PROJECT: TIEN HAI - THAI BINH LOW PRESSURE GAS DISTRIBUTION PIPELINE SYSTEM TITLE: GAS DEHYDRATION PACKAGE
DATE: April 6, 2015
Q'TY REMARK
ITEM DESCRIPTION SPEC SIZE/RATING MATERIAL UNIT
(SELECTION) (REQUIRED)
3 FLANGES
4 FITTINGS
5 REDUCING FITTINGS
1 1/2'' SS316 EA 7
2'' SS316 EA 34
3'' SS316 EA 40
SPIRAL WOUND GASKET 3.2mm THK. 2'' SS316 EA 3
3S0
3'' SS316 EA 3
F MATERIAL
REMARK
(REQUIRED)
REMARK
(REQUIRED)
Đối với tuyến ống đổi thành Spec 3C1 :
- Weld Neck Flange , 4’’ Class 600# ASTM
- Weld Neck Flange , 4’’ Class 300# ASTM
- Weld Neck Flange , 3’’ Class 300# ASTM
- Weld Neck Flange , 2’’ Class 300# ASTM
- Weld Neck Flange , 1 1/2’’ Class 300# ASTM