 0 221 0 0 0 221 0 0 0 221 0 0 0 221


221
14M TOP 221 0 0 0 221 0 0 0 221 0 0 0 221 0 0 0 0

FOR S.I 50 50 0 0 0 50 0 0 0 50 0 0 0 50 0 0 0 50

2,056 1,402 599 0 599 1,463 353 28 381 1,681 252 53 305 1,729 251 53 304 1,101
ESTIMATED QUANTITY FABRICATION DELIVERY DRIVING CUTTING
AS OF AS OF AS OF AS OF
ITEM LENGTH QTY POS PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL
8/22/18 8/22/18 8/22/18 8/22/18

PHASE 1
15M BOTTOM 28 28 0 28 0 25 0 25 3
28 25 0 25 3 25 0 25 3
25M TOP 28 28 0 28 0 18 0 18 10
1. TEST PILE
Balance 3 positions
will be considered as 3 - - - - - - - -
regular pile as per 3 - - - - - - - -
instruction of
constech.
3 - - - - - - - -

11M SINGLE 411 411 411 0 411 0 245 0 245 166 173 18 191 220 173 18 191 220

10M SINGLE 141 141 132 0 132 9 16 49 65 76 13 23 36 105 13 23 36 105

12M SINGLE 81 81 0 0 0 81 0 0 0 81 0 0 0 81 0 0 0 81

15M SINGLE 65 65 0 0 0 65 0 0 0 65 0 0 0 65 0 0 0 65

2. REGULAR
12M BOTTOM 408 0 0 0 408 0 0 0 408 0 0 0 408 0 0 0 408
PILE
408
13M TOP 408 0 0 0 408 0 0 0 408 0 0 0 408 0 0 0 0

12M BOTTOM 221 0 0 0 221 0 0 0 221 0 0 0 221 0 0 0 221


221
14M TOP 221 0 0 0 221 0 0 0 221 0 0 0 221 0 0 0 0

FOR S.I 50 50 0 0 0 50 0 0 0 50 0 0 0 50 0 0 0 50

2,056 1,402 599 0 599 1,463 304 49 353 1,709 211 41 252 1,782 211 41 252 1,153
ESTIMATED QUANTITY FABRICATION DELIVERY DRIVING CUTTING
AS OF AS OF AS OF AS OF
ITEM LENGTH QTY POS PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL
8/9/18 8/9/18 8/9/18 8/9/18

PHASE 1
15M BOTTOM 28 28 0 28 0 25 0 25 3
28 25 0 25 3 25 0 25 3
25M TOP 28 28 0 28 0 18 0 18 10
1. TEST PILE
Balance 3 positions
will be considered as 3 - - - - - - - -
regular pile as per 3 - - - - - - - -
instruction of
constech.
3 - - - - - - - -

11M SINGLE 411 411 411 0 411 0 217 28 245 166 150 23 173 238 150 23 173 238

10M SINGLE 141 141 133 0 133 8 16 0 16 125 0 13 13 128 0 13 13 128

12M SINGLE 81 81 0 0 0 81 0 0 0 81 0 0 0 81 0 0 0 81

15M SINGLE 65 65 0 0 0 65 0 0 0 65 0 0 0 65 0 0 0 65

2. REGULAR
12M BOTTOM 408 0 0 0 408 0 0 0 408 0 0 0 408 0 0 0 408
PILE
408
13M TOP 408 0 0 0 408 0 0 0 408 0 0 0 408 0 0 0 0

12M BOTTOM 221 0 0 0 221 0 0 0 221 0 0 0 221 0 0 0 221


221
14M TOP 221 0 0 0 221 0 0 0 221 0 0 0 221 0 0 0 0

FOR S.I 50 50 0 0 0 50 0 0 0 50 0 0 0 50 0 0 0 50

2,056 1,402 600 0 600 1,462 276 28 304 1,758 175 36 211 1,823 175 36 211 1,194
ESTIMATED QUANTITY FABRICATION DELIVERY DRIVING CUTTING
AS OF AS OF AS OF AS OF
ITEM LENGTH QTY POS PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL
8/9/18 8/9/18 8/9/18 8/9/18

15M BOTTOM 28 28 0 28 0 25 0 25 3
1. TEST PILE 28 25 0 25 3 25 0 25 3
25M TOP 28 28 0 28 0 18 0 18 10

11M SINGLE 411 411 411 0 411 0 217 28 245 166 150 23 173 238 150 23 173 238

2. REGULAR
10M SINGLE 133 133 133 0 133 0 16 0 16 117 0 13 13 120 0 13 13 120
PILE
FOR
801 801
CONSTECH SI
1,401 1,373 600 0 600 0 276 28 304 296 175 36 211 361 175 36 211 361
ESTIMATED QUANTITY FABRICATION DELIVERY DRIVING CUTTING
AS OF AS OF AS OF AS OF
ITEM LENGTH QTY POS PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL
8/9/18 8/9/18 8/9/18 8/9/18

15M BOTTOM 28 28 0 28 0 25 0 25 3
1. TEST PILE 28 25 0 25 3 25 0 25 3
25M TOP 28 28 0 28 0 18 0 18 10

11M SINGLE 411 411 411 0 411 0 168 49 217 194 98 52 150 261 98 52 150 261

2. REGULAR
10M SINGLE 133 133 99 34 133 0 0 16 16 117 0 0 0 133 0 0 0 133
PILE
FOR
801 801
CONSTECH SI
1,401 1,373 566 34 600 0 211 65 276 324 123 52 175 397 123 52 175 397
ESTIMATED QUANTITY FABRICATION DELIVERY DRIVING CUTTING
AS OF AS OF AS OF AS OF
ITEM LENGTH QTY POS PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL PREV THIS WK BAL
07-21-18 07-21-18 07-21-18 07-21-18

15M BOTTOM 28 28 0 28 0 25 0 25 3
1. TEST PILE 28 25 0 25 3 25 0 25 3
25M TOP 28 28 0 28 0 18 0 18 10

11M SINGLE 411 411 411 0 411 0 119 49 168 243 70 28 98 313 70 28 98 313

2. REGULAR
10M SINGLE 133 133 22 77 99 34 0 0 0 133 0 0 0 133 0 0 0 133
PILE
FOR
801 801
CONSTECH SI
1,401 1,373 489 77 566 34 162 49 211 389 95 28 123 449 95 28 123 449