Detail A
Enercon E-101
schaal 1 : 50
Enercon E-101
3.000+
1.100+
0.325+ 1.500+
Gemiddelde maaiveld
2.020-
2.600- 2.550-
3.210- 2.435-
Ref.120.000+
116.900+
115.000+
100.900+
99.200+ 98.920+
98.320+
95.860+
93.000+
91.900+
90.000+
4-7-2014 11:53:33 R:\FDE\Projecten\P7000584 Windpark Wieringermeer - Doornbos\04. Engineering\4.5 Bouwkunde Civiel\autocad\dossiers\179b\3.112.179_blad 1.dwg
Detail A
2.830+
1.500- 1.500+ 1.500+ 1.500+ 1.500+
0.900+ 0.900+
Gemiddelde maaiveld 0.400- 0.100- 0.400-
0.200+
0.200- 0.150+
0.435-
1.100- 1.200- 1.300- 0.1.150-
2.020- 1.750-
3.020- 3.100- 3.000- 3.265
Alstom ECO 110 Alstom ECO 110 Siemens SWT-3.0-113 Siemens SWT-3.0-113 Enercon E-101 Enercon E-101 GE GE Gamesa Gamesa
(NOT CONTROLLED) (NOT CONTROLLED)
Opmerking: VERTROUWELIJK
Maaiveld per lijn te bepalen
717 B 06 FDEC hr. Doornbos P70005874
D
Windpark Wieringermeer C
Hoogte's Fundaties en Turbines B 2014-06-24
A 2014-06-05
E.B
E.B
FDEC
FDEC
2014-06-02 E.B FDEC
1:250 mm 15 PPD
1
3.112.179 -
AC2012 EEBC
C2: Opstort Senvion anchorcage 3000 mm
C: Opstort
Bovenkant fundatie
A: max.: 500 mm
B B: max.: 1000 mm
500 1000
A
maaiveld
A + B = mv tot aan bovenkant
3200
fundatie: max.: 1500 mm
1700
D
Heipalen
Indicatieve fundatie
Opmerking:
Diepte en hoogte fundatie afhankelijk van grondonderzoek en
type windturbine (definitieve fundatieontwerp).
Maaiveldhoogte t.p.v. windturbine.
VERTROUWELIJK
ACCIONA AW116
18-11-2013 18-11-2013 18-11-2013
08-04-2013 08-04-2013 08-04-2013
03-04-2013 04-04-2013 04-04-2013
Doc.: LC_FL_2CTP1
CALCULATION REPORT
Rev.: E
LOAD CALCULATION-FOUNDATION LOADS AW 116/3000 IEC-IIA – TH120 – Page: 1 of 19
AW56.7
LOAD CALCULATION
FOUNDATION LOADS
2CTP1, 2CTP2 and 2CTP1-BT
0 INDEX
1 INTRODUCTION ................................................................................................................ 3
1 INTRODUCTION
In the present report, foundation loads to extreme and fatigue calculations for AW 116/3000 IEC-IIa –
120M concrete Tower – AW56.7 are shown. The loads envelope of the cases 2CTP1, 2CTP2 and
2CTP1-BT have been considered. This means AW 116/3000 IEC-IIa –TH120m – AW56.7 60Hz, 50Hz
and Cold Climate.
In addition, it includes the requirements when analyzing the appearance of the ground gap in the
foundation design. Finally, the minimum dynamic soil requirements and design conditions of the
connection tower-foundation, foundation layout, earthing system and flood level are specified.
Doc.: LC_FL_2CTP1
CALCULATION REPORT
Rev.: E
LOAD CALCULATION-FOUNDATION LOADS AW 116/3000 IEC-IIA – TH120 – Page: 4 of 19
AW56.7
The total hub height of the AW 116/3000 IEC-IIa –120m concrete Tower – AW56.7 is 120.0m. The total
hub height is measured from the top of the foundation to the hub center.
Ht=120m
Loads have been calculated according to IEC 61400 ed 2 and GL2003 regulations.
The following table shows the loads, which are found in the base of tower by the extreme load cases.
The table loads INCLUDES safety factors (S.F.) for each load case (Fz also includes the safety
factor). Safety factors are different depending on the load case as specified in the next table. The loads
have already been increased by their corresponding safety factor.
S.F.
Load case Included Mx (kN·m) My (kN·m) Mxy (kN·m) Mz (kN·m) Fx (kN) Fy (kN) Fxy (kN) Fz (kN)
in loads
Mx Max 6.1j 1.35 141954 46698 149437 4836.5 745 -1509.3 1683.1 -17154
Mx Min 6.1a 1.35 -142582 49810 151031 -3335.8 826.3 1510.3 1721.6 -17270
My Max 1.5v3 1.35 1866.6 133464 133477 -2211.6 1377.1 33.1 1377.5 -17378
My Min 1.5v2 1.35 -25141 -137200 139485 -6406.5 -1135.5 300.1 1174.5 -17251
Mxy Max 6.1a 1.35 -142011 51415 151031 -3396.5 852.2 1514.7 1738 -17282
Mxy Min 8.1ea1 1.35 -3.9 -7.95 8.86 401.8 74 6.98 74.3 -19324
Mz Max 1.5x2 1.35 -8994.3 179.2 8996.1 8186.1 195.3 129.2 234.2 -17307
Mz Min 2.2e 1.10 -15284 -51541 53760 -10211 -421.7 158.3 450.5 -14081
Fx Max 6.1j 1.35 81880 108441 135882 3086.2 1427.1 -878.4 1675.7 -17231
Fx Min 1.5v2 1.35 -26106 -136469 138943 -6286.6 -1139.2 326.1 1184.9 -17249
Fy Max 6.1f 1.35 -141637 30134 144808 -3998.7 596.7 1588.4 1696.7 -17317
Fy Min 6.1j 1.35 141943 48929 150140 4875.6 776 -1513.6 1700.9 -17143
Fxy Max 6.1g 1.35 -130988 66743 147011 -3114.9 1032.6 1411.3 1748.8 -17135
Fxy Min 1.5e1 1.35 -219.7 -9111 9113.7 245.9 -0.92 0.34 0.98 -17378
Fz Max 7.1s31 1.35 22385 32298 39297 -602.5 465.4 -306.2 557.1 -13878
Fz Min 8.1ua7 1.35 -397.8 -33989 33992 -37.9 -368.3 3.76 368.3 -19394
Table 1: Extreme Load Cases.
The next table presents the maximum operational loads of the wind turbine. These loads occur when
the turbine is working under normal circumstances.
Safety factor INCLUDED in this table. The loads have already been increased by their corresponding
safety factor.
S.F.
Load case Included Mx (kN·m) My (kN·m) Mxy (kN·m) Mz (kN·m) Fx (kN) Fy (kN) Fxy (kN) Fz (kN)
in loads
Mx Max 6.4b 1.00 41704 14014 43996 1129.1 265.4 -418.0 495.1 -12730
Mx Min 6.4b 1.00 -35823 11042 37486 -1259.6 184.5 350.5 396.1 -12810
My Max 1.2p 1.00 3690.3 68536 68635 2002.2 638.5 -2.64 638.5 -12918
My Min 2.3a 1.00 9396.7 -52206 53045 -1271.9 -420.3 -159.1 449.4 -12853
Mxy Max 1.2p 1.00 3690.3 68536 68635 2002.2 638.5 -2.64 638.5 -12918
Mxy Min 1.2b 1.00 105.0 -73.6 128.2 448.2 12.4 -0.18 12.4 -12888
Mz Max 2.3b 1.00 1041.8 -3090.0 3260.9 6969.4 104.2 -60.0 120.2 -12793
Mz Min 2.3b 1.00 6408.8 -26491 27255 -7256.1 -128.8 -134.1 185.9 -12820
Fx Max 2.3b 1.00 8613.3 43262 44111 -5598.6 678.4 -140.6 692.8 -12913
Fx Min 2.3b 1.00 2680.8 -52172 52241 1147.8 -577.1 23.4 577.6 -12812
Fy Max 6.4b 1.00 -35516 11103 37211 -1222.0 184.9 352.6 398.2 -12812
Fy Min 6.4b 1.00 39772 18414 43828 775.9 320.0 -422.2 529.8 -12754
Fxy Max 2.3b 1.00 8613.3 43262 44111 -5598.6 678.4 -140.6 692.8 -12913
Fxy Min 6.4a 1.00 -146.6 -4017.2 4019.9 -0.68 0.016 -0.019 0.025 -12875
Fz Max 6.4b 1.00 -8585.0 12210 14926 264.5 204.8 77.7 219.0 -12665
Fz Min 1.2aa 1.00 5361.8 34557 34971 944.7 378.9 -41.9 381.2 -12991
Table 2: Operational loads
Doc.: LC_FL_2CTP1
CALCULATION REPORT
Rev.: E
LOAD CALCULATION-FOUNDATION LOADS AW 116/3000 IEC-IIA – TH120 – Page: 7 of 19
AW56.7
The next table presents the maximum no gapping loads without turbulence according to GL2003
requirements.
Safety factor INCLUDED in this table. The loads have already been increased by their corresponding
safety factor.
S.F.
Load case Included Mx (kN·m) My (kN·m) Mxy (kN·m) Mz (kN·m) Fx (kN) Fy (kN) Fxy (kN) Fz (kN)
in loads
Mx Max dlc4.1c 1.00 8142.8 25226 26507 -1549.8 273.3 -55.1 278.8 -12858
Mx Min dlc4.1c 1.00 -5148.7 15935 16746 799.4 260.2 49.3 264.8 -12824
My Max dlc1.0b 1.00 5197.6 58271 58502 463.3 515.7 -23.2 516.2 -12911
My Min dlc4.1b 1.00 657.9 -33139 33146 -696.6 -245.8 -0.03 245.8 -12850
Mxy Max dlc1.0b 1.00 5228.3 58271 58505 462.4 516.6 -24.9 517.2 -12910
Mxy Min dlc4.1a 1.00 199.6 74.6 213.1 84.5 26.9 -2.92 27.1 -12876
Mz Max dlc4.1c 1.00 1526.2 1497.9 2138.4 1230.4 69.9 -9.96 70.6 -12816
Mz Min dlc4.1c 1.00 2777.7 -14924 15181 -2930.2 -53.4 -20.9 57.3 -12807
Fx Max dlc1.0b 1.00 5228.3 58271 58505 462.4 516.6 -24.9 517.2 -12910
Fx Min dlc4.1b 1.00 672.2 -33044 33051 -683.3 -246.9 -0.58 246.9 -12850
Fy Max dlc4.1c 1.00 -5125.2 16618 17390 698.7 267.3 50.2 272 -12822
Fy Min dlc4.1c 1.00 8132 24933 26225 -1581.9 267.3 -55.2 272.9 -12859
Fxy Max dlc1.0b 1.00 5228.3 58271 58505 462.4 516.6 -24.9 517.2 -12910
Fxy Min dlc4.1b 1.00 -52.9 -4373.5 4373.8 -27.5 -0.092 0.14 0.17 -12865
Fz Max dlc4.1c 1.00 -1714.6 5468.8 5731.3 -978 118.6 11.8 119.1 -12792
Fz Min dlc1.0b 1.00 1405.5 55075 55093 741.7 479.8 13.3 480 -12925
Table 3: No Gapping Load Cases.
With these loads, gap between foundation and ground is not allowed.
Doc.: LC_FL_2CTP1
CALCULATION REPORT
Rev.: E
LOAD CALCULATION-FOUNDATION LOADS AW 116/3000 IEC-IIA – TH120 – Page: 8 of 19
AW56.7
3.4.1 RAINFLOW-COUNTS
A rainflow-count calculation has been performed in order to provide necessary data. It is used for
fatigue calculations purposes.
The presentation of these data is supplied as Markov matrix in ".txt" files (ASCII format)-one file for
every load component-, where range, mean and number of occurrences are illustrated. The designer
MUST ask for the corresponding files to Acciona Windpower if he’s going to carry out a fatigue
analysis.
Only the fatigue load cases are taken into account (dlc1.2, dlc2.3, dlc4.1, dlc6.4). The occurrence of
each load case is described by Weibull wind probability distribution. An EXAMPLE can be seen below
in example table 5.1
CYCLE MEAN CYCLE RANGE NUMBER OF CYCLES AT THESE RANGE AND MEAN
Load
Mean
Range
Tim e
Damage equivalent loads are used to equate the fatigue damage represented by RFCC data to that
caused by a single stress range repeating at a single frequency. The method is based on the Miner’s
rule. The damage equivalent stress is given by the following formula:
Lmi ni
LN m
N
m is the negative inverse of the slope on the material’s Wöhler curve (m is also
referred to as the S-N curve slope).
The S-N curve slope (m) used here is 4 (steel), and 9 (composite), and its constant for every number of
cycles -there is no knee number-.
The stress Li depends upon the geometry of the structure considered. It is assumed that stress is
proportional to load, therefore it is quite acceptable to use load instead of stress in the above equation.
Doc.: LC_FL_2CTP1
CALCULATION REPORT
Rev.: E
LOAD CALCULATION-FOUNDATION LOADS AW 116/3000 IEC-IIA – TH120 – Page: 10 of 19
AW56.7
For simplicity, Li and ni have been derived from the one-dimensional table with no correction to account
for the fatigue damage due to mean stresses.
The equivalent loads (in kNm and kN) are presented overleaf for each load component assuming 10 7
cycles in the turbine lifetime of 20 years. The values are given separately for each wind speed case as
well as the integrated load. The value for each case represents the relative damage due to that
particular case. This has the advantage of allowing the damage due to each case to be compared.
Load Case m
Lmi ni LN
Mean N
Inverse
dlc1.2b
dlc1.2d
dlc1.2g
dlc1.2h
dlc6.4b
dlc6.4d
dlc1.2a
dlc1.2c
dlc1.2e
dlc1.2k
dlc6.4a
dlc6.4c
dlc1.2f
dlc1.2i
dlc1.2j
Slope
Total
.......
SN
3 451 450 449 932 977 799 760 887 796 1249 1143 ...... 273 3914 2937 1280 6452
4 500 504 500 969 1020 828 807 938 835 1290 1178 ...... 245 4853 4296 2331 6484
5 545 552 547 1013 1068 864 869 1002 884 1347 1228 ...... 247 5651 5502 3408 6973
6 585 595 589 1056 1115 900 938 1071 935 1409 1282 ...... 259 6349 6573 4448 7598
7 622 634 627 1097 1161 935 1008 1139 986 1472 1336 ...... 272 6968 7530 5427 8262
8 656 669 662 1135 1204 970 1075 1205 1033 1533 1390 ...... 286 7521 8393 6340 8927
9 688 700 693 1169 1244 1002 1139 1267 1078 1591 1441 ...... 298 8017 9176 7186 9575
10 717 729 723 1201 1282 1033 1196 1325 1120 1646 1490 ...... 310 8464 9891 7969 10197
Table 5: Lifetime rainflow cycle counts table definition
Tables 6 to 11 present the lifetime rainflow cycle counts from which the damage equivalent loads have
been derived at tower base:
Doc.: LC_FL_2CTP1
CALCULATION REPORT
Rev.: E
LOAD CALCULATION-FOUNDATION LOADS AW 116/3000 IEC-IIA – TH120 – Page: 11 of 19
AW56.7
Inverse SN
dlc1.2aa
dlc1.2ab
dlc1.2ad
dlc1.2ae
dlc1.2ag
Slope [-]
dlc1.2ac
dlc1.2af
dlc1.2m
dlc1.2w
dlc1.2u
dlc1.2a
dlc1.2b
dlc1.2d
dlc1.2e
dlc1.2g
dlc1.2h
dlc1.2n
dlc1.2o
dlc1.2p
dlc1.2q
dlc2.3a
dlc2.3b
dlc4.1a
dlc4.1b
dlc6.4a
dlc6.4b
dlc1.2c
dlc1.2k
dlc1.2s
dlc1.2v
dlc1.2x
dlc1.2y
dlc1.2z
dlc4.1c
dlc1.2r
dlc1.2f
dlc1.2t
dlc1.2i
dlc1.2j
dlc1.2l
Total
3 2021 3924 3812 3770 3762 4119 4188 3998 2037 1933 2466 2453 2376 3253 3315 3347 4209 4012 4275 5050 4690 4459 4898 4862 4870 4632 4704 4724 4171 4385 4505 4063 3958 793 1586 624 412 692 867 10361 14881
4 2152 5175 5396 5342 5317 6314 6457 6197 2222 2084 2618 2584 2522 3377 3473 3495 4458 4227 4487 5467 5069 4814 5455 5452 5523 5354 5456 5501 5137 5420 5597 5371 5223 1712 3278 847 795 1370 841 15138 16487
5 2304 6312 6804 6741 6706 8358 8592 8326 2438 2257 2795 2732 2705 3549 3698 3682 4749 4485 4740 5885 5436 5157 5981 6032 6176 5990 6120 6188 5993 6328 6574 6534 6347 2756 5191 1026 1207 2102 875 19314 19741
6 2469 7357 8054 7982 7945 10243 10581 10363 2671 2440 2979 2878 2900 3732 3953 3879 5044 4747 5000 6291 5776 5475 6482 6614 6827 6569 6719 6802 6777 7140 7461 7573 7355 3810 7155 1172 1610 2819 924 22974 23137
7 2641 8320 9165 9086 9056 11986 12428 12290 2906 2626 3162 3017 3097 3910 4216 4075 5326 4998 5254 6682 6085 5767 6959 7192 7466 7103 7266 7352 7507 7874 8268 8504 8261 4818 9074 1293 1988 3491 976 26220 26292
8 2812 9207 10157 10074 10054 13600 14139 14088 3131 2806 3339 3146 3288 4077 4473 4265 5588 5232 5495 7055 6367 6033 7408 7753 8074 7596 7765 7846 8190 8539 9003 9336 9076 5758 10896 1394 2334 4104 1026 29130 29166
9 2975 10018 11045 10961 10953 15093 15718 15747 3338 2975 3506 3266 3467 4231 4714 4444 5827 5446 5721 7406 6624 6275 7828 8282 8639 8052 8218 8289 8824 9142 9670 10080 9810 6623 12595 1480 2647 4659 1073 31763 31782
10 3127 10760 11844 11761 11765 16471 17168 17264 3524 3129 3660 3376 3632 4371 4935 4611 6044 5639 5931 7733 6857 6495 8215 8770 9155 8470 8630 8687 9407 9689 10276 10745 10471 7415 14164 1553 2929 5158 1118 34161 34171
Table 6: Lifetime Weighted Equivalent Loads: Tower Mx, Tower station height= 0m (1.E+07 cycles)
Inverse SN
dlc1.2aa
dlc1.2ab
dlc1.2ad
dlc1.2ae
dlc1.2ag
Slope [-]
dlc1.2ac
dlc1.2af
dlc1.2m
dlc1.2w
dlc1.2a
dlc1.2b
dlc1.2d
dlc1.2e
dlc1.2g
dlc1.2h
dlc1.2n
dlc1.2o
dlc1.2p
dlc1.2q
dlc1.2u
dlc2.3a
dlc2.3b
dlc4.1a
dlc4.1b
dlc6.4a
dlc6.4b
dlc1.2c
dlc1.2k
dlc1.2s
dlc1.2v
dlc1.2x
dlc1.2y
dlc1.2z
dlc4.1c
dlc1.2r
dlc1.2f
dlc1.2t
dlc1.2i
dlc1.2j
dlc1.2l
Total
3 10591 8272 7488 7352 7391 6842 6561 6534 10552 10533 11507 11519 11484 14498 14641 14556 13555 13618 13695 12990 13085 12549 11857 11991 12091 10378 10326 10338 9443 9193 9173 8822 8532 3147 4353 5273 4256 2895 997 4676 36005
4 12507 10851 10481 10269 10287 10309 9877 9843 12351 12248 13645 13436 13419 18393 18630 18755 16713 16893 16827 15713 15798 14954 14737 14790 14857 12512 12484 12592 11657 11302 11233 11699 11234 7726 8812 8154 9151 5451 839 6897 34068
5 14946 13139 13148 12869 12831 13487 12937 12879 14658 14432 16116 15727 15748 22427 22728 23023 20058 20362 20128 18479 18610 17416 17814 17753 17763 14588 14606 14862 13665 13212 13045 14284 13654 13268 13604 10899 14502 8176 756 8918 35120
6 17389 15163 15509 15172 15051 16349 15726 15623 16999 16660 18453 17955 17999 26018 26375 26783 23105 23499 23136 20927 21154 19626 20736 20554 20490 16510 16579 17015 15494 14946 14634 16580 15811 19029 18294 13337 19713 10860 706 10774 36883
7 19577 16954 17603 17215 16991 18920 18264 18105 19117 18690 20507 19945 19996 29085 29500 29981 25757 26218 25766 23016 23368 21538 23374 23084 22936 18243 18361 18989 17163 16520 16034 18606 17728 24621 22708 15442 24547 13389 672 12496 38793
8 21466 18544 19465 19031 18695 21231 20577 20357 20953 20460 22272 21670 21720 31690 32159 32693 28045 28557 28042 24798 25282 23185 25710 25331 25095 19789 19953 20769 18686 17949 17275 20391 19429 29868 26790 17248 28935 15713 648 14099 40745
9 23083 19961 21127 20651 20200 23318 22688 22408 22528 21986 23788 23158 23201 33912 34432 35005 30020 30575 30014 26330 26948 24613 27765 27315 26996 21165 21369 22363 20072 19246 18384 21966 20941 34712 30540 18800 32883 17822 629 15586 42766
10 24472 21231 22616 22102 21536 25208 24619 24283 23883 23301 25096 24444 24480 35824 36387 36993 31734 32324 31728 27662 28406 25861 29572 29066 28671 22389 22631 23789 21333 20421 19382 23360 22289 39146 33977 20144 36427 19724 615 16961 44912
Table 7: Lifetime Weighted Equivalent Loads: Tower My, Tower station height= 0m (1.E+07 cycles)
Inverse SN
dlc1.2aa
dlc1.2ab
dlc1.2ad
dlc1.2ae
dlc1.2ag
Slope [-]
dlc1.2ac
dlc1.2af
dlc1.2m
dlc1.2w
dlc4.1b
dlc1.2a
dlc1.2b
dlc1.2d
dlc1.2e
dlc1.2g
dlc1.2h
dlc1.2n
dlc1.2o
dlc1.2p
dlc1.2q
dlc1.2u
dlc2.3a
dlc2.3b
dlc4.1a
dlc6.4a
dlc6.4b
dlc1.2c
dlc1.2k
dlc1.2s
dlc1.2v
dlc1.2x
dlc1.2y
dlc1.2z
dlc4.1c
dlc1.2r
dlc1.2f
dlc1.2t
dlc1.2i
dlc1.2j
dlc1.2l
Total
3 926 1263 1047 1035 1037 858 859 866 949 955 1049 1063 1049 1399 1398 1344 1731 1683 1667 1805 1837 1824 1755 1771 1781 1649 1629 1632 1404 1434 1449 1264 1257 115 553 58.1 78.5 289 134 462 4591
4 975 1648 1481 1456 1454 1296 1292 1300 1002 1000 1097 1111 1092 1479 1479 1410 1816 1762 1729 1961 2005 2006 1946 1962 1987 1921 1889 1883 1699 1740 1765 1669 1652 229 1167 90.8 163 500 109 651 3997
5 1037 2001 1899 1857 1850 1717 1704 1713 1068 1055 1165 1177 1155 1590 1591 1509 1937 1880 1827 2155 2210 2227 2147 2157 2198 2190 2144 2126 1964 2015 2053 2053 2021 356 1859 122 257 718 97.0 827 3883
6 1103 2327 2297 2235 2221 2110 2086 2096 1139 1113 1237 1248 1224 1706 1710 1620 2068 2010 1936 2362 2424 2457 2346 2346 2401 2449 2390 2357 2204 2267 2314 2417 2366 483 2556 149 349 931 89.5 992 3958
7 1168 2626 2669 2586 2564 2472 2436 2446 1209 1171 1306 1318 1295 1817 1825 1731 2198 2139 2043 2563 2630 2676 2535 2523 2589 2690 2620 2571 2422 2496 2550 2757 2686 606 3221 173 435 1134 84.6 1144 4134
8 1229 2898 3012 2910 2878 2801 2753 2762 1276 1227 1370 1383 1362 1918 1931 1836 2318 2259 2143 2749 2821 2876 2709 2685 2759 2909 2830 2766 2619 2704 2761 3070 2978 723 3841 193 512 1323 81.0 1283 4391
9 1286 3145 3327 3207 3164 3100 3039 3046 1337 1278 1427 1443 1424 2008 2029 1933 2428 2368 2234 2918 2993 3056 2867 2833 2912 3106 3019 2941 2798 2894 2951 3357 3245 831 4412 211 582 1496 78.3 1410 4718
10 1338 3369 3615 3478 3425 3372 3298 3302 1393 1326 1477 1498 1480 2089 2117 2022 2527 2465 2315 3070 3148 3216 3010 2966 3050 3282 3188 3097 2961 3068 3123 3618 3488 930 4935 226 645 1653 76.3 1525 5096
Table 8: Lifetime Weighted Equivalent Loads: Tower Mz, Tower station height= 0m (1.E+07 cycles)
Doc.: LC_FL_2CTP1
CALCULATION REPORT
Rev.: E
LOAD CALCULATION-FOUNDATION LOADS AW 116/3000 IEC-IIA – TH120 – Page: 12 of 19
AW56.7
Inverse SN
dlc1.2ab
dlc1.2aa
dlc1.2ad
dlc1.2ae
dlc1.2ag
Slope [-]
dlc1.2ac
dlc1.2af
dlc1.2m
dlc1.2w
dlc1.2a
dlc1.2b
dlc1.2d
dlc1.2e
dlc1.2g
dlc1.2h
dlc1.2n
dlc1.2o
dlc1.2p
dlc1.2q
dlc1.2u
dlc2.3a
dlc2.3b
dlc4.1a
dlc4.1b
dlc6.4a
dlc6.4b
dlc1.2c
dlc1.2k
dlc1.2s
dlc1.2v
dlc1.2x
dlc1.2y
dlc1.2z
dlc4.1c
dlc1.2r
dlc1.2f
dlc1.2t
dlc1.2i
dlc1.2j
dlc1.2l
Total
3 149 138 122 121 122 107 103 102 148 147 157 158 158 192 196 195 197 199 199 204 206 202 190 195 196 176 176 177 162 161 160 147 143 28.5 59.7 47.9 35.7 32.9 10.8 56.6 544
4 157 167 159 158 159 152 146 143 156 155 165 163 162 204 208 209 206 206 207 210 211 208 201 206 208 191 191 193 184 183 180 180 174 68.2 118 72.1 76.5 58.1 9.01 83.2 446
5 173 191 191 190 191 192 184 180 171 170 182 176 175 228 231 237 226 223 225 223 224 220 217 221 225 205 206 209 204 203 199 210 201 117 181 95.1 121 82.9 8.24 108 418
6 193 213 218 219 220 227 218 213 189 189 202 192 190 255 257 268 251 246 246 238 239 235 234 240 244 220 222 227 222 221 214 236 225 167 242 116 165 106 8.01 133 414
7 213 232 243 245 245 259 250 243 208 208 221 208 206 280 283 297 275 269 268 253 256 250 252 259 264 233 236 244 239 237 229 260 247 216 300 134 205 127 8.17 156 422
8 232 249 265 269 268 288 280 269 226 227 239 222 221 303 305 323 298 290 288 268 272 264 270 277 283 246 250 260 254 253 241 282 266 262 352 150 242 147 8.56 179 435
9 248 264 284 290 289 314 308 293 243 243 255 236 234 324 325 345 318 309 305 281 286 276 286 295 301 258 263 275 268 267 252 302 284 305 401 163 275 164 9.02 200 454
10 263 278 301 310 308 337 334 314 257 257 269 248 247 341 342 364 336 325 321 293 300 288 302 311 318 270 275 288 281 281 263 321 300 344 445 175 305 180 9.46 219 478
Table 9: Lifetime Weighted Equivalent Loads: Tower Fx, Tower station height= 0m (1.E+07 cycles)
Inverse SN
dlc1.2aa
dlc1.2ab
dlc1.2ad
dlc1.2ae
dlc1.2ag
Slope [-]
dlc1.2ac
dlc1.2af
dlc1.2m
dlc1.2w
dlc1.2a
dlc1.2b
dlc1.2d
dlc1.2e
dlc1.2g
dlc1.2h
dlc1.2n
dlc1.2o
dlc1.2p
dlc1.2q
dlc1.2u
dlc2.3a
dlc2.3b
dlc4.1a
dlc4.1b
dlc6.4a
dlc6.4b
dlc1.2z
dlc1.2c
dlc1.2k
dlc1.2s
dlc1.2v
dlc1.2x
dlc1.2y
dlc4.1c
dlc1.2r
dlc1.2f
dlc1.2t
dlc1.2i
dlc1.2j
dlc1.2l
Total
3 28.5 59.6 52.1 52.2 52.6 52.8 54.3 53.2 29.5 25.2 34.4 34.1 33.4 52.4 51.1 48.9 63.3 63.2 66.6 74.1 70.4 66.4 74.0 72.1 72.0 70.7 71.5 72.5 63.7 66.4 69.2 59.6 59.6 15.0 20.9 6.36 3.81 6.57 10.3 110 204
4 30.9 73.9 70.2 70.6 71.1 77.9 80.4 78.6 32.4 26.5 35.2 34.7 33.8 53.0 50.9 48.6 63.4 63.3 66.3 76.6 72.4 68.1 78.9 76.7 77.1 77.7 78.8 80.0 73.9 77.3 80.9 74.3 74.0 32.5 42.3 8.75 6.85 12.4 9.80 159 194
5 33.6 86.5 86.4 87.2 87.6 101 105 103 35.7 28.3 36.6 35.9 35.0 54.8 52.0 49.7 65.1 65.2 67.6 80.4 75.6 70.8 84.3 81.6 82.7 84.3 85.6 87.1 82.9 86.9 91.5 87.4 86.6 52.3 66.3 10.7 9.89 18.4 9.88 202 214
6 36.4 98.0 101 102 103 122 127 126 38.8 30.1 38.2 37.2 36.4 57.0 53.6 51.2 67.4 67.7 69.3 84.7 79.1 73.7 90.0 86.5 88.4 90.5 92.0 93.8 91.1 95.7 101 99.4 98.0 72.5 90.7 12.5 12.7 24.3 10.1 239 244
7 38.9 109 114 116 116 142 147 147 41.6 31.9 39.8 38.5 37.9 59.2 55.5 53.0 70.0 70.7 71.2 89.3 82.6 76.6 95.9 91.3 93.9 96.3 97.9 100 98.6 104 111 110 108 91.8 115 13.9 15.3 29.8 10.4 271 274
8 41.2 118 126 129 129 160 166 167 44.1 33.7 41.3 39.7 39.4 61.3 57.3 54.7 72.7 73.7 73.1 94.0 86.0 79.5 102 95.9 99.2 102 104 106 106 111 120 120 118 110 137 15.2 17.6 34.8 10.7 300 301
9 43.3 127 137 140 140 177 184 185 46.3 35.3 42.7 40.8 40.8 63.3 59.1 56.4 75.3 76.8 75.0 98.5 89.4 82.3 107 100 104 107 109 111 112 118 129 129 126 126 158 16.3 19.7 39.3 11.0 326 327
10 45.2 136 147 151 151 192 200 203 48.2 36.8 44.0 41.8 42.2 65.1 60.9 57.9 77.8 79.7 76.8 103 92.5 84.9 113 105 109 112 114 116 118 124 137 137 133 142 178 17.3 21.6 43.4 11.4 349 350
Table 10: Lifetime Weighted Equivalent Loads: Tower Fy, Tower station height= 0m (1.E+07 cycles)
Inverse SN
dlc1.2ae
dlc1.2aa
dlc1.2ab
dlc1.2ad
dlc1.2ag
Slope [-]
dlc1.2ac
dlc1.2af
dlc1.2m
dlc1.2w
dlc1.2a
dlc1.2b
dlc1.2d
dlc1.2e
dlc1.2g
dlc1.2h
dlc1.2n
dlc1.2o
dlc1.2p
dlc1.2q
dlc1.2u
dlc2.3a
dlc2.3b
dlc4.1a
dlc4.1b
dlc6.4a
dlc6.4b
dlc4.1c
dlc1.2c
dlc1.2k
dlc1.2s
dlc1.2v
dlc1.2x
dlc1.2y
dlc1.2z
dlc1.2r
dlc1.2f
dlc1.2t
dlc1.2i
dlc1.2j
dlc1.2l
Total
3 24.6 47.6 37.8 36.7 35.8 32.9 31.4 30.4 24.9 20.2 28.3 28.5 28.6 49.6 46.6 41.2 60.1 57.2 61.2 66.1 63.8 61.6 65.9 64.9 64.2 61.9 62.7 63.0 52.6 53.9 54.6 46.4 46.7 3.84 9.50 4.91 3.60 4.41 3.76 21.4 164
4 27.3 57.7 48.9 47.4 46.3 45.8 43.7 42.2 27.6 20.6 28.4 28.3 28.6 49.4 45.7 40.0 58.7 55.9 59.7 66.4 63.5 61.8 68.3 66.9 66.2 66.4 67.4 67.4 59.9 61.2 61.8 55.9 56.3 8.33 19.9 8.01 7.66 8.68 3.24 33.7 134
5 30.3 66.6 58.6 56.8 55.6 57.0 54.6 52.8 30.5 21.8 29.4 29.1 29.6 51.0 46.7 40.5 59.7 56.6 60.3 68.6 65.0 63.8 71.6 69.9 69.3 70.9 72.1 71.7 66.5 67.6 68.1 64.1 64.5 13.8 32.3 10.8 12.1 13.3 3.27 45.7 123
6 33.0 74.8 67.4 65.3 64.2 67.0 64.2 62.5 33.1 23.1 30.7 30.2 31.0 53.1 48.2 41.6 61.5 58.3 61.7 71.8 67.2 66.7 75.0 73.2 72.7 75.0 76.6 75.8 72.5 73.5 73.7 71.5 71.9 19.6 45.3 13.3 16.5 17.9 3.57 57.0 120
7 35.4 82.5 75.6 73.1 72.0 76.0 72.9 71.3 35.3 24.5 32.1 31.4 32.5 55.3 49.9 43.1 63.8 60.4 63.3 75.5 69.9 70.0 78.6 76.6 76.2 79.0 81.0 79.6 78.0 78.8 78.9 78.4 78.6 25.3 58.2 15.4 20.5 22.2 3.91 67.2 120
8 37.4 89.9 83.1 80.3 79.3 84.0 80.7 79.3 37.2 25.7 33.6 32.6 34.0 57.6 51.6 44.7 66.2 62.6 64.9 79.5 72.7 73.6 82.0 80.1 79.7 82.8 85.1 83.3 83.0 83.7 83.8 84.9 84.9 30.7 70.4 17.2 24.2 26.1 4.23 76.5 121
9 39.2 96.8 90.2 86.9 86.0 91.3 87.8 86.8 38.9 26.9 35.0 33.9 35.5 59.7 53.2 46.3 68.6 64.9 66.6 83.4 75.6 77.1 85.4 83.5 83.1 86.3 89.1 86.8 87.6 88.2 88.2 91.0 90.8 35.6 81.7 18.8 27.5 29.7 4.50 84.8 124
10 40.7 103 96.7 93.0 92.2 97.9 94.3 93.5 40.3 27.9 36.4 35.0 36.9 61.8 54.7 47.8 70.9 67.1 68.1 87.3 78.5 80.6 88.5 86.8 86.2 89.6 92.8 90.0 91.8 92.4 92.3 96.7 96.2 40.2 92.1 20.1 30.5 32.9 4.73 92.3 127
Table 11: Lifetime Weighted Equivalent Loads: Tower Fz, Tower station height= 0m (1.E+07 cycles)
Doc.: LC_FL_2CTP1
CALCULATION REPORT
Rev.: E
LOAD CALCULATION-FOUNDATION LOADS AW 116/3000 IEC-IIA – TH120 – Page: 13 of 19
AW56.7
It must be ensured that foundation soil properties comply with the assumptions made in the
static and dynamic calculations for the tower’s design. This requirement is given for an ordinary
slab foundation.
For sites where they have poor soil conditions, the use of pile foundations could be an option.
In connection with the settlement analysis it should be distinguished between immediate elastic
and time dependent consolidation settlements. Calculations should provide information on the
tolerance or variability in the settlement calculation. In this way, each soil layer contributing to
the foundation settlement and stiffness must be thoroughly investigated. The depth to be
investigated should at least equal the largest base dimension of the structure. The soil borings
are to extend to at least this depth.
4.1 SETTLEMENT
To ensure the suitable behavior of the tower during operation, a maximum foundation inclination
of 3mm/m is permissible. This value refers to the uneven settling due to constant load (dead
weight) and not to an inclination during operation as a result of the external moments. The
inclination occurring due to dead weight must be demonstrated by means of an adequate
analysis.
Doc.: LC_FL_2CTP1
CALCULATION REPORT
Rev.: E
LOAD CALCULATION-FOUNDATION LOADS AW 116/3000 IEC-IIA – TH120 – Page: 14 of 19
AW56.7
Particular attention needs to be paid to the requirements with regard to soil dynamics, since the
wind turbines are structures that are subject to strong dynamic loads and stresses. It must be
taken into account that the load excitation is not a static event but a dynamic one (excitation
frequencies <5Hz.).
It’s very important to avoid the interaction of the soil and foundation dynamics with the rest of
the turbine. To comply with this need the dynamic soil stiffness for AW 116 /3000 IEC-IIa –
T120H, AW56.7 must have a minimum value of:
5 DESIGN CONDITIONS
The foundation design to develop will take into account the following conditions:
Acciona Windpower will design the connection between the foundation and the tower. The
designer must request to AW the foundation assembly requirements.
In case of the concrete tower, the connection between the tower and the foundation is done
through several corrugated sheaths and a system of prestressing tendons as shown in next
figure.
Next plot shows the distribution of the External Prestressing tendons and the anchor system
used.
The designer of the foundation must take into account the forces due to the anchoring of the
prestressing cable. The foundation have to be design to resist 6 punctual loads of 3333 kN
each. These loads consist of 6 prestressing groups, as shown in the previous figure.
The requirements for the foundation are collected in General Document DG200336 of Acciona
Windpower. This General Document includes the design of a General Foundation, Concrete
Ground Floor, selected backfill and preassembly slabs for concrete tower erection.
The previous issues are civil work competences. Their correct implementation following AW’s
indications is needed for erecting the concrete tower.
Doc.: LC_FL_2CTP1
CALCULATION REPORT
Rev.: E
LOAD CALCULATION-FOUNDATION LOADS AW 116/3000 IEC-IIA – TH120 – Page: 17 of 19
AW56.7
The earthing system consists of two parts: the general earthing system and the earthing system
for each wind turbine, which is connected to the general system.
The final topology of an earthing system depends on the location of the W.F., since it depends
on the characteristics of the ground (electric resistivity, homogeneity, stratification, etc.) and on
the current regulation where the wind turbine is assembled.
The designer must include on the foundation drawings the earthing system sketch according to
AW specifications and drawings.
After all, the earthing system resistance must be less than 10Ω;
The AW documents show an example of the earthing system execution. the earthing system
configuration depends on the current and local regulation where the wind turbine is assembled.
The earthing system for each wind turbine must be connected to the general earthing system of
the wind farm with 50mm2 copper.
The foundation drawings will have to take into account the holes for the wind farm general
wiring installation.
In order to avoid the water accumulation over the tower base level or into the pedestal catchpit,
the design and the construction of the foundation, of the assembly platform and of the site
access must assure that the flood level is under the top pedestal level. For it, the designer must
study the flood risk and design the drainage necessary of the different elements (foundation,
assembly platform and site access).
Doc.: LC_FL_2CTP1
CALCULATION REPORT
Rev.: E
LOAD CALCULATION-FOUNDATION LOADS AW 116/3000 IEC-IIA – TH120 – Page: 18 of 19
AW56.7
AW3000
En caso de duda prevalecerá la versión en castellano/ In case of doubt, the Spanish version shall prevail.
© 2013 ACCIONA WINDPOWER S.A. Todos los derechos reservados / All rights reserved
Doc.: DG200297
DOCUMENTOS GENERALES
1. INTRODUCCIÓN 1. INTRODUCTION
En el presente documento se describen las This document provides a general overview of the
características generales de la cimentación para la foundation characteristics for the AW3000 and
máquina AW3000 y se indican especificaciones references certain technical specifications from
técnicas requeridas por Acciona Windpower para Acciona Windpower required for designing the
realizar su diseño. applicable foundation.
Existen distintos modelos de aerogenerador Acciona Windpower offers the AW3000 with
AW3000 en función de la clase del emplazamiento different hub heights and rotor options, and the
y el tipo de torre y su altura. Estos parámetros foundation design will vary according to these
definen inicialmente el diseño de la cimentación de different product variants. In addition, the design
la turbina, sin embargo existen otros muchos will be further defined by the actual site conditions
aspectos a tener en cuenta relacionados con las of each turbine. The intent of this document is to
características particulares encontradas en campo. provide a general technical description of the
En el presente documento se pretende aportar una foundations for the AW3000 platform.
descripción técnica general para la cimentación de
la máquina AW3000.
Las turbinas eólicas se encuentran sujetas a Wind turbines are exposed to high dynamic and
fuertes cargas dinámicas y estáticas, y la zapata es static loads, and the principal means of support for
el elemento fundamental que sirve de soporte the machine is the foundation. It avoids overturning
estructural para toda la máquina. Evita el vuelco y or subsidence, as it is the mechanical support for all
el hundimiento, recibiendo todas las cargas desde the loads coming from the tower.
la torre realizando el soporte mecánico.
El aerogenerador AW3000 puede ir montado The AW3000 wind turbine can be assembled on
sobre 2 tipos de torres distintas: de acero o de two different types of towers: steel or concrete.
hormigón. De esta forma, para que la torre y la Correspondingly, there are two different foundation
cimentación trabajen de manera solidaria debe de types for each of these options:
adaptarse la zapata a cada tipo de estructura.
Doc.: DG200297
DOCUMENTOS GENERALES
La unión de la torre a la cimentación se realiza The union of the tower to the foundation is
mediante una corona formada por una doble hilera achieved by means of a ring with two concentric
concéntrica de pernos, embebida en una zapata de rows of studs, which is embedded inside a
hormigón armado. Dicha doble hilera de pernos reinforced concrete slab. That double ring of studs
sobresale por la parte superior de la zapata para protrudes from the upper side of the slab to tension
atornillarla al primer tramo de torre. to the tower.
De manera general la zapata será de forma Generally, the slab will be octagonal, and a
octogonal, y el esquema de la misma junto con la generic diagram of the slab with the shear
armadura cortante correspondiente a la torre de reinforcement related to the steel tower is shown
acero se muestran a continuación: below:
En estas zapatas generalmente nos encontramos There is typically more steel and less concrete than
con más armadura y menos hormigón de lo que the concrete tower foundation. For the leveling with
hay en las zapatas para torres de hormigón. Para la the first tower section, the grout is replaced with the
nivelación con el primer tramo de la torre, el upper foundation flange. Similarly, the foundation
mortero de nivelación es sustituido por la brida stud ring of the slab is shown below:
superior de la cimentación. Así mismo, el carrete de
Doc.: DG200297
DOCUMENTOS GENERALES
De la zapata también sobresalen las barras para Also, 6 groups of four bolts protrude from the slab
realizar el post-tensado de la torre una vez estén la for the tower post-tensioning once the tower and the
torre y la nacelle montadas. nacelle are assembled.
El esquema general de la zapata correspondiente A generic diagram of the slab for concrete tower
a la torre de hormigón y el de la unión torre-zapata and the tower-slab union at the sheath is shown in
en las vainas puede verse en las siguientes figuras: the following pictures:
Doc.: DG200297
DOCUMENTOS GENERALES
Zapata para torre de hormigón con detalle de las vainas y los pernos post-tensado / Slab for concrete tower with the sheaths and post
tension anchoring bolts detailed
El premontaje de la torre se realiza en una serie The keystone pre-assembly takes place next to the
de losas donde se irán dejando los tramos para su wind turbine foundation on concrete slabs as shown
levantamiento. Las losas se podrían colocar de 2 in the diagrams below. The slabs could be placed by
maneras: radialmente alrededor de la torre, o en 2 ways: radially around the tower, or in line.
línea recta una tras otra. A continuación se muestra
un esquema general del relleno y las losas de
premontaje:
Doc.: DG200297
DOCUMENTOS GENERALES
El diseño de la puesta a tierra del aerogenerador The AW3000 grounding design should assure the
AW3000 debe asegurar la protección completa de complete protection of the machine from Electrical
la máquina. Para dicha protección existen dos Over-Voltages. This target is achieved by using a
partes en el sistema de red de tierras: una toma de general grounding grid for the collection system (with
2
red general para todo el parque eólico (a través de a copper cable of 50 mm ), and an individual
2
un cable de cobre desnudo de 50 mm ), y la toma grounding grid for each wind turbine, which should all
de tierras de cada turbina en particular que irá be connected to the collection system grounding grid.
unida a la red general.
Los sistemas de protección contra rayos y puesta The grounding system is designed and certified
a tierra están diseñados y certificados conforme a according to Germanicher Lloyd Gudeline for the
la norma Germanicher Lloyd Guideline for the classification of Windturbines (Edition 2003 with
classification of Windturbines (Edition 2003 with suplement 2004) Rules and Guidelines IV – Industrial
suplement 2004) Rules and Guidelines IV – Services, Part 1. A more detailed explanation of the
Industrial Services, Part 1. En el documento lightning and grounding requirements can be found in
DG200233 se ha hace una explicación más specification DG200233.
detallada de los requerimientos de protección
contra rayos y puesta a tierra.
Doc.: DG200297
DOCUMENTOS GENERALES
La puesta a tierra depende de la resistividad del The grounding system depends on soil resistivity
terreno y puede verse afectada por normativas and can be affected by local regulations. As an
locales. A modo de ejemplo, el sistema se example, this system below consists in a rhombus
compone de un primer rombo de pletinas de acero with galvanized steel flanges, that is installed before
galvanizado que se coloca antes de empezar a laying the mesh reinforcement and the bolt crown (for
poner la armadura y la corona de pernos (en el steel tower), with central extensions above the higher
caso de la torre de acero) y del que sobresalen side of the slab and connected to the general
prolongaciones centrales por encima de la parte grounding grid and the tower grounding grid.
superior de la zapata y que van unidas al sistema
de tierras de la torre y de la red general del parque.
La otra parte de la puesta a tierra consiste en una The other part of the grounding system are
serie de anillos de cobre al nivel de la parte concentric rings on the top side of the slab after
superior de la zapata una vez esté ya hormigonada, ending the concreting, and around the graded
y alrededor de la acera sobre la superficie de la aggregate surface of 1 meter from the turbine tower.
zahorra a 1 metro del aerogenerador. De esta Thus, the equipotentiality on the turbine influence
manera se garantiza la equipotencialidad en la zone is secured.
zona de influencia de la turbina.
Doc.: DG200297
DOCUMENTOS GENERALES
Se debe garantizar que este sistema de tierras It must be assured that the grounding termination
posea una resistencia mínima igual o inferior a 10 shall have an equal or lower resistance than 10 Ω. In
Ω. En la siguiente figura se muestra una vista en the figure below the grounding system can be seen:
planta del sistema:
Es importante en el diseño de la cimentación It is important to take into account the layout of the
tener en cuenta la distribución de los cables de control and power cables for the foundation design.
potencia y de control de la máquina. La red de Cable grid for electrical connection will be guided
cables para la conexión eléctrica irá introducida a through the foundation to the central collection box.
través del interior de la zapata para acabar A more detailed explanation of the electrical
sobresaliendo por la arqueta inferior de la torre. En interfaces can be found in specification DG200311.
Doc.: DG200297
DOCUMENTOS GENERALES
La turbina puede ir conectada a través de 3 The turbine can be connected with three-conductor
cables unipolares o uno tripolar, y en función del cable or just one single-conductor cable, and the
tipo de torre los cables y los tubos que los different tower types can accommodate the cables of
contienen pueden variar. varying size as follows.
En el caso de emplear cable tripolar, el cable In case of three-conductor type cable, the
2 2
más grande considerado constará de 3x400 mm largest considered is 3x400mm of section, with a big
de sección, con un radio de curvatura muy grande bending radius of 2000mm approx.
de 2000mm aprox.
En este caso será necesario un diseño especial A special foundation design will be necessary,
de la cimentación debido a que la acometida because the electrical connection through the
eléctrica a través de la zapata es más complicada. foundation is more complicated.
Estas dimensiones de tubos son válidas también These conduit dimensions are valid for the
para los cables equivalentes de la métrica AWG. equivalent cables of AWG metric.
Los cables de toma de tierras y de potencia de la The grounding and the power cables will be guided
máquina irán en un tritubo de 50mm de diámetro. with three conduits of 50mm of diameter.
En emplazamientos donde se den condiciones de In locations with a high flooding probability, due to
inundación, debido a que la cota del terreno the higher elevation of the terrain all around, the
circundante es mayor, los tubos irán sellados para conduits need to be sealed to prevent water access.
impedir el acceso del agua a los mismos.
La zapata debe ser capaz de soportar las cargas The slab must be able to support the static and
estáticas y dinámicas calculadas en el diseño de la dynamic loads estimated during the tower design and
torre al igual que el terreno debe de poder soportar the soil must be able to support the structure.
toda la estructura. En función de esto, se diseña la Consequently, the slab is designed with specific
zapata de unas dimensiones y con unos materiales materials and dimensions particular to the site.
determinados.
Los requerimientos de cargas de Acciona Acciona Windpower's foundation loads requirements are
Windpower para la cimentación vienen specified in the corresponding foundation load reports.
Doc.: DG200297
DOCUMENTOS GENERALES
Los materiales de los que se compone la The slab materials for AW3000 shall have
zapata de la máquina AW3000 deben tener the following characteristics (for steel tower
de manera general las siguientes and concrete tower):
características (tanto para la torre de acero
como para la de hormigón):
Hormigón / Concrete:
Acero / Steel:
Al igual que la zapata, es importante It is important to ensure that the soil is able
cerciorarse de que el terreno es capaz de to support the full loads transmitted from the
resistir el conjunto de cargas transmitidas tower. A geotechnical study is required
al mismo. Para ello inicialmente se debe taking into consideration the following
realizar un estudio geotécnico donde se aspects. In the case of Acciona Windpower
detalle fundamentalmente los aspectos que designing a foundation for a customer, the
se detallan debajo. En el caso de que specification DG200076 explains these
Acciona Windpower diseñe una requirements in more detail:
cimentación para el cliente, el documento
DG200076 explica estos requerimientos
con mayor detalle:
Se establece como norma general una The general soil requirement must be
2 2
capacidad portante de 3kg/cm . Y por otro 3kg/cm . And also, the soil must have a
lado debe poseer una resistencia eléctrica maximum resistivity of 10 Ω to ensure the
máxima de 10 Ω para proteger a la protection of the turbine.
máquina.
En lugares donde las condiciones del When the characteristics of the soil are too
terreno sean muy pobres (zonas poor to provide the necessary stiffness (as at
inundables), el empleo de cimentación flooded areas) soil remediation, aggregate
pilotada puede subsanar problemas. piers, or piles may be required.
Gallego Bas, Ciaurriz Martin, Nuñez Polo, Miguel
Miguel Angel Javier 2013.11.22 14:37:58
2013.11.22 2013.11.22 +01'00'
13:06:41 +01'00' 13:34:27 +01'00'
Gallego Bas, Ciaurriz Martin, Javier Nuñez Polo, Miguel
Miguel Angel 2013.11.22 13:34:52 2013.11.22 14:38:48
2013.11.22 +01'00' +01'00'
13:07:34 +01'00'
Gallego Bas, Ciaurriz Martin,
Javier Nuñez Polo, Miguel
Miguel Angel
2013.11.22 14:39:49
2013.11.22 2013.11.22 +01'00'
13:08:39 +01'00' 13:35:11 +01'00'
Gallego Bas,
Ciaurriz Martin, Javier Nuñez Polo, Miguel
Miguel Angel 2013.11.22 14:41:16
2013.11.22 13:35:30
2013.11.22 +01'00' +01'00'
13:09:05 +01'00'
Gallego Bas,
Ciaurriz Martin, Javier Nuñez Polo, Miguel
Miguel Angel 2013.11.22 13:35:53 2013.11.22 14:41:53
2013.11.22 +01'00' +01'00'
13:09:33 +01'00'
Gallego Bas,
Ciaurriz Martin, Javier Nuñez Polo, Miguel
Miguel Angel 2013.11.22 14:42:57
2013.11.22 13:36:14
2013.11.22 +01'00' +01'00'
13:13:44 +01'00'
INVENTORY OF CHEMICAL SUBSTANCES / INVENTARIO DE SUSTANCIAS QUÍMICAS
AW 3000
Safety Data
Termina File (SDF) Average ACTIVITIES/TECHNOLOGIES
Purchase Mutual Soc. Registrat Safety Yellow Compress
tion Date / Fecha Quantity ACTIVIDADES/TECNOLOGÍAS Storage Safety Remarks /
Common Name / Nombre Code / eval. Date / ion Date Storage place / Lugar Sheet (SYS) / Hazardous? / Flammable / Toxic / Corrosive / Irritant / ion Gas?
Nº Trade Name / Nombre comercial Manufacturer / Fabricante Nº UN Date / Ficha de / Use / Utilización A1 A2 A3 Observaciones de seguridad para Ref Proveedor Ref PDM
común Cód. Fecha eval. / Fecha de almacenamiento Hoja Amarilla de ¿Peligroso? Inflamable Tóxico Corrosivo Irritante / ¿Gas a almacenamiento
Fecha Datos de Cantidad
Compras Mutua alta Seguridad (HAS) presión?
baja Seguridad Media
SEALING + STICKING /
6 SILICONE / SILICONA SIKAFLEX 11FC+ 01-02-08 SIKA, S.A. - 01-05-14 01-09-04 NO N.A.
Sellado + Pegado
ELECTRICAL SYSTEM /
13 NITROGEN / NITRÓGENO 01-05-14
Sistema eléctrico (Celdas)
NACELLE & HUB CLEANING HARMFUL / STORE BETWEEN 5ºC AND 40ºC
14 SOLVENT / DISOLVENTE Disolvente Universal 01-02-08 ALP PINTURAS, S.A. 1263 01-05-14 22-06-09 YES / SI X
/ Limpieza nacelle y buje NOCIVO / Almacenar entre 5ºC y 40ºC
PROTECTION MECHANIZED
17 PAINT / PINTURA Zinco Spray Talken 01-02-08 TALKEN COLOR 1950 01-05-14 31-07-12 SURFACES / Protección de YES / SI X X X N.A.
superficies mecanizadas
Degreasant /
20 GLUE / PEGAMENTO LOCTITE 7850 01-02-08 LOCTITE - 01-05-14 08-07-10 < 1 L. NO N.A.
Desengrasante
TECHNICAL DESCRIPTION
FRM-0966-EN_R07
DST-0650 Rev. 02
REVISIONS
00 15/03/2013 AO
01 10/10/2013 AO
02 19/11/2013 KB
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation
or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This
will depend on the technical and commercial circumstances. It is provided without liability and is subject to change
without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly
prohibited.
Copyright © 2013 ALSTOM. All rights reserved. ALSTOM and the logo ALSTOM and its variations are trademarks
and service trademarks of ALSTOM. Any other names mentioned are the property of their respective owners.
CONFIDENTIAL DOCUMENT DST-0650 Rev. 02
1. AIM
TABLE OF CONTENTS
This specification is a technical description of the
1. Aim .................................................................... 2 general configuration of the standard foundation of
2. Scope ................................................................. 2 ALSTOM wind turbines.
3. Foundation description....................................... 3
2. SCOPE
50 Hz
60 Hz
WT Remarks
ECO74 --
ECO80 CII --
ECO80 CIII --
ECO80 2.0 --
ECO86 --
ECO100 T90m tower with anchor bolts
ECO110 T90m tower with anchor bolts
ECO122 --
HAL150 --
3. FOUNDATION DESCRIPTION
The ALSTOM foundation design is a standard If the foundation design is made by the Client,
foundation design suitable for a range of different ALSTOM will supply the design requirements such as
soils. the loads at tower base, connection details or earthing
system.
The standard foundation is made of an octagonal slab
with variable depth of reinforced concrete and an In order to avoid issues during the service life in the
octagonal pedestal of reinforced concrete where the wind turbine, the foundation shall be able to carry the
connection to the tower is made through anchor loads at tower base, keep the stiffness at tower base
bolts. It is manufactured in situ, below the natural soil and fulfil ALSTOM requirements and local standards.
level and its configuration uses the filling soil weight
over the slab to contribute to stabilize the wind
turbine.
Fig. 1- Standard foundation for ECO 100/110 T90m with anchor bolts.
GENERAL SPECIFICATIONS
Slab concrete (C30/37) 475 m3
Pedestal concrete (C40/50) 15 m3
Levelling concrete (C20/25) 27 m3
Reinforcement (S500) Approx. 33 000 kg
Excavation 1 195 m3 1)
Backfill 710 m3 1)
ANCHOR BOLTS
Quantity 2 rows of 76 bolts
Quality 10.9
Type M36 ISO 898-1
Total length 3 000 mm
HIGH STRENGTH GROUT
Minimum comp. strength 80 MPa
EMBEDDED FLANGE
Interior diameter 3 850 mm
Exterior diameter 4 530 mm
Thickness 50 mm
Quality S355
TEMPLATE FLANGE
Interior diameter 3 890 mm
Exterior diameter 4 490 mm
Thickness 30 mm
Quality S355
Table 1- General specifications. 1) Approximate volume calculated
considering a relation 2/1 in slope walls.
Drive Train Gearbox Oil replacement 385 l Mobilgear SHC XMP 320. Contact with spare parts management
Yaw System Radial guide track greasing 3 l KLÜBER Staburags NBU 12 Altemp
Yaw System Yaw crown and pinnions greasing 1000 gr KLÜBERPLEX AG 11-462
Type of Grease and oil can change for CCV or DCV.
System Activity Quantity Units More detailed information in preventive manual
25000 gr
Generator Automatic grease feeding system inspection. BEKA-MAX OC-1 Klüber BEM 41-132 (qty needed 2kg)
1000 gr
25000 gr
Generator Bearing manual greasing Klüber BEM 41-132 (qty needed 2kg)
1000 gr
Generator Cooling system. Accumulator pressure inspection 5 l Antifreeze coolant (water-glycol 50-50 mixture) (10 l aprox)
Type of Grease and oil can change for CCV or DCV.
System Activity Quantity Units More detailed information in preventive manual
Generator Cooling system coolant Substitution 5 l Antifreeze coolant (water-glycol 50-50 mixture)
Ground Line & Lightning protection Earth conductor inspection 400 ml Conductive grease Zn -based. Zorel-Zn grease (spray)
Pitch System Crown grease refill 5 Kg KLÜBERPLEX AG 11-462 Quantity: 1kg aprox. / LPS 3
1 Kg
Type of Grease and oil can change for CCV or DCV.
System Activity Quantity Units More detailed information in preventive manual
Pitch System Bearing grease refill 170 Kg RHODINA BBZ. Re-greasing: 1560 cm3/blade
Pitch System Crown and Bearing greasing 5 Kg KLÜBERPLEX AG 11-462 Quantity: 1kg aprox. / LPS 3
Gesamthöhe ab Gelände
149,50 m
Total height above TOP Ground
Nabenhöhe ab Gelände
99,00 m
Hub height above TOP Ground
3 Stahl / steel
Anzahl der Sektionen / Number of sections
14 Beton / concrete
1
Typenprüfung vorhanden / Certification Report available
2
Typenprüfung in Arbeit / Certification Report in process
3
Flanschaußendurchmesser / outside flange diameter
1.2 Relevant identified uses of the substance or mixture and uses advised against
Use of the substance/ Gear lubricant
mixture For specific application advice see appropriate Technical Data Sheet or consult our company
representative.
Aral AG
Geschäftsbereich Schmierstoffe
Überseeallee 1
D-20457 Hamburg
Customer Service Center / Environmental Protection / Product Safety: +49 (0)40 639-52288
E-mail address MSDSadvice@bp.com
This product does not contain any hazardous ingredients at or above regulated thresholds.
4.2 Most important symptoms and effects, both acute and delayed
See Section 11 for more detailed information on health effects and symptoms.
4.3 Indication of any immediate medical attention and special treatment needed
Notes to physician Treatment should in general be symptomatic and directed to relieving any effects.
Product name Aral Degol BG 460 Product code 456206-DE04 Page: 2/9
Version 3 Date of issue 21 March 2014 Format Germany Language ENGLISH
(Germany)
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - Germany
6.2 Environmental Avoid dispersal of spilt material and runoff and contact with soil, waterways, drains and sewers.
precautions Inform the relevant authorities if the product has caused environmental pollution (sewers,
waterways, soil or air).
7.2 Conditions for safe Store in accordance with local regulations. Store in a dry, cool and well-ventilated area, away
storage, including any from incompatible materials (see Section 10). Keep away from heat and direct sunlight. Keep
incompatibilities container tightly closed and sealed until ready for use. Containers that have been opened must
be carefully resealed and kept upright to prevent leakage. Store and use only in equipment/
containers designed for use with this product. Do not store in unlabelled containers.
Not suitable Prolonged exposure to elevated temperature.
Germany - Storage code 10
Product name Aral Degol BG 460 Product code 456206-DE04 Page: 3/9
Version 3 Date of issue 21 March 2014 Format Germany Language ENGLISH
(Germany)
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - Germany
SECTION 8: Exposure controls/personal protection
No DNELs/DMELs available.
Predicted No Effect Concentration
No PNECs available
Because specific work environments and material handling practices vary, safety procedures
should be developed for each intended application. The correct choice of protective gloves
depends upon the chemicals being handled, and the conditions of work and use. Most gloves
provide protection for only a limited time before they must be discarded and replaced (even the
best chemically resistant gloves will break down after repeated chemical exposures).
Gloves should be chosen in consultation with the supplier / manufacturer and taking account of
a full assessment of the working conditions.
Breakthrough time data are generated by glove manufacturers under laboratory test conditions
and represent how long a glove can be expected to provide effective permeation resistance. It
is important when following breakthrough time recommendations that actual workplace
conditions are taken into account. Always consult with your glove supplier for up-to-date
technical information on breakthrough times for the recommended glove type.
Our recommendations on the selection of gloves are as follows:
Continuous contact:
Gloves with a minimum breakthrough time of 240 minutes, or >480 minutes if suitable gloves
can be obtained.
If suitable gloves are not available to offer that level of protection, gloves with shorter
breakthrough times may be acceptable as long as appropriate glove maintenance and
replacement regimes are determined and adhered to.
Glove Thickness:
Product name Aral Degol BG 460 Product code 456206-DE04 Page: 4/9
Version 3 Date of issue 21 March 2014 Format Germany Language ENGLISH
(Germany)
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - Germany
SECTION 8: Exposure controls/personal protection
For general applications, we recommend gloves with a thickness typically greater than 0.35 mm.
It should be emphasised that glove thickness is not necessarily a good predictor of glove
resistance to a specific chemical, as the permeation efficiency of the glove will be dependent
on the exact composition of the glove material. Therefore, glove selection should also be based
on consideration of the task requirements and knowledge of breakthrough times.
Glove thickness may also vary depending on the glove manufacturer, the glove type and the
glove model. Therefore, the manufacturers’ technical data should always be taken into account
to ensure selection of the most appropriate glove for the task.
Note: Depending on the activity being conducted, gloves of varying thickness may be required
for specific tasks. For example:
• Thinner gloves (down to 0.1 mm or less) may be required where a high degree of manual
dexterity is needed. However, these gloves are only likely to give short duration protection and
would normally be just for single use applications, then disposed of.
• Thicker gloves (up to 3 mm or more) may be required where there is a mechanical (as well
as a chemical) risk i.e. where there is abrasion or puncture potential.
Product name Aral Degol BG 460 Product code 456206-DE04 Page: 5/9
Version 3 Date of issue 21 March 2014 Format Germany Language ENGLISH
(Germany)
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - Germany
SECTION 9: Physical and chemical properties
Viscosity Kinematic: 460 mm2/s (460 cSt) at 40°C
Kinematic: 29.3 mm2/s (29.3 cSt) at 100°C
Explosive properties Not available.
Oxidising properties Not available.
10.3 Possibility of Under normal conditions of storage and use, hazardous reactions will not occur.
hazardous reactions Under normal conditions of storage and use, hazardous polymerisation will not occur.
10.4 Conditions to avoid Avoid all possible sources of ignition (spark or flame).
10.5 Incompatible materials Reactive or incompatible with the following materials: oxidising materials.
10.6 Hazardous Under normal conditions of storage and use, hazardous decomposition products should not be
decomposition products produced.
Product name Aral Degol BG 460 Product code 456206-DE04 Page: 6/9
Version 3 Date of issue 21 March 2014 Format Germany Language ENGLISH
(Germany)
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - Germany
SECTION 11: Toxicological information
Fertility effects No known significant effects or critical hazards.
However, deviation from the intended use and/or the presence of any potential contaminants may require an alternative waste
disposal code to be assigned by the end user.
Packaging
Methods of disposal Where possible, arrange for product to be recycled. Dispose of via an authorised person/
licensed waste disposal contractor in accordance with local regulations.
Waste code European waste catalogue (EWC)
15 01 10* packaging containing residues of or contaminated by dangerous substances
Special precautions This material and its container must be disposed of in a safe way. Empty containers or liners
may retain some product residues. Avoid dispersal of spilt material and runoff and contact with
soil, waterways, drains and sewers.
14.2 UN proper - - - -
shipping name
14.3 Transport - - - -
hazard class(es)
Product name Aral Degol BG 460 Product code 456206-DE04 Page: 7/9
Version 3 Date of issue 21 March 2014 Format Germany Language ENGLISH
(Germany)
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - Germany
SECTION 14: Transport information
14.4 Packing - - - -
group
14.5 No. No. No. No.
Environmental
hazards
Additional - - - -
information
15.2 Chemical Safety This product contains substances for which Chemical Safety Assessments are still required.
Assessment
The data and advice given apply when the product is sold for the stated application or applications. You should not use the
product other than for the stated application or applications without seeking advice from us.
It is the user’s obligation to evaluate and use this product safely and to comply with all applicable laws and regulations. The BP
Group shall not be responsible for any damage or injury resulting from use, other than the stated product use of the material,
from any failure to adhere to recommendations, or from any hazards inherent in the nature of the material. Purchasers of the
product for supply to a third party for use at work, have a duty to take all necessary steps to ensure that any person handling or
using the product is provided with the information in this sheet. Employers have a duty to tell employees and others who may be
affected of any hazards described in this sheet and of any precautions that should be taken.
Product name Aral Degol BG 460 Product code 456206-DE04 Page: 9/9
Version 3 Date of issue 21 March 2014 Format Germany Language ENGLISH
(Germany)
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
1.2 Relevant identified uses of the substance or mixture and uses advised against
Use of the Substance/Mixture : Anti-friction agent and lubricant
1 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
Dangerous for the environment R51/53: Toxic to aquatic organisms, may cause long-
term adverse effects in the aquatic environment.
2 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
Hazardous components
Chemical Name CAS-No. Classification Classification Concentration
EC-No. (67/548/EEC) (1272/2008/EC) [%]
Registration
number
low boiling point hydrogen 64742-49-0 F; R11 Flam. Liq. 2; H225 >= 35 - < 40
treated naphtha 265-151-9 Xi; R38 Skin Irrit. 2; H315
N; R51/53 STOT SE 3; H336
Xn; R65 Asp. Tox. 1; H304
R67 Aquatic Chronic 2;
H411
butane 106-97-8 F+; R12 Flam. Gas 1; H220 >= 1,5 - < 2
203-448-7 Press. Gas Liquefied
gas; H280
For the full text of the R-phrases mentioned in this Section, see Section 16.
For the full text of the H-Statements mentioned in this Section, see Section 16.
3 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
General advice : If you feel unwell, seek medical advice (show the label where possi-
ble). First aider needs to protect himself. Move out of dangerous
area. Never give anything by mouth to an unconscious person. Take
off contaminated clothing and shoes immediately.
If inhaled : If breathed in, move person into fresh air. In the case of inhalation of
aerosol/mist consult a physician if necessary. Keep patient warm and
at rest. If not breathing, give artificial respiration. If breathing is diffi-
cult, give oxygen.
In case of skin contact : In case of contact, immediately flush skin with soap and plenty of
water. Do NOT use solvents or thinners. If skin irritation persists, call
a physician. Wash off with polyethylene glycol and afterwards with
plenty of water.
In case of eye contact : Protect unharmed eye. If easy to do, remove contact lens, if worn. In
the case of contact with eyes, rinse immediately with plenty of water
and seek medical advice.
If swallowed : If swallowed, seek medical advice immediately and show this con-
tainer or label. If swallowed, DO NOT induce vomiting. If a person
vomits when lying on his back, place him in the recovery position.
4.2 Most important symptoms and effects, both acute and delayed
No data available
4.3 Indication of any immediate medical attention and special treatment needed
No data available
4 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
Special protective equipment for : In the event of fire, wear self-contained breathing apparatus. Use
firefighters personal protective equipment.
Further information : Standard procedure for chemical fires. Use extinguishing measures
that are appropriate to local circumstances and the surrounding envi-
ronment. In the event of fire and/or explosion do not breathe fumes.
Use water spray to cool unopened containers. Collect contaminated
fire extinguishing water separately. This must not be discharged into
drains. Fire residues and contaminated fire extinguishing water must
be disposed of in accordance with local regulations. If the tempera-
ture rises there is danger of the vessels bursting due to the high
vapor pressure.
5 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
Advice on safe handling : For personal protection see section 8. Limit the stocks at work place.
Use only in well-ventilated areas. Do not breathe vapours or spray
mist. Avoid contact with skin and eyes. Do not spray on a naked
flame or any incandescent material. Prevent the creation of flamma-
ble or explosive concentrations of vapour in air and avoid vapour
concentration higher than the occupational exposure limits. Take
precautionary measures against static discharges. Use appropriate
container to avoid environmental contamination. Do not carry cloths
that have come into contact with the product in your clothing.
Advice on protection against fire : Normal measures for preventive fire protection. Vapours are heavier
and explosion than air and may spread along floors. Vapours may form explosive
mixtures with air. Keep away from heat and sources of ignition. Do
not smoke. No sparking tools should be used. Electrical equipment
should be protected to the appropriate standard.
Advice on common storage : Keep away from food, drink and animal feedingstuffs. Do not store
together with oxidizing and self-igniting products.
6 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
Hand protection
Material : Nitrile rubber
Glove thickness : 0,45 mm
Break through time: : 480 min
7 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
Hygiene measures : Handle in accordance with good industrial hygiene and safety prac-
tice.
General industrial hygiene practice.
Do not inhale aerosol.
Avoid contact with skin, eyes and clothing.
When using do not eat, drink or smoke.
Wash hands before breaks and at the end of workday.
Follow the skin protection plan.
Take off all contaminated clothing immediately.
Wash contaminated clothing before re-use.
8 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
Active ingredient
Ignition temperature : ca. 350 °C
9 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
10.1 Reactivity
No data available
10 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
No data available
Skin corrosion/irritation
low boiling point hydrogen : Severe skin irritation
treated naphtha
11 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
Genotoxicity in vivo:
Carcinogenicity
Remarks
low boiling point hydrogen : Carcinogenicity:
treated naphtha Classified based on benzene content < 0.1% (Regulation (EC)
1272/2008, Annex VI, Part 3, Note P)
Mutagenicity:
Classified based on benzene content < 0.1% (Regulation (EC)
1272/2008, Annex VI, Part 3, Note P)
isobutane : Mutagenicity:
Tests on bacterial or mammalian cell cultures did not show mutagen-
ic effects.
12 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
Reproductive toxicity
isobutane : Note: No toxicity to reproduction
Teratogenicity
No data available
butane : NOAEL: Rat, male and female: 21,394 mg/l, 9000 ppm
Application Route: Inhalation
Exposure time: 28 d
Dose: 0 - 9000 ppm
Aspiration hazard
Aspiration toxicity
low boiling point hydrogen : May be fatal if swallowed and enters airways.
treated naphtha
Neurological effects
No data available
Toxicology Assessment
Toxicology, Metabolism, Distribution
No data available
Acute effects
No data available
13 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
12.1 Toxicity
Toxicity to fish
Toxicity to algae
Toxicity to bacteria
14 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
Ecotoxicology Assessment
15 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
16 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
RID : 1950
IMDG : 1950
IATA : 1950
14.2 Proper shipping name
ADN : AEROSOLS
ADR : AEROSOLS
RID : AEROSOLS
IMDG : AEROSOLS
(naphtha (petroleum), hydrotreated light)
IATA : AEROSOLS, FLAMMABLE
14.3 Transport hazard class(es)
ADN : 2
ADR : 2
RID : 2
IMDG : 2.1
IATA : 2.1
14.4 Packing group
ADN
Classification Code : 5F
Labels : 2.1
ADR
Classification Code : 5F
Labels : 2.1
Limited quantity : 1,00 L
Tunnel restriction code : (D)
RID
Classification Code : 5F
Hazard Identification Number : 23
Labels : 2.1
Limited quantity : 1,00 L
IMDG
Labels : 2.1
EmS Number : F-D, S-U
IATA
Packing instruction (cargo air- : 203
craft)
Packing instruction (passenger : 203
aircraft)
Packing instruction (LQ) : Y203
Labels : 2.1
14.5 Environmental hazards
ADN
17 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
ADN
Environmentally hazardous : no
ADR
Environmentally hazardous : yes
RID
Environmentally hazardous : yes
IMDG
Marine pollutant : yes
IATA
Environmentally hazardous : no
14.6 Special precautions for user
see chapter: 6, 7 and 8
14.7 Transport in bulk according to Annex II of MARPOL 73/78 and the IBC Code
Not applicable for product as supplied.
15.1 Safety, health and environmental regulations/legislation specific for the substance or mixture
Seveso II - Directive : Update: Quantity 1 Quantity 2
2003/105/EC amending Council
Directive 96/82/EC on the con-
trol of major-accident hazards
involving dangerous substances
Extremely flammable 10 t 50 t
Update:
Dangerous for the environ- 200 t 500 t
ment
Update:
Petroleum products: (a) gaso- 2.500 t 25.000 t
lines and naphthas, (b) kero-
senes (including jet fuels), (c)
gas oils (including diesel
fuels, home heating oils and
gas oil blending streams)
18 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
Other information
H Toxic by skin resorption possible; Substances, which are easily absored through the skin,
can give by additional skin resoption a substancial higher risk compared to only inhalation
by the airways.
NIOSH National Institute for Occupational Safety and Health
RF3 Contains substances which possibly affects the fertility of humans.
SSc Harm to the unborn child is not to be expected when the OEL-value is respected
The information provided in this Safety Data Sheet is correct to the best of our knowledge, information and belief
at the date of its publication. The information given is designed only as a guidance for safe handling, use,
processing, storage, transportation, disposal and release and is not to be considered a warranty or quality specifi-
cation. The information relates only to the specific material designated and may not be valid for such material
used in combination with any other materials or in any process, unless specified in the text.
19 / 20
SAFETY DATA SHEET
according to Regulation (EC) No. 1907/2006
20 / 20
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
1.2 Relevant identified uses of the substance or mixture and uses advised against
Not applicable.
Version : 2 1/11
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex AG 11-461
Classification Type
There are no additional ingredients present which, within the current knowledge of the supplier and in the
concentrations applicable, are classified as hazardous to health or the environment and hence require reporting in this
section.
Type
[1] Substance classified with a health or environmental hazard
[2] Substance with a workplace exposure limit
[3] Substance meets the criteria for PBT according to Regulation (EC) No. 1907/2006, Annex XIII
[4] Substance meets the criteria for vPvB according to Regulation (EC) No. 1907/2006, Annex XIII
Occupational exposure limits, if available, are listed in Section 8.
SECTION 4: First aid measures
4.1 Description of first aid measures
Eye contact : Immediately flush eyes with plenty of water, occasionally lifting the upper and lower
eyelids. Check for and remove any contact lenses. Get medical attention if irritation
occurs.
Inhalation : Remove victim to fresh air and keep at rest in a position comfortable for breathing.
Get medical attention if symptoms occur. In case of inhalation of decomposition
products in a fire, symptoms may be delayed. The exposed person may need to be
kept under medical surveillance for 48 hours.
Version : 2 2/11
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex AG 11-461
4.2 Most important symptoms and effects, both acute and delayed
Potential acute health effects
Eye contact : No known significant effects or critical hazards.
Inhalation : Exposure to decomposition products may cause a health hazard. Serious effects
may be delayed following exposure.
Skin contact : No known significant effects or critical hazards.
Ingestion : No known significant effects or critical hazards.
Over-exposure signs/symptoms
Eye contact : No specific data.
Inhalation : No specific data.
Skin contact : No specific data.
Ingestion : No specific data.
4.3 Indication of any immediate medical attention and special treatment needed
Notes to physician : In case of inhalation of decomposition products in a fire, symptoms may be delayed.
The exposed person may need to be kept under medical surveillance for 48 hours.
Specific treatments : No specific treatment.
Version : 2 3/11
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex AG 11-461
6.2 Environmental : Avoid dispersal of spilt material and runoff and contact with soil, waterways, drains
precautions and sewers. Inform the relevant authorities if the product has caused environmental
pollution (sewers, waterways, soil or air).
7.2 Conditions for safe : Store in accordance with local regulations. Store in original container protected from
storage, including any direct sunlight in a dry, cool and well-ventilated area, away from incompatible
incompatibilities materials (see section 10) and food and drink. Keep container tightly closed and
sealed until ready for use. Containers that have been opened must be carefully
resealed and kept upright to prevent leakage. Do not store in unlabelled containers.
Use appropriate containment to avoid environmental contamination.
Version : 2 4/11
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex AG 11-461
Recommended monitoring : If this product contains ingredients with exposure limits, personal, workplace
procedures atmosphere or biological monitoring may be required to determine the effectiveness
of the ventilation or other control measures and/or the necessity to use respiratory
protective equipment. Reference should be made to European Standard EN 689 for
methods for the assessment of exposure by inhalation to chemical agents and
national guidance documents for methods for the determination of hazardous
substances.
Derived effect levels
No DELs available.
Predicted effect concentrations
No PECs available.
Version : 2 5/11
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex AG 11-461
10.3 Possibility of : Under normal conditions of storage and use, hazardous reactions will not occur.
hazardous reactions
10.6 Hazardous : Under normal conditions of storage and use, hazardous decomposition products
decomposition products should not be produced.
Version : 2 6/11
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex AG 11-461
Version : 2 7/11
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex AG 11-461
Version : 2 8/11
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex AG 11-461
14.2 UN proper - - -
shipping name
14.3 Transport - - -
hazard class(es)
14.4 Packing - - -
group
14.5 No. No. No.
Environmental
hazards
14.6 Special Not available. Not available. Not available.
precautions for
user
Additional - - -
information
Version : 2 9/11
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex AG 11-461
15.2 Chemical Safety : This product contains substances for which Chemical Safety Assessments are still
Assessment required.
Version : 2 10/11
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex AG 11-461
Version : 2 11/11
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
1.2 Relevant identified uses of the substance or mixture and uses advised against
Not applicable.
Version : 1 1/10
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex BEM 41-141
4.2 Most important symptoms and effects, both acute and delayed
Potential acute health effects
Eye contact : No known significant effects or critical hazards.
Inhalation : No known significant effects or critical hazards.
Skin contact : No known significant effects or critical hazards.
Ingestion : No known significant effects or critical hazards.
Over-exposure signs/symptoms
Eye contact : No specific data.
Inhalation : No specific data.
Skin contact : No specific data.
Ingestion : No specific data.
4.3 Indication of any immediate medical attention and special treatment needed
Notes to physician : Treat symptomatically. Contact poison treatment specialist immediately if large
quantities have been ingested or inhaled.
Specific treatments : No specific treatment.
Version : 1 2/10
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex BEM 41-141
6.2 Environmental : Avoid dispersal of spilt material and runoff and contact with soil, waterways, drains
precautions and sewers. Inform the relevant authorities if the product has caused environmental
pollution (sewers, waterways, soil or air).
Version : 1 3/10
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex BEM 41-141
7.2 Conditions for safe : Store in accordance with local regulations. Store in original container protected from
storage, including any direct sunlight in a dry, cool and well-ventilated area, away from incompatible
incompatibilities materials (see section 10) and food and drink. Keep container tightly closed and
sealed until ready for use. Containers that have been opened must be carefully
resealed and kept upright to prevent leakage. Do not store in unlabelled containers.
Use appropriate containment to avoid environmental contamination.
Version : 1 4/10
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex BEM 41-141
10.3 Possibility of : Under normal conditions of storage and use, hazardous reactions will not occur.
hazardous reactions
Version : 1 5/10
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex BEM 41-141
10.6 Hazardous : Under normal conditions of storage and use, hazardous decomposition products
decomposition products should not be produced.
Irritation/Corrosion
Conclusion/Summary : Not available.
Sensitiser
Conclusion/Summary : Not available.
Mutagenicity
Conclusion/Summary : Not available.
Carcinogenicity
Conclusion/Summary : Not available.
Reproductive toxicity
Conclusion/Summary : Not available.
Teratogenicity
Conclusion/Summary : Not available.
Specific target organ toxicity (single exposure)
Not available.
Specific target organ toxicity (repeated exposure)
Not available.
Aspiration hazard
Not available.
Information on the likely : Not available.
routes of exposure
Potential acute health effects
Inhalation : No known significant effects or critical hazards.
Ingestion : No known significant effects or critical hazards.
Skin contact : No known significant effects or critical hazards.
Eye contact : No known significant effects or critical hazards.
Symptoms related to the physical, chemical and toxicological characteristics
Inhalation : No specific data.
Ingestion : No specific data.
Skin contact : No specific data.
Eye contact : No specific data.
Delayed and immediate effects and also chronic effects from short and long term exposure
Short term exposure
Version : 1 6/10
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex BEM 41-141
Version : 1 7/10
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex BEM 41-141
Hazardous waste : Within the present knowledge of the supplier, this product is not regarded as
hazardous waste, as defined by EU Directive 91/689/EEC.
Packaging
Methods of disposal : The generation of waste should be avoided or minimised wherever possible. Waste
packaging should be recycled. Incineration or landfill should only be considered
when recycling is not feasible.
Special precautions : This material and its container must be disposed of in a safe way. Empty containers
or liners may retain some product residues. Avoid dispersal of spilt material and
runoff and contact with soil, waterways, drains and sewers.
SECTION 14: Transport information
14.2 UN proper - - -
shipping name
14.3 Transport - - -
hazard class(es)
14.4 Packing - - -
group
14.5 No. No. No.
Environmental
hazards
14.6 Special Not available. Not available. Not available.
precautions for
user
Additional - - -
information
Version : 1 8/10
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex BEM 41-141
15.2 Chemical Safety : This product contains substances for which Chemical Safety Assessments are still
Assessment required.
Version : 1 9/10
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II - United Kingdom (UK)
Klüberplex BEM 41-141
Version : 1 10/10
Product Name: MOBIL SHC 632
Revision Date: 11 May 2012
Page 1 of 9
______________________________________________________________________________________________________________________
PRODUCT
Product Name: MOBIL SHC 632
Product Description: Synthetic Base Stocks and Additives
Product Code: 201560500560, 602987-00, 970854
Intended Use: Circulating/gear oil
COMPANY IDENTIFICATION
Supplier: EXXON MOBIL CORPORATION
3225 GALLOWS RD.
FAIRFAX, VA. 22037 USA
24 Hour Health Emergency 609-737-4411
Transportation Emergency Phone 800-424-9300
ExxonMobil Transportation No. 281-834-3296
Product Technical Information 800-662-4525, 800-947-9147
MSDS Internet Address http://www.exxon.com, http://www.mobil.com
This material is not considered to be hazardous according to regulatory guidelines (see (M)SDS Section 15).
NOTE: This material should not be used for any other purpose than the intended use in Section 1 without expert
advice. Health studies have shown that chemical exposure may cause potential human health risks which may vary
from person to person.
INHALATION
Remove from further exposure. For those providing assistance, avoid exposure to yourself or others. Use
Product Name: MOBIL SHC 632
Revision Date: 11 May 2012
Page 2 of 9
______________________________________________________________________________________________________________________
adequate respiratory protection. If respiratory irritation, dizziness, nausea, or unconsciousness occurs, seek
immediate medical assistance. If breathing has stopped, assist ventilation with a mechanical device or use
mouth-to-mouth resuscitation.
SKIN CONTACT
Wash contact areas with soap and water. If product is injected into or under the skin, or into any part of the
body, regardless of the appearance of the wound or its size, the individual should be evaluated immediately by
a physician as a surgical emergency. Even though initial symptoms from high pressure injection may be
minimal or absent, early surgical treatment within the first few hours may significantly reduce the ultimate extent
of injury.
EYE CONTACT
Flush thoroughly with water. If irritation occurs, get medical assistance.
INGESTION
First aid is normally not required. Seek medical attention if discomfort occurs.
EXTINGUISHING MEDIA
Appropriate Extinguishing Media: Use water fog, foam, dry chemical or carbon dioxide (CO2) to extinguish
flames.
FIRE FIGHTING
Fire Fighting Instructions: Evacuate area. Prevent runoff from fire control or dilution from entering streams,
sewers, or drinking water supply. Firefighters should use standard protective equipment and in enclosed
spaces, self-contained breathing apparatus (SCBA). Use water spray to cool fire exposed surfaces and to
protect personnel.
Hazardous Combustion Products: Smoke, Fume, Aldehydes, Sulfur oxides, Incomplete combustion
products, Oxides of carbon
FLAMMABILITY PROPERTIES
Flash Point [Method]: >210°C (410°F) [ASTM D-92]
Flammable Limits (Approximate volume % in air): LEL: 0.9 UEL: 7.0
Autoignition Temperature: N/D
NOTIFICATION PROCEDURES
In the event of a spill or accidental release, notify relevant authorities in accordance with all applicable
regulations. US regulations require reporting releases of this material to the environment which exceed the
applicable reportable quantity or oil spills which could reach any waterway including intermittent dry creeks. The
National Response Center can be reached at (800)424-8802.
Product Name: MOBIL SHC 632
Revision Date: 11 May 2012
Page 3 of 9
______________________________________________________________________________________________________________________
PROTECTIVE MEASURES
Avoid contact with spilled material. See Section 5 for fire fighting information. See the Hazard Identification
Section for Significant Hazards. See Section 4 for First Aid Advice. See Section 8 for advice on the minimum
requirements for personal protective equipment. Additional protective measures may be necessary, depending
on the specific circumstances and/or the expert judgment of the emergency responders.
SPILL MANAGEMENT
Land Spill: Stop leak if you can do it without risk. Recover by pumping or with suitable absorbent.
Water Spill: Stop leak if you can do it without risk. Confine the spill immediately with booms. Warn other
shipping. Remove from the surface by skimming or with suitable absorbents. Seek the advice of a specialist
before using dispersants.
Water spill and land spill recommendations are based on the most likely spill scenario for this material;
however, geographic conditions, wind, temperature, (and in the case of a water spill) wave and current direction
and speed may greatly influence the appropriate action to be taken. For this reason, local experts should be
consulted. Note: Local regulations may prescribe or limit action to be taken.
ENVIRONMENTAL PRECAUTIONS
Large Spills: Dike far ahead of liquid spill for later recovery and disposal. Prevent entry into waterways,
sewers, basements or confined areas.
HANDLING
Prevent small spills and leakage to avoid slip hazard. Material can accumulate static charges which may
cause an electrical spark (ignition source). When the material is handled in bulk, an electrical spark could
ignite any flammable vapors from liquids or residues that may be present (e.g., during switch-loading
operations). Use proper bonding and/or ground procedures. However, bonding and grounds may not
eliminate the hazard from static accumulation. Consult local applicable standards for guidance. Additional
references include American Petroleum Institute 2003 (Protection Against Ignitions Arising out of Static,
Lightning and Stray Currents) or National Fire Protection Agency 77 (Recommended Practice on Static
Electricity) or CENELEC CLC/TR 50404 (Electrostatics - Code of practice for the avoidance of hazards due to
static electricity).
STORAGE
The container choice, for example storage vessel, may effect static accumulation and dissipation. Do not store
in open or unlabelled containers.
Exposure limits/standards for materials that can be formed when handling this product: When mists/aerosols
can occur the following are recommended: 5 mg/m³ - ACGIH TLV (inhalable fraction), 5 mg/m³ - OSHA PEL.
Product Name: MOBIL SHC 632
Revision Date: 11 May 2012
Page 4 of 9
______________________________________________________________________________________________________________________
NOTE: Limits/standards shown for guidance only. Follow applicable regulations.
ENGINEERING CONTROLS
The level of protection and types of controls necessary will vary depending upon potential exposure conditions.
Control measures to consider:
No special requirements under ordinary conditions of use and with adequate ventilation.
PERSONAL PROTECTION
Personal protective equipment selections vary based on potential exposure conditions such as applications,
handling practices, concentration and ventilation. Information on the selection of protective equipment for use
with this material, as provided below, is based upon intended, normal usage.
For high airborne concentrations, use an approved supplied-air respirator, operated in positive pressure mode.
Supplied air respirators with an escape bottle may be appropriate when oxygen levels are inadequate,
gas/vapor warning properties are poor, or if air purifying filter capacity/rating may be exceeded.
Hand Protection: Any specific glove information provided is based on published literature and glove
manufacturer data. Glove suitability and breakthrough time will differ depending on the specific use conditions.
Contact the glove manufacturer for specific advice on glove selection and breakthrough times for your use
conditions. Inspect and replace worn or damaged gloves. The types of gloves to be considered for this material
include:
No protection is ordinarily required under normal conditions of use.
Eye Protection: If contact is likely, safety glasses with side shields are recommended.
Skin and Body Protection: Any specific clothing information provided is based on published literature or
manufacturer data. The types of clothing to be considered for this material include:
No skin protection is ordinarily required under normal conditions of use. In accordance with good
industrial hygiene practices, precautions should be taken to avoid skin contact.
Specific Hygiene Measures: Always observe good personal hygiene measures, such as washing after
handling the material and before eating, drinking, and/or smoking. Routinely wash work clothing and protective
equipment to remove contaminants. Discard contaminated clothing and footwear that cannot be cleaned.
Practice good housekeeping.
ENVIRONMENTAL CONTROLS
Comply with applicable environmental regulations limiting discharge to air, water and
soil. Protect the environment by applying appropriate control measures to prevent or limit
emissions.
Note: Physical and chemical properties are provided for safety, health and environmental considerations only
Product Name: MOBIL SHC 632
Revision Date: 11 May 2012
Page 5 of 9
______________________________________________________________________________________________________________________
and may not fully represent product specifications. Contact the Supplier for additional information.
GENERAL INFORMATION
Physical State: Liquid
Color: Orange
Odor: Characteristic
Odor Threshold: N/D
OTHER INFORMATION
Freezing Point: N/D
Melting Point: N/A
Pour Point: -33°C (-27°F)
ACUTE TOXICITY
Route of Exposure Conclusion / Remarks
Inhalation
Toxicity (Rat): LC50 > 5000 mg/m3 Minimally Toxic. Based on test data for structurally similar
materials.
Irritation: No end point data. Negligible hazard at ambient/normal handling temperatures.
Based on assessment of the components.
Ingestion
Product Name: MOBIL SHC 632
Revision Date: 11 May 2012
Page 6 of 9
______________________________________________________________________________________________________________________
Toxicity (Rat): LD50 > 5000 mg/kg Minimally Toxic. Based on test data for structurally similar
materials.
Skin
Toxicity (Rabbit): LD50 > 5000 mg/kg Minimally Toxic. Based on test data for structurally similar
materials.
Irritation (Rabbit): Data available. Negligible irritation to skin at ambient temperatures. Based on test
data for structurally similar materials.
Eye
Irritation (Rabbit): Data available. May cause mild, short-lasting discomfort to eyes. Based on test
data for structurally similar materials.
CHRONIC/OTHER EFFECTS
Contains:
Synthetic base oils: Not expected to cause significant health effects under conditions of normal use, based on
laboratory studies with the same or similar materials. Not mutagenic or genotoxic. Not sensitizing in test
animals and humans.
The information given is based on data available for the material, the components of the material, and similar
materials.
ECOTOXICITY
Material -- Not expected to be harmful to aquatic organisms.
Material -- Not expected to demonstrate chronic toxicity to aquatic organisms.
MOBILITY
Base oil component -- Low solubility and floats and is expected to migrate from water to the land.
Expected to partition to sediment and wastewater solids.
______________________________________________________________________________________________________________________
Disposal recommendations based on material as supplied. Disposal must be in accordance with current applicable
laws and regulations, and material characteristics at time of disposal.
DISPOSAL RECOMMENDATIONS
Product is suitable for burning in an enclosed controlled burner for fuel value or disposal by supervised
incineration at very high temperatures to prevent formation of undesirable combustion products. Protect the
environment. Dispose of used oil at designated sites. Minimize skin contact. Do not mix used oils with solvents,
brake fluids or coolants.
Empty Container Warning Empty Container Warning (where applicable): Empty containers may contain residue and
can be dangerous. Do not attempt to refill or clean containers without proper instructions. Empty drums should be
completely drained and safely stored until appropriately reconditioned or disposed. Empty containers should be taken
for recycling, recovery, or disposal through suitably qualified or licensed contractor and in accordance with
governmental regulations. DO NOT PRESSURISE, CUT, WELD, BRAZE, SOLDER, DRILL, GRIND, OR EXPOSE
SUCH CONTAINERS TO HEAT, FLAME, SPARKS, STATIC ELECTRICITY, OR OTHER SOURCES OF IGNITION.
THEY MAY EXPLODE AND CAUSE INJURY OR DEATH.
OSHA HAZARD COMMUNICATION STANDARD: When used for its intended purposes, this material is not
classified as hazardous in accordance with OSHA 29 CFR 1910.1200.
Inventory Status
AICS Restrictions Apply
ELINCS Restrictions Apply
KECI Restrictions Apply
Product Name: MOBIL SHC 632
Revision Date: 11 May 2012
Page 8 of 9
______________________________________________________________________________________________________________________
EPCRA: This material contains no extremely hazardous substances.
SARA (313) TOXIC RELEASE INVENTORY: This material contains no chemicals subject to the supplier notification
requirements of the SARA 313 Toxic Release Program.
______________________________________________________________________________________________________________________
Section 14: LAND (TDG) - Header was modified.
Section 14: LAND (DOT) - Header was modified.
Section 15: List Citation Table - Header was modified.
Section 14: LAND (DOT) - Default was modified.
Section 14: LAND (TDG) Default was modified.
Section 14: Sea (IMDG) - Default was modified.
Section 14: Air (IATA) - Default was modified.
Section 15: National Chemical Inventory Listing - Header was modified.
Section 15: National Chemical Inventory Listing was modified.
Section 08: Exposure limits/standards was modified.
Section 15: Special Cases Table was modified.
Hazard Identification: OSHA - May be Hazardous Statement was modified.
Section 09: Oxidizing Properties was modified.
Section 06: Protective Measures was added.
Section 06: Accidental Release - Protective Measures - Header was added.
Section 09: DMSO IP was deleted.
Section 09: DMSO IP - Header was deleted.
------------------------------------------------------------------------------------------------------- ----------------------------------------------
----------------------------------------------------------------------------------------------------------------------------- ------------------------
The information and recommendations contained herein are, to the best of ExxonMobil's knowledge and belief, accurate
and reliable as of the date issued. You can contact ExxonMobil to insure that this document is the most current
available from ExxonMobil. The information and recommendations are offered for the user's consideration and
examination. It is the user's responsibility to satisfy itself that the product is suitable for the intended use. If buyer
repackages this product, it is the user's responsibility to insure proper health, safety and other necessary information is
included with and/or on the container. Appropriate warnings and safe-handling procedures should be provided to
handlers and users. Alteration of this document is strictly prohibited. Except to the extent required by law,
re-publication or retransmission of this document, in whole or in part, is not permitted. The term, "ExxonMobil" is used
for convenience, and may include any one or more of ExxonMobil Chemical Company, Exxon Mobil Corporation, or any
affiliates in which they directly or indirectly hold any interest.
----------------------------------------------------------------------------------------------------------------------------- ------------------------
_____________________________________________________________________________________________________________________
As of the revision date above, this (M)SDS meets the regulations in the United Kingdom & Ireland.
1.2. RELEVANT IDENTIFIED USES OF THE SUBSTANCE OR MIXTURE AND USES ADVISED AGAINST
Intended Use: Grease
E-Mail: sds.uk@exxonmobil.com
Supplier / Registrant: (BE) 32 35433111
Not Classified
Product Name: MOBILGEAR OGL 461
Revision Date: 20 Dec 2012
Page 2 of 13
_____________________________________________________________________________________________________________________
2.2. LABEL ELEMENTS
.
.
HEALTH HAZARDS
Excessive exposure may result in eye, skin, or respiratory irritation. High-pressure injection under skin may
cause serious damage.
ENVIRONMENTAL HAZARDS
No significant hazards. Material does not meet the criteria for PBT or vPvB in accordance with REACH Annex
XIII.
NOTE: This material should not be used for any other purpose than the intended use in Section 1 without expert
advice. Health studies have shown that chemical exposure may cause potential human health risks which may
vary from person to person.
3.2. MIXTURES
Reportable hazardous substance(s) complying with the classification criteria and/or with an exposure limit
(OEL)
Name CAS# EC# Registration# Concentration* GHS/CLP
classification
GRAPHITE 7782-42-5 231-955-3 NE 5 - 10% OEL
SULFURIZED OLEFIN Confidential NE 1 - 5% [Aquatic Acute 3 H402],
Aquatic Chronic 3 H412,
[Flam. Liq. 4 H227]
ZINC DINONYLNAPHTHALENE 28016-00-4 248-778-2 NE 0.1 - 1% Skin Irrit. 2 H315,
SULPHONATE Eye Irrit. 2 H319,
Skin Sens. 1 H317
ZINC DITHIOPHOSPHATE 68649-42-3 272-028-3 NE 1 - 2.5% Skin Irrit. 2 H315,
Eye Dam. 1 H318,
[Aquatic Acute 2 H401],
Aquatic Chronic 2 H411
Note - any classification in brackets is a GHS building block that was not adopted by the EU in the CLP regulation (No 1272/2008)
Product Name: MOBILGEAR OGL 461
Revision Date: 20 Dec 2012
Page 3 of 13
_____________________________________________________________________________________________________________________
and therefore is not applicable in the EU or in non-EU countries which have implemented the CLP regulation and is shown for
informational purposes only.
* All concentrations are percent by weight unless ingredient is a gas. Gas concentrations are in percent by volume.
Note: See (M)SDS Section 16 for full text of the R-Phrases. See (M)SDS Section 16 for full text of hazard
statements.
INHALATION
Under normal conditions of intended use, this material is not expected to be an inhalation hazard.
SKIN CONTACT
Wash contact areas with soap and water. If product is injected into or under the skin, or into any part of the
body, regardless of the appearance of the wound or its size, the individual should be evaluated immediately by
a physician as a surgical emergency. Even though initial symptoms from high pressure injection may be
minimal or absent, early surgical treatment within the first few hours may significantly reduce the ultimate extent
of injury.
EYE CONTACT
Flush thoroughly with water. If irritation occurs, get medical assistance.
INGESTION
First aid is normally not required. Seek medical attention if discomfort occurs.
4.2. MOST IMPORTANT SYMPTOMS AND EFFECTS, BOTH ACUTE AND DELAYED
Local necrosis as evidenced by delayed onset of pain and tissue damage a few hours after injection.
4.3. INDICATION OF ANY IMMEDIATE MEDICAL ATTENTION AND SPECIAL TREATMENT NEEDED
The need to have special means for providing specific and immediate medical treatment available in the
workplace is not expected.
_____________________________________________________________________________________________________________________
FLAMMABILITY PROPERTIES
Flash Point [Method]: >204°C (400°F) [EST. FOR OIL, ASTM D-92 (COC)]
Upper/Lower Flammable Limits (Approximate volume % in air): UEL: No data available LEL: No
data available
Autoignition Temperature: No data available
NOTIFICATION PROCEDURES
In the event of a spill or accidental release, notify relevant authorities in accordance with all applicable
regulations.
PROTECTIVE MEASURES
Avoid contact with spilled material. See Section 5 for fire fighting information. See the Hazard
Identification Section for Significant Hazards. See Section 4 for First Aid Advice. See Section 8 for
advice on the minimum requirements for personal protective equipment. Additional protective measures
may be necessary, depending on the specific circumstances and/or the expert judgment of the emergency
responders.
For emergency responders: Respiratory protection: respiratory protection will be necessary only in special
cases, e.g., formation of mists. Half-face or full-face respirator with filter(s) for dust/organic vapor or Self
Contained Breathing Apparatus (SCBA) can be used depending on the size of spill and potential level of
exposure. If the exposure cannot be completely characterized or an oxygen deficient atmosphere is
possible or anticipated, SCBA is recommended. Work gloves that are resistant to hydrocarbons are
recommended. Gloves made of polyvinyl acetate (PVA) are not water-resistant and are not suitable for
emergency use. Chemical goggles are recommended if splashes or contact with eyes is possible. Small
spills: normal antistatic work clothes are usually adequate. Large spills: full body suit of chemical resistant,
antistatic material is recommended.
Water Spill: Stop leak if you can do so without risk. Confine the spill immediately with booms. Warn other
Product Name: MOBILGEAR OGL 461
Revision Date: 20 Dec 2012
Page 5 of 13
_____________________________________________________________________________________________________________________
shipping. Skim from surface
Water spill and land spill recommendations are based on the most likely spill scenario for this material;
however, geographic conditions, wind, temperature, (and in the case of a water spill) wave and current direction
and speed may greatly influence the appropriate action to be taken. For this reason, local experts should be
consulted. Note: Local regulations may prescribe or limit action to be taken.
7.3. SPECIFIC END USES: Section 1 informs about identified end-uses. No industrial or sector specific guidance
available.
Note: Information about recommended monitoring procedures can be obtained from the relevant
agency(ies)/institute(s):
UK Health and Safety Executive (HSE)
Product Name: MOBILGEAR OGL 461
Revision Date: 20 Dec 2012
Page 6 of 13
_____________________________________________________________________________________________________________________
8.2. EXPOSURE CONTROLS
ENGINEERING CONTROLS
The level of protection and types of controls necessary will vary depending upon potential exposure conditions.
Control measures to consider:
No special requirements under ordinary conditions of use and with adequate ventilation.
PERSONAL PROTECTION
Personal protective equipment selections vary based on potential exposure conditions such as applications,
handling practices, concentration and ventilation. Information on the selection of protective equipment for use
with this material, as provided below, is based upon intended, normal usage.
For high airborne concentrations, use an approved supplied-air respirator, operated in positive pressure mode.
Supplied air respirators with an escape bottle may be appropriate when oxygen levels are inadequate,
gas/vapour warning properties are poor, or if air purifying filter capacity/rating may be exceeded.
Hand Protection: Any specific glove information provided is based on published literature and glove
manufacturer data. Glove suitability and breakthrough time will differ depending on the specific use conditions.
Contact the glove manufacturer for specific advice on glove selection and breakthrough times for your use
conditions. Inspect and replace worn or damaged gloves. The types of gloves to be considered for this material
include:
No protection is ordinarily required under normal conditions of use.
Eye Protection: If contact is likely, safety glasses with side shields are recommended.
Skin and Body Protection: Any specific clothing information provided is based on published literature or
manufacturer data. The types of clothing to be considered for this material include:
No skin protection is ordinarily required under normal conditions of use. In accordance with good
industrial hygiene practices, precautions should be taken to avoid skin contact.
Specific Hygiene Measures: Always observe good personal hygiene measures, such as washing after
handling the material and before eating, drinking, and/or smoking. Routinely wash work clothing and protective
equipment to remove contaminants. Discard contaminated clothing and footwear that cannot be cleaned.
Practice good housekeeping.
Product Name: MOBILGEAR OGL 461
Revision Date: 20 Dec 2012
Page 7 of 13
_____________________________________________________________________________________________________________________
ENVIRONMENTAL CONTROLS
Comply with applicable environmental regulations limiting discharge to air, water and
soil. Protect the environment by applying appropriate control measures to prevent or limit
emissions.
Note: Physical and chemical properties are provided for safety, health and environmental considerations only
and may not fully represent product specifications. Contact the Supplier for additional information.
NOTE: Most physical properties above are for the oil component in the material.
Product Name: MOBILGEAR OGL 461
Revision Date: 20 Dec 2012
Page 8 of 13
_____________________________________________________________________________________________________________________
10.6. HAZARDOUS DECOMPOSITION PRODUCTS: Material does not decompose at ambient temperatures.
_____________________________________________________________________________________________________________________
material.
Repeated Exposure: No end point data for Not expected to cause organ damage from prolonged or repeated
material. exposure. Based on assessment of the components.
TOXICITY FOR SUBSTANCES
NAME ACUTE TOXICITY
ZINC DITHIOPHOSPHATE Dermal Lethality: LD50 > 2000 mg/kg (Rabbit); Oral Lethality: LD50
> 2000 mg/kg (Rat)
OTHER INFORMATION
Contains:
Base oil severely refined: Not carcinogenic in animal studies. Representative material passes IP-346, Modified Ames
test, and/or other screening tests. Dermal and inhalation studies showed minimal effects; lung non-specific infiltration of
immune cells, oil deposition and minimal granuloma formation. Not sensitising in test animals. Graphite: May contain
crystalline silica. Certain grades have produced lung tumours in animal studies and also exposed humans. Airborne
exposure to high concentrations have resulted in pneumoconiosis in humans.
12.1. TOXICITY
Material -- Not expected to be harmful to aquatic organisms.
_____________________________________________________________________________________________________________________
Disposal recommendations based on material as supplied. Disposal must be in accordance with current applicable
laws and regulations, and material characteristics at time of disposal.
NOTE: These codes are assigned based upon the most common uses for this material and may not reflect
contaminants resulting from actual use. Waste producers need to assess the actual process used when
generating the waste and its contaminants in order to assign the proper waste disposal code(s).
This material is considered as hazardous waste pursuant to Directive 91/689/EEC on hazardous waste, and
subject to the provisions of that Directive unless Article 1(5) of that Directive applies.
Empty Container Warning Empty Container Warning (where applicable): Empty containers may contain residue and
can be dangerous. Do not attempt to refill or clean containers without proper instructions. Empty drums should be
completely drained and safely stored until appropriately reconditioned or disposed. Empty containers should be taken
for recycling, recovery, or disposal through suitably qualified or licensed contractor and in accordance with
governmental regulations. DO NOT PRESSURISE, CUT, WELD, BRAZE, SOLDER, DRILL, GRIND, OR EXPOSE
SUCH CONTAINERS TO HEAT, FLAME, SPARKS, STATIC ELECTRICITY, OR OTHER SOURCES OF IGNITION.
THEY MAY EXPLODE AND CAUSE INJURY OR DEATH.
INLAND WATERWAYS (ADNR/ADN): 14.1-14.6 Not Regulated for Inland Waterways Transport
SEA (IMDG): 14.1-14.6 Not Regulated for Sea Transport according to IMDG-Code
_____________________________________________________________________________________________________________________
SECTION 15 REGULATORY INFORMATION
Complies with the following national/regional chemical inventory requirements: AICS, IECSC, PICCS,
TSCA
Special Cases:
Inventory Status
ENCS Restrictions Apply
NDSL Restrictions Apply
1907/2006 [... on the Registration, Evaluation, Authorisation and Restriction of Chemicals ... and
amendments thereto]
689/2008/EC [....concerning the export and import of dangerous substances and amendments
thereto]
1272/2008 [on classification, labelling and packaging of substances and mixtures.. and
amendments thereto]
Refer to the relevant EU/national regulation for details of any actions or restrictions required by the above
Regulation(s)/Directive(s).
REACH Information: A Chemical Safety Assessment has been carried out for one or more substances present in the
material.
REFERENCES: Sources of information used in preparing this SDS included one or more of the following: results
from in house or supplier toxicology studies, CONCAWE Product Dossiers, publications from other trade associations,
such as the EU Hydrocarbon Solvents REACH Consortium, U.S. HPV Program Robust Summaries, the EU IUCLID
Data Base, U.S. NTP publications, and other sources, as appropriate.
Product Name: MOBILGEAR OGL 461
Revision Date: 20 Dec 2012
Page 12 of 13
_____________________________________________________________________________________________________________________
List of abbreviations and acronyms that could be (but not necessarily are) used in this safety data sheet:
Acronym Full text
N/A Not applicable
N/D Not determined
NE Not established
VOC Volatile Organic Compound
AICS Australian Inventory of Chemical Substances
AIHA WEEL American Industrial Hygiene Association Workplace Environmental Exposure Limits
ASTM ASTM International, originally known as the American Society for Testing and Materials (ASTM)
DSL Domestic Substance List (Canada)
EINECS European Inventory of Existing Commercial Substances
ELINCS European List of Notified Chemical Substances
ENCS Existing and new Chemical Substances (Japanese inventory)
IECSC Inventory of Existing Chemical Substances in China
KECI Korean Existing Chemicals Inventory
NDSL Non-Domestic Substances List (Canada)
NZIoC New Zealand Inventory of Chemicals
PICCS Philippine Inventory of Chemicals and Chemical Substances
TLV Threshold Limit Value (American Conference of Governmental Industrial Hygienists)
TSCA Toxic Substances Control Act (U.S. inventory)
UVCB Substances of Unknown or Variable composition, Complex reaction products or Biological materials
LC Lethal Concentration
LD Lethal Dose
LL Lethal Loading
EC Effective Concentration
EL Effective Loading
NOEC No Observable Effect Concentration
NOELR No Observable Effect Loading Rate
KEY TO THE RISK CODES CONTAINED IN SECTION 2 AND 3 OF THIS DOCUMENT (for information only):
R38; Irritating to skin.
R41; Risk of serious damage to eyes.
R51/53; Toxic to aquatic organisms, may cause long-term adverse effects in the aquatic environment.
R52/53; Harmful to aquatic organisms, may cause long-term adverse effects in the aquatic environment.
KEY TO THE H-CODES CONTAINED IN SECTION 3 OF THIS DOCUMENT (for information only):
[Flam. Liq. 4 H227]: Combustible liquid; Flammable Liquid, Cat 4
Skin Irrit. 2 H315: Causes skin irritation; Skin Corr/Irritation, Cat 2
Skin Sens. 1 H317: May cause allergic skin reaction; Skin Sensitization, Cat 1
Eye Dam. 1 H318: Causes serious eye damage; Serious Eye Damage/Irr, Cat 1
Eye Irrit. 2 H319: Causes serious eye irritation; Serious Eye Damage/Irr, Cat 2
[Aquatic Acute 2 H401]: Toxic to aquatic life; Acute Env Tox, Cat 2
[Aquatic Acute 3 H402]: Harmful to aquatic life; Acute Env Tox, Cat 3
Aquatic Chronic 2 H411: Toxic to aquatic life with long lasting effects; Chronic Env Tox, Cat 2
Aquatic Chronic 3 H412: Harmful to aquatic life with long lasting effects; Chronic Env Tox, Cat 3
-----------------------------------------------------------------------------------------------------------------------------------------------------
Product Name: MOBILGEAR OGL 461
Revision Date: 20 Dec 2012
Page 13 of 13
_____________________________________________________________________________________________________________________
The information and recommendations contained herein are, to the best of ExxonMobil's knowledge and belief, accurate
and reliable as of the date issued. You can contact ExxonMobil to insure that this document is the most current
available from ExxonMobil. The information and recommendations are offered for the user's consideration and
examination. It is the user's responsibility to satisfy itself that the product is suitable for the intended use. If buyer
repackages this product, it is the user's responsibility to insure proper health, safety and other necessary information is
included with and/or on the container. Appropriate warnings and safe-handling procedures should be provided to
handlers and users. Alteration of this document is strictly prohibited. Except to the extent required by law,
re-publication or retransmission of this document, in whole or in part, is not permitted. The term, "ExxonMobil" is used
for convenience, and may include any one or more of ExxonMobil Chemical Company, Exxon Mobil Corporation, or any
affiliates in which they directly or indirectly hold any interest.
-----------------------------------------------------------------------------------------------------------------------------------------------------
DGN: 2008935XGB
(550304)---------------------------------------------------------------------------------------------------------------------------------------------------
--
ANNEX
Annex not required for this material.
Conforms to Regulation (EC) No. 1907/2006 (REACH), Annex II
Nytro Taurus
SAFETY DATA SHEET
Annex I Nota L applies to the base oil(s) in this product. Nota L - The classification as a carcinogen need not apply if it
can be shown that the substance contains less than 3 % DMSO extract as measured by IP 346.
Type
[1] Substance classified with a health or environmental hazard
[2] Substance with a workplace exposure limit
[3] Substance meets the criteria for PBT according to Regulation (EC) No. 1907/2006, Annex XIII
[4] Substance meets the criteria for vPvB according to Regulation (EC) No. 1907/2006, Annex XIII
Accidental high pressure injection through the skin requires immediate medical
attention. Do not wait for symptoms to develop.
Ingestion Always assume that aspiration has occurred. Do not induce vomiting as there is high
risk of aspiration. Never give anything by mouth to an unconscious person. Seek
professional medical attention or send the casualty to a hospital. Do not wait for
symptoms to develop.
Protection of first-aiders No action shall be taken involving any personal risk or without suitable training.
Before attempting to rescue casualties, isolate area from all potential sources of
ignition including disconnecting electrical supply. Ensure adequate ventilation and
check that a safe, breathable atmosphere is present before entry into confined
spaces.
4.2 Most important symptoms and effects, both acute and delayed
Potential acute health effects
Eye contact Eye contact may cause redness and transient pain.
Inhalation Inhalation of vapours may cause headache, nausea, vomiting and an altered state of
consciousness.
4.3 Indication of any immediate medical attention and special treatment needed
Notes to physician Due to low viscosity there is a risk of aspiration if the product enters the lungs.
Ingestion (swallowing) of this material may result in an altered state of
consciousness and loss of coordination. Treat symptomatically.
Unsuitable extinguishing Do not use direct water jets on the burning product; they could cause splattering and
media spread the fire. Simultaneous use of foam and water on the same surface is to be
avoided as water destroys the foam.
Note : recommended measures are based on the most likely spillage scenarios for
this material; however, local conditions (wind, air temperature, wave/current direction
and speed) may significantly influence the choice of appropriate actions. For this
reason, local experts should be consulted when necessary. Local regulations may
also prescribe or limit actions to be taken.
For emergency responders Small spillages: normal antistatic working clothes are usually adequate.
Large spillages: full body suit of chemically resistant and thermal resistant material
should be used. Work gloves providing adequate chemical resistance, specifically to
aromatic hydrocarbons. Note : gloves made of PVA are not water-resistant, and are
not suitable for emergency use. Safety helmet, antistatic non-skid safety shoes or
boots. Goggles and /or face shield, if splashes or contact with eyes is possible or
anticipated.
Respiratory protection : A half or full-face respirator with filter(s) for organic vapours
(and when applicable for H2S) a Self Contained Breathing Apparatus (SCBA) can be
used according to the extent of spill and predictable amount of exposure. If the
situation cannot be completely assessed, or if an oxygen deficiency is possible, only
SCBA’s should be used.
6.2 Environmental precautions Prevent product from entering sewers, rivers or other bodies of water. If necessary
dike the product with dry earth, sand or similar non-combustible materials. In case of
soil contamination, remove contaminated soil and treat in accordance with local
regulations. In case of small spillages in closed waters (i.e. ports), contain product
with floating barriers or other equipment. Collect spilled product by absorbing with
specific floating absorbents.
If possible, large spillages in open waters should be contained with floating barriers
or other mechanical means. If this is not possible, control the spreading of the
spillage, and collect the product by skimming or other suitable mechanical means.
The use of dispersants should be advised by an expert, and, if required, approved by
local authorities.
Prevent the risk of slipping. Take precautionary measures against static discharge.
Avoid splash filling of bulk volumes when handling hot liquid product.
Note: see section 8 for personal protective equipment and section 13 for waste
disposal.
Advice on general Ensure that proper housekeeping measures are in place. Contaminated materials
occupational hygiene should not be allowed to accumulate in the workplaces and should never be kept
inside the pockets. Eating, drinking and smoking should be prohibited in areas where
this material is handled, stored and processed. Wash hands thoroughly after
handling. Change contaminated clothes at the end of working shift.
7.2 Conditions for safe Storage area layout, tank design, equipment and operating procedures must comply
storage, including any with the relevant European, national or local legislation. Storage installations should
incompatibilities be designed with adequate bunds in case of leaks or spills. Cleaning, inspection and
maintenance of internal structure of storage tanks must be done only by properly
equipped and qualified personnel as defined by national, local or company
regulations.
Recommended materials for containers, or container linings use mild steel, stainless
steel. Not suitable : Some synthetic materials may be unsuitable for containers or
container linings depending on the material specification and intended use.
Compatibility should be checked with the manufacturer.
Keep only in the original container or in a suitable container for this kind of product.
Keep containers tightly closed and properly labelled. Protect from sunlight. Empty
containers may contain harmful, flammable/combustible or explosive residue or
vapours. Do not cut, grind, drill, weld, reuse or dispose of containers unless
adequate precautions are taken against these hazards.
Recommended monitoring If this product contains ingredients with exposure limits, personal, workplace
procedures atmosphere or biological monitoring may be required to determine the effectiveness
of the ventilation or other control measures and/or the necessity to use respiratory
protective equipment. Reference should be made to European Standard EN 689 for
methods for the assessment of exposure by inhalation to chemical agents and
national guidance documents for methods for the determination of hazardous
substances.
Hand protection Wear oil-resistant protective gloves (e.g. nitril rubber). PVC gloves. Neoprene
gloves.
Body protection Wear protective clothing if there is a risk of skin contact. Change contaminated
clothes at the end of working shift.
Other skin protection Appropriate footwear and any additional skin protection measures should be
selected based on the task being performed and the risks involved and should be
approved by a specialist before handling this product.
Respiratory protection Respirator selection must be based on known or anticipated exposure levels, the
hazards of the product and the safe working limits of the selected respirator. Use a
properly fitted, particulate filter respirator complying with an approved standard if a
risk assessment indicates this is necessary.
Environmental exposure Emissions from ventilation or work process equipment should be checked to ensure
controls they comply with the requirements of environmental protection legislation. In some
cases, fume scrubbers, filters or engineering modifications to the process
equipment will be necessary to reduce emissions to acceptable levels.
10.3 Possibility of hazardous Under normal conditions of storage and use, hazardous reactions will not occur.
reactions Incomplete combustion is likely to give rise to a complex mixture of airborne solid
and liquid particulates, gases, including carbon monoxide, H2S, SOx (sulfur oxides)
or sulfuric acid and unidentified organic and inorganic compounds.
10.5 Incompatible materials Keep away from extreme heat and oxidizing agents.
10.6 Hazardous Under normal conditions of storage and use, hazardous decomposition products
decomposition products should not be produced. Incomplete combustion is likely to give rise to a complex
mixture of airborne solid and liquid particulates, gases, including carbon monoxide,
H2S, SOx (sulfur oxides) or sulfuric acid and unidentified organic and inorganic
compounds.
3.2. Mixtures
Chemical characterization
mineral oil. Additive
Hazardous components
EC No Chemical name Quantity
CAS No Classification
Index No GHS classification
REACH No
Petroleumdestillat 0,1-1 %
Xn - Harmful, N - Dangerous for the environment R51-53-65-66
10.1. Reactivity
No information available.
10.2. Chemical stability
No information available.
10.3. Possibility of hazardous reactions
No known hazardous reactions.
10.4. Conditions to avoid
No information available.
10.5. Incompatible materials
No information available.
10.6. Hazardous decomposition products
No known hazardous decomposition products.
15.1. Safety, health and environmental regulations/legislation specific for the substance or mixture
EU regulatory information
Additional information
No marking required according to 1999/45/EC, appendix V B, No. 9.
National regulatory information
Water contaminating class (D): 1 - slightly water contaminating
15.2. Chemical safety assessment
For this substance a chemical safety assessment has not been carried out.
(The data for the hazardous ingredients were taken respectively from the last version of the sub-contractor's safety
data sheet.)
______________________________________________________________________________________________________________________
PRODUCT
Product Name: UNIREX N 2
Product Description: Base Oil and Additives
Product Code: 2015A0207220, 644351-00, 97N713
Intended Use: Grease
COMPANY IDENTIFICATION
Supplier: EXXON MOBIL CORPORATION
3225 GALLOWS RD.
FAIRFAX, VA. 22037 USA
24 Hour Health Emergency 609-737-4411
Transportation Emergency Phone 800-424-9300
ExxonMobil Transportation No. 281-834-3296
Product Technical Information 800-662-4525, 800-947-9147
MSDS Internet Address http://www.exxon.com, http://www.mobil.com
This material is not considered to be hazardous according to regulatory guidelines (see (M)SDS Section 15).
NOTE: This material should not be used for any other purpose than the intended use in Section 1 without expert
advice. Health studies have shown that chemical exposure may cause potential human health risks which may vary
from person to person.
INHALATION
Under normal conditions of intended use, this material is not expected to be an inhalation hazard.
Product Name: UNIREX N 2
Revision Date: 09 Apr 2013
Page 2 of 9
______________________________________________________________________________________________________________________
SKIN CONTACT
Wash contact areas with soap and water. If product is injected into or under the skin, or into any part of the
body, regardless of the appearance of the wound or its size, the individual should be evaluated immediately by
a physician as a surgical emergency. Even though initial symptoms from high pressure injection may be
minimal or absent, early surgical treatment within the first few hours may significantly reduce the ultimate extent
of injury.
EYE CONTACT
Flush thoroughly with water. If irritation occurs, get medical assistance.
INGESTION
First aid is normally not required. Seek medical attention if discomfort occurs.
EXTINGUISHING MEDIA
Appropriate Extinguishing Media: Use water fog, foam, dry chemical or carbon dioxide (CO2) to extinguish
flames.
FIRE FIGHTING
Fire Fighting Instructions: Evacuate area. Prevent runoff from fire control or dilution from entering streams,
sewers, or drinking water supply. Firefighters should use standard protective equipment and in enclosed
spaces, self-contained breathing apparatus (SCBA). Use water spray to cool fire exposed surfaces and to
protect personnel.
Hazardous Combustion Products: Smoke, Fume, Aldehydes, Sulfur oxides, Incomplete combustion
products, Oxides of carbon
FLAMMABILITY PROPERTIES
Flash Point [Method]: >200°C (392°F) [EST. FOR OIL, ASTM D-92 (COC)]
Flammable Limits (Approximate volume % in air): LEL: N/D UEL: N/D
Autoignition Temperature: N/D
NOTIFICATION PROCEDURES
In the event of a spill or accidental release, notify relevant authorities in accordance with all applicable
regulations. US regulations require reporting releases of this material to the environment which exceed the
applicable reportable quantity or oil spills which could reach any waterway including intermittent dry creeks. The
National Response Center can be reached at (800)424-8802.
PROTECTIVE MEASURES
Avoid contact with spilled material. See Section 5 for fire fighting information. See the Hazard Identification
Section for Significant Hazards. See Section 4 for First Aid Advice. See Section 8 for advice on the minimum
Product Name: UNIREX N 2
Revision Date: 09 Apr 2013
Page 3 of 9
______________________________________________________________________________________________________________________
requirements for personal protective equipment. Additional protective measures may be necessary, depending
on the specific circumstances and/or the expert judgment of the emergency responders.
For emergency responders: Respiratory protection: respiratory protection will be necessary only in special
cases, e.g., formation of mists. Half-face or full-face respirator with filter(s) for dust/organic vapor or Self
Contained Breathing Apparatus (SCBA) can be used depending on the size of spill and potential level of
exposure. If the exposure cannot be completely characterized or an oxygen deficient atmosphere is possible
or anticipated, SCBA is recommended. Work gloves that are resistant to hydrocarbons are recommended.
Gloves made of polyvinyl acetate (PVA) are not water-resistant and are not suitable for emergency use.
Chemical goggles are recommended if splashes or contact with eyes is possible. Small spills: normal antistatic
work clothes are usually adequate. Large spills: full body suit of chemical resistant, antistatic material is
recommended.
SPILL MANAGEMENT
Land Spill: Scrape up spilled material with shovels into a suitable container for recycle or disposal.
Water Spill: Stop leak if you can do it without risk. Confine the spill immediately with booms. Warn other
shipping. Skim from surface.
Water spill and land spill recommendations are based on the most likely spill scenario for this material;
however, geographic conditions, wind, temperature, (and in the case of a water spill) wave and current direction
and speed may greatly influence the appropriate action to be taken. For this reason, local experts should be
consulted. Note: Local regulations may prescribe or limit action to be taken.
ENVIRONMENTAL PRECAUTIONS
Prevent entry into waterways, sewers, basements or confined areas.
HANDLING
Prevent small spills and leakage to avoid slip hazard.
STORAGE
Do not store in open or unlabelled containers. Keep away from incompatible materials.
ENGINEERING CONTROLS
The level of protection and types of controls necessary will vary depending upon potential exposure conditions.
Control measures to consider:
Product Name: UNIREX N 2
Revision Date: 09 Apr 2013
Page 4 of 9
______________________________________________________________________________________________________________________
No special requirements under ordinary conditions of use and with adequate ventilation.
PERSONAL PROTECTION
Personal protective equipment selections vary based on potential exposure conditions such as applications,
handling practices, concentration and ventilation. Information on the selection of protective equipment for use
with this material, as provided below, is based upon intended, normal usage.
For high airborne concentrations, use an approved supplied-air respirator, operated in positive pressure mode.
Supplied air respirators with an escape bottle may be appropriate when oxygen levels are inadequate,
gas/vapor warning properties are poor, or if air purifying filter capacity/rating may be exceeded.
Hand Protection: Any specific glove information provided is based on published literature and glove
manufacturer data. Glove suitability and breakthrough time will differ depending on the specific use conditions.
Contact the glove manufacturer for specific advice on glove selection and breakthrough times for your use
conditions. Inspect and replace worn or damaged gloves. The types of gloves to be considered for this material
include:
No protection is ordinarily required under normal conditions of use.
Eye Protection: If contact is likely, safety glasses with side shields are recommended.
Skin and Body Protection: Any specific clothing information provided is based on published literature or
manufacturer data. The types of clothing to be considered for this material include:
No skin protection is ordinarily required under normal conditions of use. In accordance with good
industrial hygiene practices, precautions should be taken to avoid skin contact.
Specific Hygiene Measures: Always observe good personal hygiene measures, such as washing after
handling the material and before eating, drinking, and/or smoking. Routinely wash work clothing and protective
equipment to remove contaminants. Discard contaminated clothing and footwear that cannot be cleaned.
Practice good housekeeping.
ENVIRONMENTAL CONTROLS
Comply with applicable environmental regulations limiting discharge to air, water and
soil. Protect the environment by applying appropriate control measures to prevent or limit
emissions.
Note: Physical and chemical properties are provided for safety, health and environmental considerations only
and may not fully represent product specifications. Contact the Supplier for additional information.
GENERAL INFORMATION
Physical State: Solid
Form: Semi-fluid
Color: Green
Product Name: UNIREX N 2
Revision Date: 09 Apr 2013
Page 5 of 9
______________________________________________________________________________________________________________________
Odor: Characteristic
Odor Threshold: N/D
OTHER INFORMATION
Freezing Point: N/D
Melting Point: >219°C (426°F)
DMSO Extract (mineral oil only), IP-346: < 3 %wt
Decomposition Temperature: N/D
NOTE: Most physical properties above are for the oil component in the material.
ACUTE TOXICITY
Route of Exposure Conclusion / Remarks
Inhalation
Toxicity: No end point data for material. Minimally Toxic. Based on assessment of the components.
Irritation: No end point data for material. Negligible hazard at ambient/normal handling temperatures.
Based on assessment of the components.
Ingestion
Toxicity: No end point data for material. Minimally Toxic. Based on assessment of the components.
Product Name: UNIREX N 2
Revision Date: 09 Apr 2013
Page 6 of 9
______________________________________________________________________________________________________________________
Skin
Toxicity: No end point data for material. Minimally Toxic. Based on assessment of the components.
Irritation: No end point data for material. Negligible irritation to skin at ambient temperatures. Based on
assessment of the components.
Eye
Irritation: No end point data for material. May cause mild, short-lasting discomfort to eyes. Based on
assessment of the components.
CHRONIC/OTHER EFFECTS
For the product itself:
Component concentrations in this formulation would not be expected to cause skin sensitization, based on
tests of the components or similar formulations.
Contains:
Base oil severely refined: Not carcinogenic in animal studies. Representative material passes IP-346, Modified
Ames test, and/or other screening tests. Dermal and inhalation studies showed minimal effects; lung
non-specific infiltration of immune cells, oil deposition and minimal granuloma formation. Not sensitizing in test
animals.
The information given is based on data available for the material, the components of the material, and similar
materials.
ECOTOXICITY
Material -- Not expected to be harmful to aquatic organisms.
MOBILITY
Base oil component -- Low solubility and floats and is expected to migrate from water to the land.
Expected to partition to sediment and wastewater solids.
BIOACCUMULATION POTENTIAL
Base oil component -- Has the potential to bioaccumulate, however metabolism or physical properties may
reduce the bioconcentration or limit bioavailability.
Product Name: UNIREX N 2
Revision Date: 09 Apr 2013
Page 7 of 9
______________________________________________________________________________________________________________________
Disposal recommendations based on material as supplied. Disposal must be in accordance with current applicable
laws and regulations, and material characteristics at time of disposal.
DISPOSAL RECOMMENDATIONS
Product is suitable for burning in an enclosed controlled burner for fuel value or disposal by supervised
incineration at very high temperatures to prevent formation of undesirable combustion products.
Empty Container Warning Empty Container Warning (where applicable): Empty containers may contain residue and
can be dangerous. Do not attempt to refill or clean containers without proper instructions. Empty drums should be
completely drained and safely stored until appropriately reconditioned or disposed. Empty containers should be taken
for recycling, recovery, or disposal through suitably qualified or licensed contractor and in accordance with
governmental regulations. DO NOT PRESSURISE, CUT, WELD, BRAZE, SOLDER, DRILL, GRIND, OR EXPOSE
SUCH CONTAINERS TO HEAT, FLAME, SPARKS, STATIC ELECTRICITY, OR OTHER SOURCES OF IGNITION.
THEY MAY EXPLODE AND CAUSE INJURY OR DEATH.
OSHA HAZARD COMMUNICATION STANDARD: When used for its intended purposes, this material is not
classified as hazardous in accordance with OSHA 29 CFR 1910.1200.
Complies with the following national/regional chemical inventory requirements: DSL, IECSC, TSCA
Special Cases:
Inventory Status
KECI Restrictions Apply
Product Name: UNIREX N 2
Revision Date: 09 Apr 2013
Page 8 of 9
______________________________________________________________________________________________________________________
SARA (313) TOXIC RELEASE INVENTORY: This material contains no chemicals subject to the supplier notification
requirements of the SARA 313 Toxic Release Program.
______________________________________________________________________________________________________________________
Section 09: Relative Density - Header was modified.
Section 09: Flash Point C(F) was modified.
Section 09: Viscosity was modified.
Section 14: Sea (IMDG) - Header was modified.
Section 14: Air (IATA) - Header was modified.
Section 14: LAND (TDG) - Header was modified.
Section 14: LAND (DOT) - Header was modified.
Section 15: Chemical Name - Header was deleted.
Section 15: CAS Number - Header was deleted.
Section 15: List Citations - Header was deleted.
Section 15: List Citations Table was deleted.
Section 15: List Citation Table - Header was modified.
Section 14: LAND (DOT) - Default was modified.
Section 14: LAND (TDG) Default was modified.
Section 14: Sea (IMDG) - Default was modified.
Section 14: Air (IATA) - Default was modified.
Section 15: National Chemical Inventory Listing - Header was modified.
Section 15: National Chemical Inventory Listing was modified.
Section 15: Community RTK - Header was modified.
Section 11: Additional Health Information was modified.
Section 09: Melting Point C(F) was modified.
Section 15: Special Cases Table was modified.
Section 09: Decomposition Temperature was added.
Section 09: Decomposition Temp - Header was added.
Section 09: Oxidizing Properties was modified.
Section 01: Company Contact Methods Sorted by Priority was modified.
Section 04: First Aid Ingestion - Header was modified.
----------------------------------------------------------------------------------------------------------------------------- ------------------------
------------------------------------------------------------------------------------------------------------------------------- ----------------------
The information and recommendations contained herein are, to the best of ExxonMobil's knowledge and belief, accurate
and reliable as of the date issued. You can contact ExxonMobil to insure that this document is the most current
available from ExxonMobil. The information and recommendations are offered for the user's consideration and
examination. It is the user's responsibility to satisfy itself that the product is suitable for the intended use. If buyer
repackages this product, it is the user's responsibility to insure proper health, safety and other necessary information is
included with and/or on the container. Appropriate warnings and safe-handling procedures should be provided to
handlers and users. Alteration of this document is strictly prohibited. Except to the extent required by law,
re-publication or retransmission of this document, in whole or in part, is not permitted. The term, "ExxonMobil" is used
for convenience, and may include any one or more of ExxonMobil Chemical Company, Exxon Mobil Corporation, or any
affiliates in which they directly or indirectly hold any interest.
---------------------------------------------------------------------------------------------------------------------------------------------- -------
1. SCOPE
The scope of the document is to provide design information of the T93 foundation for G114 CII
valid for quotation and commercial purposes.
2. BARS CAGE
∅ext = 4530mm
∅int =3930mm
Thickness = 30mm
Weight = 891kg
Material: S235JR (EN10025-3)
∅3930
∅4530
∅ext = 4590mm
∅int =3870mm
Thickness = 50mm
Weight = 1.798kg
Material: S355J2+N (EN10025-3)
∅3870
∅4590
• ∅slab = 18.5m
• ∅ped = 5.5m
• Hout = 0.5m
• Hin = 2.2m
• Hped = 0.5m
• Concrete: 357m3
• Steel reinforcement:
42Tn
The values included here have to be considered as a reference for a standard wind farm. The final
design will be adapted to the particular geotechnical properties.
TABLE OF CONTENTS
1. PURPOSE ..................................................................................................................................... 2
2. SCOPE ......................................................................................................................................... 2
3. G114-2.5MW T93M IEC IIA FOUNDATION LOADS ............................................................................. 2
3.1. DESIGN LOADS .................................................................................................................... 2
3.2. COORDINATE SYSTEM.......................................................................................................... 2
3.3. EXTREME LOADS ................................................................................................................. 3
3.4. FATIGUE LOADS .................................................................................................................. 3
3.5. LOADS FOR GAP VERIFICATION ............................................................................................ 3
3.6. ROTATIONAL STIFFNESS ...................................................................................................... 4
3.7. INTERFACES........................................................................................................................ 4
RECORD OF CHANGES
1. PURPOSE
This document presents the foundation loads as well as the minimum rotational stiffness required for the
design of the Gamesa G114 2.5MW foundations.
2. SCOPE
Applicable to foundations for all the G114 wind turbines included in the table below:
Prior to the design of the foundation, the foundation engineer shall check that he is in possession of the
latest version of this document and all the documents referred to herein.
Safety Fx Fy Fz Mx My Mz Mxy
Load Case
factor kN kN kN kNm kNm kNm kNm
dlc22kp_5 1 -1118.52 -38.1643 -3723.83 3515.136 -106784 -819.689 106670.4
Table 2: G114-2.5MW T93m IIA extreme loads at the base of the tower. Unfactored loads.
The minimum safety factor to be applied in all cases will be as defined in the IEC 61400-1 standard for each
load case.
Table 3 provides factored extreme loads for G114-2.5MW T93m IIA foundations.
Safety Fx Fy Fz Mx My Mz Mxy
Load Case
factor kN kN kN kNm kNm kNm kNm
dlc22kp_5 1.1 -1230.37 -41.9808 -4096.22 3866.649 -117463 -901.658 117337.4
Table 3: G114-2.5MW T93m IIA extreme loads at the base of the tower. Factored loads.
The loads provided by Gamesa as “Extreme Loads” in this section are the maximum static loads for the
specific wind turbine calculated according to IEC 61400 or DIBt standard for each site class. These loads
must not be combined with any other type of load. They include the dynamic behavior of the structure and
correspond to the most unfavorable case at the base of the wind turbine among the different load cases,
according to IEC 61400 or DIBt. Therefore, the loads provided by Gamesa as “Extreme Loads” are directly
the foundation design loads. They shall not be divided or combined with any other load
In the above table, the “m” values correspond to the Wöhler gradient, which has a value of 4 for steel and 7
for reinforced concrete.
Table 5 shows the mean fatigue loads for the design of the G114-2.5MW T93m IIA foundations:
Checking the foundations under operational loads to test whether there is a gap between the footing and the
ground is necessary for countries where such verification is required. The designer is responsible for taking
into account the local considerations of the country where the foundation is to be installed.
The following tables show the gap loads for the G114-2.5MW T93m IIA wind turbine:
Fx Fy Fz Mx My Mz Mxy
Load Case Load
kN kN kN kNm kNm kNm kNm
dlc10a 1 374.8788 -13.95 -4234.84 2776.939 33279.88 508.3978 33346.26
Table 6: G114-2.5MW T93m IIA gap loads at he base of the tower according to DIN1054, case 1
Fx Fy Fz Mx My Mz Mxy
Load Case Load
kN kN kN kNm kNm kNm kNm
dlc81ab5 1 -58.1688 -183.014 -4173.52 16234.01 -9444.9 478.3138 16567.56
Table 7: G114-2.5MW T93m IIA gap loads at he base of the tower according to DIN1054, case 2
Fx Fy Fz Mx My Mz Mxy
Load Case Load
kN kN kN kNm kNm kNm kNm
dlc22kp_5 1 -1118.52 -38.1643 -3723.83 3515.136 -106784 -819.689 106670.4
Table 8: G114-2.5MW T93m IIA gap loads at he base of the tower according to DIN1054, case 3.
If this condition is not met, the loads provided by Gamesa for the design of the foundation will no longer be
valid.
In the case of pile foundations, Gamesa will supply the minimum foundation horizontal stiffness value to be
guaranteed in the design.
3.7. INTERFACES
The post-tensioned bolts system shall be fully defined in the diagrams and the following documents must be
provided:
The maximum acceptable difference in level for the G9x turbines welded section is 6 mm. If the difference in
level is greater, proceed as indicated in section 7.1 of the document EQ209006.
The entrance door to the tower shall be placed facing against prevailing winds in order to prevent the
direction of the wind from slamming the door shut, with the subsequent possibility of injuries to operators.
The welding axis of the first tower section shell ring is 90º (clockwise) with regard to the entrance door.
1. SCOPE
The scope of the document is to provide design information of the T93 foundation for G114 CII
valid for quotation and commercial purposes.
2. BARS CAGE
∅ext = 4530mm
∅int =3930mm
Thickness = 30mm
Weight = 891kg
Material: S235JR (EN10025-3)
∅3930
∅4530
∅ext = 4590mm
∅int =3870mm
Thickness = 50mm
Weight = 1.798kg
Material: S355J2+N (EN10025-3)
∅3870
∅4590
• ∅slab = 18.5m
• ∅ped = 5.5m
• Hout = 0.5m
• Hin = 2.2m
• Hped = 0.5m
• Concrete: 357m3
• Steel reinforcement:
42Tn
The values included here have to be considered as a reference for a standard wind farm. The final
design will be adapted to the particular geotechnical properties.
Technical Specification
Wind Turbine Generator Systems
All Types
This document is copyrighted within the meaning of the Copyright Act. The transmission and reproduction of the docu-
ments, also in extracts, as well as the exploitation and communication of the contents are not allowed without express
written consent. Contraventions are liable to prosecution and compensation for damage. We reserve all rights for the
exercise of commercial patent rights.
Change List
List of Figures
1 General / Introduction
This document highlights important aspects of the wind turbine foundation for the Buyer’s action or consideration.
As it is assumed that the Buyer is familiar with the design of wind turbine foundations, this document is not all inclusive,
and the Buyer may need to consider other design aspects to insure adequate strength, stability, stiffness and longevity
of the foundation.
The following are the foundation related documents provided to the Buyer, and are listed in the order of precedence.
The document “Load specification for the Foundation of the Wind Turbine Generator System” is specific to a turbine
model, as delineated by the turbine series, MW rating, rotor diameter, nominal hub height, and possibly other factors
such as weather rating. This document is referred to herein as the Foundation Load Specification. The Buyer should
confirm that the Buyer is using the most recent applicable Foundation Load Specification, prior to finalizing the founda-
tion design and issuing the For-Construction foundation drawings.
Load Specification for the Foundation of the Wind Turbine Generator Sys-
X X
tem
Information on the Design, Detailing and Execution of the Foundation for
X X
the Wind Turbine Generator System
Customer Information for the Installation of the Anchor Bolt Assembly in
X X
the Wind Turbine Foundation
Customer Information for the Anchor Bolt System - 2.X Series X
3 Scope-of-Supply
This document does not specify foundation interface hardware scope-of-supply responsibility between the Buyer and
Seller. Refer to the Contract for the scope-of-supply responsibility.
Section I Section II
Clause Clause Title Mandatory Supplemental
Requirements Information
1.0 Codes and Standards X X
1.1 General X X
2.0 Foundation Structural Design X X
2.1 General X X
2.2 Extreme Loads X X
2.3 Fatigue Loads X X
2.3.1 Markov Matrix X
2.3.2 Fatigue Load Spectra X
2.3.3 Combination of Fatigue Load Effects X
2.3.4 Fatigue Design Calculation X
2.3.5 Grout Joint Fatigue Strength X X
2.3.6 Mono-Pier Foundation Fatigue Strength X X
2.3.7 Deep Driven Piling Fatigue Strength X
2.4 Seismic X
2.5 Tower Inclination Load X
3.0 Foundation Performance X X
3.1 Ground Water Level / Buoyancy X
3.2 Foundation Dynamic Stiffness X X
3.3 Maximum Allowed Settlement and Inclination X
Foundation Lift-Off, Overturning, Sliding, Shear
3.4 X X
Failure and Pile Tension
4.0 Foundation Interface Detailing X X
4.1 Tower Foundation Interface Configuration X
4.1.1 T-Flange Tower with Anchor Bolt Cage X
4.1.2 Adapter Anchor System X
4.2 Foundation Anchor Bolts X
4.2.1 Foundation Anchor Size X
4.2.2 Foundation Anchor Material X X
4.2.3 Foundation Anchor Fabrication X
4.2.4 Foundation Anchor Corrosion Protection X X
4.2.5 Foundation Anchor Conduits / Sleeves X
4.2.6 Foundation Anchor Thread Protection X
4.2.7 Embedded Anchor Ring X
4.2.8 Foundation Drawing Anchor Bolt Requirements X
4.3 Grouted Joint X X
4.4 Tower Drain Pipe X
4.5 Electrical Conduits X X
1.1 General
The Buyer is responsible for insuring that the wind turbine foundation meets all of the relevant Codes and Standards
applicable to the project site.
2.1 General
The Foundation Load Specification may include a number of different load cases for a particular turbine model that are
differentiated by a turbine specific detail such as the blade manufacturer. In such situations, all of the load cases must
be considered in the foundation design unless otherwise directed by the Seller. One exception is if the Foundation Load
Specification provides load cases for both Standard Weather (SW) and Cold Weather Extreme (CWE) rated turbines. Un-
less otherwise specified in the Foundation Load Specification, SW turbines need only consider the SW extreme and fa-
tigue loads, whereas CWE rated turbines must consider both the SW and CWE extreme and fatigue load cases. This is
regardless of whether the CWE rated turbine is installed in CWE site.
The foundation loads in the Foundation Load Specification are provided with, and without, partial load factors. The
foundation designer is ultimately responsible for the selection of the appropriate partial load factors as per the govern-
ing design standard for the project site.
The Foundation Load Specification includes the high-cycle fatigue load data for the wind turbine design life cyclic oper-
ating loads. The fatigue loading of all foundation elements must be fully considered by the Buyer in accordance with
the applicable codes and standards and industry recognized practices, and considering the full design life of the wind
farm (20 years minimum).
The Foundation Load Specification specifies an additional moment that the foundation designer must consider to act
on the upper surface of the foundation, to account for tower inclination resulting from uneven foundation settlement
and installation tolerances. This moment is additive to the Mr moment specified in the Foundation Load Specification
load cases. Unless otherwise indicated, this additional moment is unfactored, and the appropriate load factor / safety
factor to the load case to which it is being considered with must be applied.
3 Foundation Performance
The ground water level and corresponding buoyancy effect must be accounted for in the foundation design, and must
consider the highest possible level of ground water as per the site geotechnical report.
The foundation must provide the minimum dynamic stiffness specified in the Foundation Load Specification.
The foundation inclination and vertical settlement must not exceed the limits specified in the Foundation Load Specifi-
cation. The Buyer’s analysis must consider both immediate and long-term foundation settlement, and anticipated vari-
ation of soil properties across the foundation. However, the Buyer’s analysis need only consider the gravity load due to
the mass of the wind turbine and foundation. Wind turbine operational and extreme loads do not need to be consid-
ered in the Buyer’s analysis.
3.4 Foundation Lift-Off, Overturning, Sliding, Shear Failure and Pile Tension
The foundation must be checked for lift-off, overturning, sliding and pile tension, as applicable, and the underlying soil
checked for shear failure, as per the GE Foundation Load Specification and GL Guidelines.
A T-flange tower with an anchor bolt cage (see Figure 1), or an adapter anchor system (see Figure 2), are the typical
foundation anchorage configurations used for a GE wind turbine tubular tower. Both are similar with regards to the
embedded anchorage, but differ in installation. The Foundation Load Specification details the applicable foundation
anchorage configuration.
1.0
2.0 tower base ring
3.0
4.0
anchor bolt system
5.0
6.0
7.0
foundation leveling
8.0
slab
9.0
Tower base ring portion of the tower, and the soon-to-be-embedded anchor bolt system. The tower base ring is being
used as a template to maintain proper position of the anchor bolt system during the concrete placement. The tower
base ring to anchor bolt system connection is a “T-flange” with an inner and outer set of anchor bolts.
The provisions of Section 4.2 are applicable to wind turbine projects for which the anchor bolts are supplied by the Buy-
er. Also refer to the document ” Customer Information for the Installation of the Anchor Bolt Assembly in the Wind Tur-
bine Foundation” for both the 1.x and 2.x Series wind turbines, and the document “Customer Information for the Anchor
Bolt System” for 2.x Series wind turbines
The anchor bolt embedded length will be dependent on the foundation design. A common practice is that the embedded
length be sufficient to extend the anchorage to near the upper surface of the bottom reinforcing mat (see Figure 3). The
anchor bolt minimum projection length must consider any necessary engagement length for the anchor bolt pre-
tensioning tooling.
For projects for which the wind turbine is required to have cold weather extreme (CWE) design provisions, the foundation
anchor bolts must have a minimum Charpy value of 27 Joules at -40°C. (Note: in some cases, a CWE rated turbine may be
supplied, but the site may not necessarily require a CWE rated turbine. In such cases, it is not necessary for the anchor
bolts to meet this Charpy requirement)
All foundation anchor bolts shall have mechanically cold rolled threads; cut threads are not allowed.
The grout at the tower-to-foundation interface must provide complete contact with the entire surface area of tower base
flange, with no voids or cavities.
For the tower-to-foundation interface grouted joint,, the foundation designer shall:
- Provide the grout joint dimensions (width and depth) that are commensurate with the type of grout
- Provide a detailed grouting specification which will list approved manufacturer(s), requirements to prepare the joint for
grouting, grout mixing, grouting procedure and the grout curing requirements. The grout specification will also list the
requirements for samples of grout to be taken by the contractor for testing by the owner’s testing representative.
- Determine the grout and underlying foundation concrete strengths required for each construction stage, and for all
wind turbine design load cases. This includes, but is not limited to: anchor bolt pre-tensioning, erection of the first tow-
er section, erection of second tower section, erection of the whole tower, erection of the complete turbine, and com-
mencing of wind turbine operation. All design load cases provided in the Foundation Load Specification, including all
extreme, fatigue and other load cases, shall be rigorously checked in the design of the foundation and grout joint, and
in the determination of grout / concrete strength.
- Specify the hardware and methods for leveling the tower base section. This must consider the loads and stresses on
the foundation concrete and tower base flange from dead weight and potential wind loads. This includes specifying
the minimum size and locations of shims, and acceptable shim materials
- Determine and specify on the foundation construction documents the curing time and the grout compressive strength
required before the anchor bolts can be tensioned.
4.5.1 General
The Buyer has to provide sufficient electrical conduits in the foundation for the power and control cables. As the required
quantity and diameter of the conduits can vary depending on a number of factors including the park configuration, the
thickness of the power and control cables, and voltage levels, it is the Buyer’s responsibility to ensure that an appropriate
number of appropriately sized conduits are provided for proper installation of the power and control cables.
The conduits must be protected against sagging, floating-up, and other movement during the concrete placement, and
the conduit ends must be sealed to prevent the ingress of water, concrete or debris. All conduit couplings must be com-
pletely watertight. The conduits must be oriented vertically where the conduits emerge from the foundation concrete on
the inside of the tower.
Consult with the engineer-of-record should reinforcement steel need to be shifted to install the electrical conduits. Unless
explicitly approved by the engineer-of-record, no reinforcement steel shall be cut, or be tack-welded to, to assist in the in-
stallation of the electrical conduits
4.5.2 Conduit Arrangement: 50 hz / 60 hz 1.X Series Wind Turbine with External Step-up Transformer
Buyer to provide a minimum of five (5) 125mm (5 inch) diameter PVC conduits for tinned copper power cable (5 x 400 mm2
[750 kcmil] per phase), running from the low voltage distribution cabinet of the pad-mounted transformer to the power
distribution cabinet interface inside the turbine tower. See Figure 5.
As an alternative, Buyer to provide a minimum of five (5) 100mm (4 inch) diameter PVC conduits for tinned copper power
cable (5 x 400 mm2 [750 kcmil] per phase), running from the low voltage distribution cabinet of the pad-mounted trans-
former to the power distribution cabinet interface inside the turbine tower. See Figure 6.
As an alternative, Buyer to provide a minimum of five (5) 125mm (5 inch) diameter PVC conduits for aluminum power cable
(5 x 500 mm2 [1000 kcmil] per phase), running from the low voltage distribution cabinet of the pad-mounted transformer to
the power distribution cabinet interface inside the turbine tower. See Figure 5.
As an alternative, Buyer to provide a minimum of seven (7) 100mm (4 inch) diameter PVC conduits for aluminum power
cable (7 x 400 mm2 [750 kcmil] per phase), running from the low voltage distribution cabinet of the pad-mounted trans-
former to the power distribution cabinet interface inside the turbine tower. See Figure 7.
In addition to the power cable conduits, Buyer to provide one (1) 100mm (4 inch) conduit and one (1) 60mm (2.5 inch) con-
duit for communication and control cables as shown in Figure 5, Figure 6 and Figure 7.
Figure 5 Plan Detail, 1.x Series with 5 x 125mm Power Cable Conduits
Figure 6 Plan Detail, 1.x Series with 5 x 100mm Power Cable Conduits
Figure 7 Plan Detail, 1.x Series with 7 x 100mm Power Cable Conduits
TOWER DOOR
Figure 8 Plan Detail, Conduits for a 2.x Series with External Transformer
Figure 9 Plan Detail, Conduits for a 2.x Series with Internal Transformer
Buyer to provide a suitable support surface for the base of the GE supplied tower access stair. Refer to
Figure 10 and Figure 11 respectively, for the stairs interface dimensions for the 1.x series wind turbines, and the 75m,
85m, 98.3m and 110m hub height 2x series turbines, respectively.
1250 mm 110 mm
157 mm
150 mm 2015 mm
Figure 11 2.X Series Tower Access Stairs Interface Dimensions - 75m, 85m, 98.3m and 110m Hub Heights
4.7.1 General
The provisions herein are intended for general system information, and are the minimum requirements for grounding of
GE supplied items. The Buyer is responsible for the grounding design and installation requirements, and must encom-
pass the minimum requirements herein.
The grounding system consists of ground ring conductors that limit the step and touch potential for personnel, and the
ground rods that maintain a low ground resistance. The grounding system shall be designed to meet the following min-
imum requirements:
- All equipment and structures must be properly grounded, and an adequate earth ground grid installed, as necessary
to provide for personnel safety, and safe operation of the equipment
- Proper equipment grounding for lightning and surge protection
- All specific country, state and local requirements (i.e. NEC and NESC) shall be adhered to in the grounding design,
construction and installation
- In locations where adopted, the National Electrical Code (NEC) requirements shall be met and step touch potential
limits shall be per the requirements of the National Electrical Safety Code (NESC)
- Local soil conditions and resistivity must be considered in the installation of the grounding system for the individual
turbine site as well as for the area surrounding a group of turbines within an interconnected system.
4.7.3 Materials
Grounding materials shall follow the project site local construction norms, and be of tinned stranded copper conductor
(cable), or alternatively, steel strips.
All steel strips shall have a minimum cross sectional area of 100mm², and either be 3.5 mm by 30 mm rectangular steel
bars, or of circular shape.
• The grounding ring embedded in the wind turbine foundation concrete will be 120 mm2 [250 kcmil] bare copper ca-
ble or galvanized steel strips.
• The terminal lugs and the grounding ring in the soil will be 120 mm2 [250 kcmil] bare copper cable or stainless steel
strips.
Figure 12 Ground Connection – Cable to Cable (Tee) Mechanical and Exothermic Options
PES
Figure 13 50 hz 1.x Wind Turbine Grounding Elevation View (all dimensions are in mm)
Provide a total of 6 grounding leads coming into the wind turbine tower. Table 2 shows the lead names and connec-
tions. Number and label the leads as shown in Figure 14 and Figure 15. Note that in addition to the (6) grounding leads,
the figures also show the grounding strip between the outer grounding ring and the transformer grounding (grounding
strip 5), and the two grounding strips between the tower flange and the ESS platform (grounding strips 8 and 9).
Concrete foundation
(1) 250 kcmil bare copper cable to
the grounding rods at transform
Outside Grounding
Ring
(4) 250 kcmil bare copper
cables connect the outside
grounding ring to the inside Inside Grounding Ring
copper ring.
Grounding
Rebar mechanically bolted to the bottom reinforcing Rod
(6) Grounding
Rods bonded to steel mat of the foundation (not CAD Welded)
the outside
grounding ring
SECTION B-B
Figure 15 60 hz 1.x Wind Turbine Grounding Elevation View
Figure 16 2.x Series Grounding Elevation View (all dimensions are in mm)
The transformer XO terminal is connected through the grounding pad at the low voltage compartment by means of bare
copper cable, which is connected to two ground electrodes located adjacent to the transformer pad. The bare copper
cable is to be completely isolated from contacting the transformer foundation concrete and reinforcement by routing
within embedded PVC conduit. Refer to Figure 17 and Figure 18. The two ground electrodes are connected to the turbine
foundation outer grounding ring by a 120 mm2 [250 kcmil] bare copper cable.
Figure 17 Elevation View of External Pad Mount Transformer Grounding – Turbine Located at End of Turbine String
Figure 18 Elevation View of External Pad Mount Transformer Grounding – Turbine Located Along Turbine String
The ground resistance should be measured upon completion of installation of the ground system. Measured ground re-
sistance must be less than 10 ohms (Ω) to ensure personnel and operation safety. If the ground/earth resistance is not less
than 10 ohms, the grounding system shall be improved by adding additional ground rods spaced equally around the pe-
rimeter of the grounding ring, and located no closer than 1.83m (6 feet) apart, until the resistance is less than 10 ohms (Ω).
The electrode shall be installed such that at least 2.44 m (8 feet) of length is in contact with the soil. Grounding resistance
measurements should be recorded in the contractor checklist documentation. Note - The resistance is measured with the
cables not connected to the high voltage side of the transformer so that only the local grounding is measured and not
counting any from any other collector cables.
1.1 General
The wind turbine foundation information provided by GE is not aligned to any specific Code or Standard, but does con-
sider the Codes and Standards commonly used for wind turbine foundation design. This includes those of:
- GL (Germanischer Lloyd Rules and Guidelines 2003, Regulation for the Certification of Wind Energy Conversion
Systems- Vol. IV- Non-Marine Technology, Part 1 – Wind Energy, Hamburg, Germany)
- IEC (International Electrotechnical Commission Standard 61400-1 second edition 1999- 02 Wind Turbine Gen-
erator Systems Part 1 Safety Requirements, Geneva, Switzerland)
- ASCE/AWEA RP2011, Recommended Practice for Compliance of Large On-land Wind Turbine Support Struc-
tures
2.1 General
A wind turbine imposes high dynamic loads on the foundation. This requires special consideration in the foundation
design, especially with regards to fatigue loading.
The wind turbine foundation loads provided by GE are from the results of dynamic simulations performed in accordance
with IEC 61400-1 and GL requirements and guidelines. Foundation loads are provided for both the extreme load design
cases, and fatigue loads. The foundation loads are turbine-specific, and the applicable loads to consider in the founda-
tion design are dependent on the characteristics of the turbine, including the wind classification, turbine tower type and
height, blade type, etc.
Unless stated otherwise in the turbine-specific Load Specification, the foundation loads are assumed to act at the bot-
tom-most flange of the tower assembly, i.e., at the interface between the tower flange and foundation grout for an an-
chor bolt cage connection, and at the interface between the adapter flange and foundation grout for an adapter an-
chor system.
The GE foundation load tables contain the controlling load cases from the IEC-61400 design load cases (DLC). The loads
include all of the elements of the indicated DLC acting simultaneously, i.e., the loads are not provided in their separate
elements of dead, live, operational, etc.
The foundation loads are provided with, and without, partial load factors. Unless indicated otherwise in the turbine-
specific Load Specification document, a single partial load factor is used for each DLC, following the practice of IEC
61400-1. For the ultimate limit state design of the foundation, the factored loads used by the foundation designer
should not be less than the factored loads in the GE Load Specification document. In the specific case of reinforced
concrete design per ACI 318, refer to ASCE/AWEA RP2011. The resulting load combinations should not use less than [1.4
x (GE Load Specification unfactored loads)] for the strength design of the concrete and reinforcing when considering
overturning and resisting load factors combined, along with the normal material strength reduction factors (φ) specified
in ACI 318.
The wind turbine foundation is subject to fatigue loading from a number of sources, including wind field turbulence,
blade-tower passing, and operational activities such as starting, stopping and nacelle yawing. The foundation load
specification typically provides the wind turbine fatigue load data in two formats: Markov Matrices, and Fatigue Load
Spectra. The two formats are described in more detail below. In general, the Markov Matrices provide a more accurate
and comprehensive way to analyse the foundation for fatigue. Both the Markov Matrices and Fatigue Load Spectra are
available in electronic media form. In addition, the Fatigue Load Spectra is typically provided in graphical form in the
WTGS load specification document.
For reinforced concrete, the reinforcing and concrete should be designed for fatigue using the CEB-FIP Model Code 1990
published by Comité Euro-International du Béton, as recommended by the 2003 Germanischer Lloyd Rules and Guidelines.
Other concrete design codes such as German Standard DIN 1045-1, and American Concrete Institute ACI 215R, do not
consider the high number of load cycles associated with a wind turbine, and therefore should not be used.
The partial safety factor on the GE provided fatigue loads is 1.0 (γF = 1). Additional partial safety factors need to be applied
as per the Code or Standard being used. Refer to Table 4 for general information. Note that the applicable partial safety
factors must be applied before the damages are calculated.
F a tig u e P r o o f
D e fin itio n o f th e d a m a g e d u e to a g ro u p o f lo a d s w in g s
∆σ
ni
1 D i =
m N i
∆ σC
∆ σD T h re s h o ld V a lu e o f
F
t haet i g u e
∆ σL s tre n g th
N
1 04 1 05 1 06 5 · 1 06 1 08 C o n tin u a tio n o f th e
2 · 1 06 1 0
7
P
c ue rr vteh eD I B -t G u i d e l i n e s
ni N i
F a tig u e P r o o f
F a tig u e C u rv e S tre n g th a fte r E C 3
∆σ
∆σC
3
N = N ⋅
∆σ
C
1
∆σ D
5
m
N = N ⋅
∆σ
D
∆σC
∆σD T h re s h o ld V a lu e o f
F a tig u e S tre n g th
∆σL
N
104 105 106 5 ·1 0 6 108 C o n tin u a tio n o f th e c u r v e
2 ·1 0 6 107 p e r th e D I B t - g u id e l in e
F a t ig u e P r o o f
F a t ig u e C a l c u la tio n a ft e r th e p r o c e d u re o f E u r o c o d e 3 u s in g th e m e th o d
o f P a l m g r e n / M in e r fo r n o n p e r i o d ic lo a d c y c le s :
ni
D am age Sum : D = ∑ Ni
≤ 1, 0
w it h n i: n u m b e r o f te n s io n s w i n g s o f a n in te n s it y le v e l e x p e c te d
i n 2 0 y e a r lif e ti m e o f m a c h in e ∆ σ
Ν i: n u m b e r o f te n s io n s w i n g s t h a t w o u l d l e a d t o fa ilu r e a t
t h a t p a r tic u la r i n te n s i ty le v e l ( a m o u n t o f s tr e s s s w i n g o r d e lt a ) ∆ σ
This general method of estimating the fatigue loads is outlined in Danish Energy Agency “Recommendation for Technical
Approval of Offshore Wind Turbines”[5], as follows: “In practice, it is not allowed to calculate the response of the structure
over its entire lifetime, time step after time step. Thus, a number of load cases are selected which, in conjunction, are as-
sumed to result in the same level of certainty as the actual load event. For this purpose, the load is usually thought to be
decomposed into a (current) mean value (in the case of wind this corresponds to the mean load of V10 min) with a pertur-
bation around this. This decomposition is applicable to both time simulation and quasi-static observations.”
For wind turbine concrete foundations, the reinforcing and concrete are typically designed for fatigue using the CEB-FIP
Model Code 1990 Design Code published by Comite Euro-International Du Beton. This is referred to as MC1990 in this doc-
ument. This fatigue method is also per DAfStb booklet 439. Note that the 2003 Germanischer Lloyd Rules and Guidelines
(GL) also require use of MC 1990 (Chapter 5, Page 5-15, section 5.4.2.2)
Seismic resistance is not a standard design requirement in IEC 61400-1. Moreover, any necessary seismic resistance for
a site is dependent on site-specific factors including the mapped ground acceleration, soil profile and the provisions of
the local Building or Seismic Code. Accordingly, seismic loads are typically not included by GE in the wind turbine specif-
ic Load Specification.
For sites where the level of seismicity may be high enough to control certain aspects of the foundation design, GE can
provide site specific seismic loads upon request, subject to GE being provided with all of the relevant information need-
ed to develop the earthquake loads, including, the applicable code, ground accelerations, soil types, facility importance,
etc. Such sites should be identified by the Customer during the project development phase so that GE can confirm the
seismic adequacy of the applicable wind turbine model, and to insure that the GE calculated site-specific seismic loads
are available to the foundation designer early in the project execution phase.
3 Foundation Performance
Wind turbines are subject to strong dynamic loadings. Accordingly, the dynamic properties of the overall wind turbine
structural system (i.e., the foundation, tower, drive train, and rotor) are critical.
The Foundation Load Specification specifies the minimum acceptable foundation stiffness that is required to ensure
that the total wind turbine system will have the minimum fundamental eigenfrequency assumed by GE in the wind tur-
bine design. This specified minimum acceptable foundation stiffness may be dependent on the foundation type. Note
that there is no upper limit on the foundation stiffness, since as part of the wind turbine design, GE confirms that the
wind turbine is acceptable assuming the foundation to be completely rigid.
National or Industry Codes and Standards may apply for stability verification of the foundation. It is recommended that
the foundation to comply with the Germanischer Lloyd Wind Energie GmbH IV Rules and Guidelines Edition 2003, 6.7.6.3
Part (3) and Part (4). This means 100% contact area between the foundation and soil during normal operational loading,
and for the extreme loads case, a contact area at least up to the foundation centerline (50% contact). The Foundation
Load Specification provides the applicable load cases for which the foundation should maintain 100% and 50% contact.
For overturning stability, the safety factor against the calculated overturning moment must never be less than 1.50,
based on the safety factor being applied to the unfactored service loads. The calculated overturning moment must in-
clude the moment due to the resultant of the tower base shear, multiplied by the foundation height. This check is for
safety factor against overturning about the ‘toe’ of the foundation and against soil failure in shear.
For foundation sliding checks, the safety factor must be at least 1.50. The effect of the tower base torsional moment
about the vertical axis of the tower must be included in this check against lateral forces. For spread foundations, con-
sidering only the resistance due to friction between the subgrade and bottom of the foundation is typically sufficient to
confirm sufficient resistance to sliding. For deep piled foundations, all of the lateral forces are to be resisted by the pil-
ing; friction between the bottom of the foundation and subgrade shall not be considered.
datum of GE provided
foundation loads
anchor cage anchor
bolts
turbine hub-height
elevation tower base flange
(T flange)
**
*
**
* GE specified dimension
** Buyer specified dimension
**
*
**
* GE specified dimension
** Buyer specified dimension
Figure 25 depicts two typical grout joint configurations. The grout joint configuration is determined by the foundation de-
signer.
It is recommended that the Foundation Engineer of Record (FEOR) prepare, seal and submit, to the owner of Wind Farm
and kept as record, the calculations and construction details on how the base of the tower is to be supported both during
construction and permanently, and show that the construction and permanent loads are transmitted safely without any
damage to the steel tower base flange, anchor bolts or foundation.
Prior to tensioning the anchors, the grout strength should be proven by testing to be as specified by the foundation de-
signer. The test results should be based on the average result of 3 cubes (prisms).
Buyer should provide a single 70 mm (2.5 in) nominal diameter PVC pipe in the foundation inside the tower for drainage.
The surface of the foundation inside the tower should be sloped towards the drainpipe, and the end of the drain pipe
should be flush with the top surface of the foundation and in an accessible, location given the arrangement of equip-
ment in the down-tower.
4.5.1 General
Electrical conduits should slope downward at 2 degrees or more toward the outside of the foundation. Unless otherwise
indicated, the electrical conduits should be trimmed to within 8 cm (3 in) of the top of the concrete surface. The conduit
elements should be connected using 15° bends only (unless full 90° bend elements or flexible conduit is used). Larger
bends such as 30° elements should not be used. (A 90° bend is comprised of 6 x 15° bends.) Follow all the bending radius
requirements of the power cables.
The electrical conduits bushings can cause problems during power cable installation when the bushings are not installed
in the correct direction. To preclude this, start the conduit installation with a bushing facing away from the foundation. For
gravity type spread foundations, provide a coupling at the face of the foundation for the electrical conduits.
4.7.1 General
Guidance for the design of grounding (earthing) can be found in Reference [4-1] in Section 6, Page 34. The grounding
design should meet the provisions of Reference [4-2] in Section 6, Page 34.
The following methods can be used to assist in lowering the grounding/earth resistance to 10 ohms or less:
LYNCOLE XIT Grounding: Provides a chemical ground rod that consists of hollow copper tubing with a chemical grounding
rod inserted into piping. The chemical seeps into the ground providing substantial adherence with the soil to give a re-
sistance of 1 ohm.
PowerFill (Clay)/PowerSet (Rocks/Sand): Utilize carbon-based additive “calcined petroleum coke” to protect copper from
corroding. It creates a positive, low-resistance, electrical connection between grounding system and the earth. In high-
resistivity soils, Powerfill can be used to produce acceptable grounding impedance with reasonable size. Drill earth hole to
the desired depth, suspend ground rod in center of hole to be filled and pour Powerfill up to the desired level.
Eritech Chemical Ground Electrodes provide a low-impedance ground in locations of high soil resistivity. Together with
Ground Enhancing Material (GEM) as backfill, the system is intended to dissipate lightning energy and other dangerous
electrical fault currents, in sandy or rocky soil conditions. UL & cUL Listed to UL467 and CSA C22.2 No. 41 respectively.
GE is open to discussions of customer options for methods to reduce grounding resistance where assistance is required
due to land masses of high resistivity.
After tower installation is complete, consideration should be given to sealing the pedestal concrete top and the grout
joint with a waterproofing material, e.g., a resin impregnated membrane as shown in Figure 26.
sealing
[4-1] IEC Technical Report TR 61400-24 first edition 2002 Wind turbine generator systems- Part 24: Lightning Protection,
Ref. # IEC/TR 61400-24:2002(E).
[4-2] Germanischer Lloyd Wind Energie GmbH (GL) Guidelines for the Certification of Wind Turbines Edition 2003, sec-
tion 8.9 Lightning Protection and all the standards referenced in its section 8.9.1. This includes IEC 61024-1-1 (1993-09)
“Protection of Structures against lightning- Part 1: General Principles”.
5.1 General
The foundation soil properties must be consistent with the assumptions made in GE’s static and dynamic calculations of
the wind turbine, and must be accurately quantified to ensure proper foundation design. The information provided in this
section is for reference only, and the geotechnical engineer is fully responsible for determining and carrying-out the exam-
inations needed to define the parameters that are critical in confirming the strength, stability and stiffness of the wind tur-
bine foundation.
A site-specific soil investigation (geotechnical investigation) report is expected to be commissioned by the Buyer for all pro-
jects.
A minimum of one boring or cone penetration test (CPT) is recommended at each turbine foundation location. For sites
with appreciable variation in soil properties, additional borings should be made around the perimeter of each foundation
footprint. The exact number and location of borings should be determined based on discussions with a geotechnical en-
gineer knowledgeable about the local soil conditions. Each soil layer contributing to the foundation settlement and stiff-
ness must be thoroughly investigated.
For gravity foundations, all borings should extend to at least as deep as the largest lateral dimension of the foundation.
For mon-pier type foundations (also referred to as short pole type, caissons, bored piles or the proprietary design Patrick
and Henderson Tensionless Pier), the borings should extend to at least 2 meters below the bottom of the planned shaft
foundation excavation. For deep pile type foundations (foundations on multiple driven or augured piling), boring depths
will be based on the pile type and the site soil properties. The structural engineer should provide preliminary maximum pile
reactions to the geotechnical engineer in order to reach a mutual decision on an economical pile type. Based on this pile
type and reaction, the geotechnical engineer should make a recommendation regarding boring depths.
The project geotechnical report should address bearing capacity, differential soil settlements, consolidation settlements
and recommendations for preventing surcharge soil erosion due to storm water drainage from the wind turbine tower and
nacelle. Moreover, the report should address potential degradation of the soil or rock due to cyclic loading from the wind
turbine, over the full turbine operational life. The Foundation Load Specification provides fatigue load spectra and Markov
Matrices that define the load cycles and magnitudes that should be considered in this degradation assessment.
The total stiffness of the wind turbine system is a function of the tower stiffness, the foundation stiffness, and the stiffness
of the underlying soil. The soil stiffness is a function of the subgrade soil properties. Accordingly, the geotechnical engi-
neer must conservatively establish the properties of the subgrade soil in order to ensure that the overall wind turbine sys-
tem stiffness is accurately defined.
General Electric supplies the foundation loads to the project foundation engineer. The foundation engineer then provides a
first initial estimate of the foundation footprint size and magnitudes of the design loads at the base of the foundation to
the project geotechnical engineer. The soil properties used for calculations must be applicable for the foundation’s final
geometry, the General Electric supplied loads and the site’s actual soils. The final assumed static and dynamic properties of
the soil supporting the final foundation size will be stated in a project geotechnical report issued by the geotechnical engi-
neer to the project foundation engineer and the project Owner. The report must confirm all assumptions on soil properties
made in the foundation size calculations.
The settlement analysis should distinguish between immediate elastic settlements and time-dependent consolidation set-
tlements. The analysis should provide information on the tolerance or variability in the settlement calculations.
The actual bearing area under the foundation should be used when considering settlement and bearing capacities, that is
the area based on considering the eccentricity (e) of the vertical reaction (V) on the foundation. Typically this would be a
smaller oval shaped area offset from the center on foundation with its center point eccentricity distance (e) based on the
amount of tower base moment (M), where e = M/V. Refer to Section 8.3 of DNV/Riso 2002.
For the tower, a foundation inclination of 3mm/m due to foundation differential settlement is permissible. This differential
settlement limit is that from the uniform dead load, and the variation in soil properties across the foundation footprint, and
must be demonstrated by the foundation designer by adequate analysis. The inclination during turbine operation as a
result of the extreme or operational loads need not be considered in this 3mm/m limit. The dynamic analysis of the tur-
bine accounts for the additional rotations of the foundation due to the operational and extreme loads. This analysis is
based on the foundation providing the minimum rotational stiffness specified in the Foundation Load Specification.
Uniform foundation vertical settlement from the combined mass of the turbine and foundation will normally not control
the design, given the more restrictive requirements on rotational stiffness, and the low magnitude of the gravity loads as
compared to the operational overturning moment loads. Nonetheless, the geotechnical engineer should confirm that the
vertical long-term settlement resulting from the combined gravity weight of the turbine and foundation is less than 20mm.
For projects with raft (spread) foundations in the United States and Canada, the safety factor on the extreme unfactored
loads should never be less than 2.0 for soil shear failure considerations (typical values are 3.0 for normal operating and
fatigue loads and 2.26 on extreme loads). This is based on the weakest failure curve through the soil, which can lead to
overturning. The geotechnical engineer has the final responsibility for determining the minimum safety factor.
For single pole type lateral pile systems (monopile or similar), the size of the foundation will typically be dictated by the lim-
its on allowable deflections and rotations, nonetheless, failure of the pile itself is still checked.
Wind turbines are structures that are subject to strong dynamic stresses. Dynamic system properties, in particular the
natural frequencies of the overall system consisting of the foundation, tower, machine head and rotor, are therefore of
particular importance for proper load determination. In the wind turbine design assessment, the foundation and underly-
ing soil is not regarded as a rigid restraint, but is modeled by approximation using equivalent springs (torsion and linear
springs), which are each dependent on soil properties. Refer to Figure 27.
Given this, the foundation must provide the minimum stiffness levels assumed in the wind turbine design, in order to insure
that the total system has the minimum fundamental eigenfrequency considered in the wind turbine design.. Refer to the
Foundation Load Specification for the minimum stiffness that is required of the foundation. Note that it is not possible for
the foundation to be too stiff because the wind turbine design is also evaluated with the assumption that the base of the
tower is 100% fixed for all rotations and translations.
When using data obtained from literature, attention must be paid whether one is dealing with the modulus of stiffness [ES]
or with the Young’s modulus of elasticity [E]. At larger Poisson’s ratios in particular, the two values differ significantly.
ES represents the coefficient of compressibility or constrained modulus, that is, the ratio of stress to strain for one-
dimensional loading (the plane wave modulus and it is the inverse of the coefficient of volume compression). English texts
often represent this parameter with the symbol M [MN/m²].
The conversion is the same for static and dynamic values, except dynamic parameters additionally receive the index d.
When consulting tables, it must be taken into account that the dynamic modulus of elasticity exceeds the static modulus
of elasticity by a factor of 2 (non-cohesive soils) to 30 (cohesive soils)! The use of the following equations is based on the
assumption of an elastic half space model to verify that the required foundation resistance to rotations and translations
has been met. Additionally, the equations only apply to isotropic soils; not highly layered site soils.
For a spread gravity raft type foundation (the equations are from References [5-4] and [5-5]):
Horizontal Stiffness
(horizontal translation)
Rotational Stiffness
(rocking)
For the case of the rotational stiffness for an octagonal shaped foundation- assume use of a rigid circular footing resting
on the surface of a semi-infinite elastic body where:
For a rigid circular footing the equivalent rocking mode spring is given as follows, assuming no contribution from any em-
bedment coefficients:
Where geophysical methods are used to measure in place shear and compression wave velocities:
The value of dynamic constrained modulus [Esd] may be much higher than the static modulus [Es] depending on soil type.
See interaction charts in the literature. Based on these relationships the structural engineer can prepare a chart based on
the expected geometry of the foundation showing the minimum values of [Esd] and [Gd] required to meet the stiffness cri-
teria specified in the Foundation Load Specification for resistance against foundation rocking. This chart can be filled in for
rO =
Rewriting previous equations:
Where rO is the radius of an equivalent circle that has the same area as the octagon foundation. Based on this term for
[Esd] and relationship to [Gd], the chart can be prepared listing [Esd] and [Gd] for each value of ν from 0.30 through 0.47.
The Foundation Load Specification specifies the stiffness requirements for typical raft (mat or spread) foundations, or con-
crete pile cap plus deep driven pile type foundations. If a different foundation system such as a pole type foundation is
used instead, the foundation designer must provide a foundation that still maintains the same equivalent total system fre-
quency (tower plus foundation). More specifically, the foundation system must provide a stiffness at the tower base that
still produces a complete system eigenfrequency that is sufficiently high enough to be adequately removed from the ma-
chine operational exciting frequencies. Meeting the minimum stiffness values specified in the Foundation Load Specifica-
tion insures that the tower eigenfrequency remains in the correct range. Moreover, a foundation that is too ‘soft’ creates a
total combined system frequency that is too low, which changes the tower extreme and fatigue load cases. The tower
extreme and fatigue loads are calculated based on spread or pile cap systems, which have a point of rotation close to the
base of the tower (at the base of a typical foundation). If the foundation rotates about a much lower point, it then acts as
an extension to the actual tower. Mono-pier type foundation systems always move the effective point of foundation rota-
tion down further from the tower base than a normal thickness spread or raft foundation.
Pole type foundations behave as laterally loaded short piles. The stiffness against horizontal displacement and rotation of
the foundation is nonlinear due to the nonlinear nature of the soil stiffness. The nonlinear lateral soil resistance curves for
the specific soils at the site, and any variation in depth, are to be used to analyze the foundation stiffness for the operating
and extreme loads. Geotechnical data such as the soil unit weight and friction angle, the un-drained cohesive strength,
the soil strain parameter E50, and the soil p-y curves and t-z curves are needed for the nonlinear lateral pile analysis.
The cyclic nature of the wind turbine loading will significantly lower the resistance provided by some surrounding materials
on short embedded pole type foundations. The design allowables for the soils or rock surrounding the foundation must be
accordingly reduced. Moreover, when considering the cyclic load effects on the soil and other elements, the actual level of
soil strain during the operational loads is to be used. The evaluation is to consider the number and magnitude of the load
cycles specified in the Foundation Load Specification Load Spectra and Markov Matrices.
In summary, for this type of short pole foundations, the foundation designer will provide a foundation that satisfies the re-
placement general stiffness terms as specified in the Foundation Load Specification, and as calculated at the top of the
monopile head (interface to the tower base). This equivalent top-of-pile-head stiffness matrix includes the on-diagonal
and off-diagonal stiffness terms. The stiffness used for the P-Y and T-Z curves will be based on the tower base moment
and shear loads occurring during rated wind speed turbine operation, which is DLC 1.1 given in the table “Load Case for
Check Against Tension Loading in the Piles”, in the Foundation Load Specification.
Figure 30 Nonlinear springs for long pile and a short rigid pile
Figure 14: Nonlinear springs for long pile and a short rigid pile
Figure 31 Model for short pile type foundation- decompose into two separate models
If the model is separated at the base of foundation and top of pile head in order to enable separate design of the tower
and the foundation, consider that there will always be a slope to the top of the pile and a horizontal displacement as de-
picted in Figure 31. For a spread foundation model, a simple horizontal spring and rotational spring should be adequate.
For a pole foundation system, the springs are nonlinear (soil strain rates increase with increasing level of load). The
amount of spring stiffness at the level of normal operational loading is considered. When a short pile is used then the fol-
lowing occurs (see Figure 31 for deflected shape showing θ and ∆)
First, write the relationships for a planar problem (since soil properties are normally the same in both directions, one can
extend relationships to a 3 dimensional solution if a 6X6 matrix is used for x, y, z directions).
Since the pure axial spring stiffness will not change the fundamental frequency for lateral motion of the nacelle (fo flex), the
vertical x direction can be dropped, producing a 2x2 matrix.
K22 = pure lateral translation stiffness provided by the foundation in (KN/m) = = unit of force applied in horizon-
tal y direction per unit displacement in horizontal y direction
K33 = rotational stiffness provided by the foundation in (KN-m/rad) = = unit of moment M applied about the z
axis per unit of rotation Θ about this z axis that this moment produces
Not shown on Figure 32 but occurring at the same time are the following two parameters:
K23 = = unit of force applied in the horizontal y direction per unit of rotation Θ about the z axis (KN/rad)
K32 = = unit of moment M applied about the z axis per unit of displacement in the horizontal y direction (KN-m/
m)
When a unit lateral load is applied to the top of foundation, the resistance offered by the foundation is resolved into two
componentss which sum together for the total stiffness. The unit horizontal load will create a horizontal displacement uy
and a rotation in the pile of amount θz at the top of pilehead. The pile offers resistance to both motions.
CASE I CASE II
Use Case I to find the value of the term K23 = . Set the pile head horizontal displacement uy = 0, that is, the top of
pile head is free for rotation only (simple support). Apply a unit moment M, and use a nonlinear analysis of the soil layers to
solve for the value of horizontal reaction H that will result. Also find the rotation value θz that this unit load produces. Then
K23 = -H/ θz and K33= M/ θz
Use Case II to find the value of the term K32 = . Set the pile head rotation as 100% fixed (θz = 0), that is, the top of
pile head is free for horizontal translation uy only. Apply a unit lateral load P and use a nonlinear analysis of the soil layers
to solve for the value of rotational moment M that will be carried by the fixity of the top of pile for rotation θz. Also find the
horizontal translation value uy that this unit moment produces. Then K32 = M / uy and K22 = H / uy.
By the geometry and statics, the values of K23 and K32 must be equal and opposite. There is a coupling between these
two off-diagonal terms of the total stiffness..
With F = [K] [∆] use direct inversion to solve the problem for the values of displacement. This matrix arithmetic will result in:
The denominator of the expressions for uy and θz must always be greater than 0, or:
This expression should always be verified as true for the combination of terms used. Also note that the numerator of the
expression for uy is the total displacement at the top of the pile. As the off-diagonal stiffness value is reduced, the eigen-
frequency of the system will be lowered.
To satisfy the required total stiffness at the tower/foundation interface, curves relating and
Figure 36 Example curves relating stiffness terms for a short lateral pile foundation
Foundation excavation dewatering due to high ground water levels, presence of water bearing strata, or impermeable
materials (rock, clays, etc.) must be considered as required by specific site conditions. Where excavation is made below the
ground water level, a dewatering system shall be installed with sufficient capacity to maintain ground water elevation at
not less than 1 m (3 ft) below the working surface of the excavation. Discharge from the dewatering system shall be in ac-
cordance with applicable regulations and permits.
The chemistry of the soil should be checked at three levels to determine if sulfate resistant cement will be required for con-
crete foundations. Also test for soil pH, water-soluble sulfate in the soil and groundwater, and water-soluble chlorides.
Excavations should be maintained and protected against earth collapse from natural causes or subsequent construction
work. Excavations should have stable slopes (typically 3 horizontal to 1 vertical), as appropriate, to meet local soil condi-
tions and local safety codes and regulations. The length of time foundation excavations are left open needs to be mini-
mized at sites subject to heavy rains or erosion of evacuations sides.
After the foundation has been excavated to the bearing level, but prior to commencing with the foundation construction,
the Buyer’s geotechnical engineer is to verify that the soil conditions at the bottom of the excavation are consistent with
the assumptions in the project geotechnical report. If the soil conditions are deemed to be inadequate, then the geotech-
nical representative should direct the contractor on the measures needed to provide an adequate subgrade. One such
measure is additional excavation, and replacement of some of the existing materials with new-engineered materials. Lo-
cally soft or yielding areas shall be excavated and replaced with compacted backfill as required. Bearing grades should be
cleaned and kept dry prior to placing the concrete.
The Constructor should use a lean concrete layer to improve the excavation work surface. This layer should be placed as
soon as possible after the excavation is complete to protect the subgrade bearing capacity from damage (against hard
rains for instance). The thickness of the lean concrete layer depends on the ground stiffness. Typical thickness is approxi-
mately 100mm. The lean concrete layer must be level and of a uniform thickness. This allows for support of reinforcement
chairs and insures proper clearances of the reinforcing bars. Also, the foundation drawings should specify a thickened
layer of concrete or a small square foundation at the landing location for the posts that are used to support the turbine
embedded anchor cage prior to the foundation concrete placement. This thickened layer or small square foundation must
be sufficient to safely bear the weight of the concentrated dead load without incurring settlement. Uneven settlements
under the temporary support posts must be avoided since may require re-levelling of the turbine foundation anchor cage,
which is difficult to do after the reinforcement has been placed.
For foundations that rely on driven deep piling, the geotechnical engineer should verify that the subgrade at the base of
the excavation can support the weight of the uncured new concrete. This engineer is to advise if additional measures are
required to carry this plastic concrete weight without excessive deformations of the subgrade. This should be coordinated
with the structural engineer for the foundations.
For caisson or pole type foundations (Patrick and Henderson Tensionless Pier or similar) blasting of rock to create the exca-
vation is prohibited. Rock excavation will have to be conducted with hydraulic excavators, hydraulic hoe ram or hammer
excavator, track hoe or other mechanical equipment.
The foundation drawings are to clearly state the minimum in-place unit weight for any backfill used for overturning
stability. The project geotechnical report should indicate if the site excavated material is suitable for backfill, and list any
requirements for improving the excavated material as applicable. If off-site material is required, the report should list the
testing and installation requirements. Moreover, the project geotechnical report, the project construction specifications or
the project drawings are to give the compaction requirements for the fill and backfill material.
The backfill soil must be tested after it has been placed and compacted to confirm that this minimum unit weight has been
provided. During this testing verification, the unit weight of the compacted material must not be overestimated in order to
avoid changes during the construction phase.
United States
Material used as load bearing structural fill should be compacted to a least a minimum of 95% of the maximum dry densi-
ty as determined by ASTM D1557 (modified Proctor) or equal. The natural moisture content of the material shall not devi-
ate more than 2 percent of optimum. Material used as non-load bearing backfill shall be compacted to a minimum of
90% of ASTM D1557 or equal. Natural moisture content of material shall not deviate more than 3 percent of optimum.
Consult the project specific excavation and backfill specification to insure final requirements are not greater. These re-
quirements for structural fill and backfill minimum density also apply to the soils below the exterior transformer foundation
(if applicable). Settlement of the transformer pad towards the turbine is to be precluded. The surface of the transformer
pads should be checked for levelness prior to site demobilization, and any pads for which settlement towards the tower is
detected should be corrected.
The foundation must have suitable provisions to account for rainstorm run-offs, including the run-off of rainwater from the
surface area of the wind turbine hub, nacelle and tower. Such provisions include providing a crushed stone drainage ring
around the perimeter of the foundation pedestal, and a drainage pipe to carry the rainwater to the outer perimeter of the
foundation; all sized for a 10-year storm event. See Figure 37.
[5-1] Guidelines for Design of Wind Turbines, Edition 2; Det Norsk Veritas , Copenhagen and Wind Energy Department,
Riso National Laboratory, 2002
[5-2] Army TM 5-818-1 Air Force AFM 88-3, Chap. 7 “Soils and Geology Procedures for Foundations Design of Buildings
and Other Structures, Department of the Army and the Air Force, Oct. 1983
[5-3] Richart, Hall and Wood: Vibrations of Soils and Foundations 1970
[5-4] Empfehlungen des Arbeitskreises 1.4 „Baugrunddynamik“ der Deutschen Gesellschaft für Geotechnik e.V. (DGGT),
Mai 1998. Bautechnik 75 (1998), Nr. 10, S. 792-805
[5-5] Empfehlungen des Arbeitskreises 9 "Baugrunddynamik" der Deutschen Gesellschaft für Erd- und Grundbau e. V.,
Juli 1992. Bautechnik 69 (1992), Nr. 9, S. 518-534
6 Foundation Construction
Pre-Construction
• Obtain the site geotechnical investigation report, including the parameters needed to define the site seismicity as per
the governing code
• Obtain the site soil properties for the grounding design (resistivity), and develop the site specific grounding layout / con-
struction drawings
• Site Quality Control – overseen by an independent civil engineering inspection firm (qualified, certified). Their task is to
control and document the quality of the construction works, the construction drawings and other project specifications.
The quality manager must be competent in civil engineering (foundations) and independent from the construction
company.
• Develop construction schedule
• Implement any required soil improvement measures
• Installation of driven foundation piling (if required)
• Have construction site discussions with the project owner and construction contractor, including reviewing the method
for installing and supporting the wind turbine foundation anchor cage during the concrete placement
Construction QA/QC is the responsibility of the Buyer. Proper supervision is critical in order for the foundations to meet
the intended service life. Proper supervision should be provided for all inspections, testing and record keeping of the
foundation construction. All applicable National and Local standards that address construction quality are expected to
be adhered to. The Buyer is responsible for providing to the Contractor the complete specifications for all necessary
activities including reinforced concrete construction, grouting, excavation and backfilling, surveying, and clearing and
grubbing.
• Use of an independent testing agency (certified and/or qualified) for testing the concrete cubes / cylinders
• Use of a competent concrete production facility and supplier
• Drafting a design mix report including all additives and admixtures
• Securing cement certificates and mill test reports
• Use of aggregate laboratory tests for mechanical and chemical properties of aggregates
• Use of a review and approval process for reinforcing bar shop drawings (where these type drawings are used for
fabrication)
• Production concrete testing including all additives and admixtures
• Securing of delivery tickets recording batching information for truck-delivered concrete
• Observation of the concrete placement, and confirming adherence to the relevant standards and specifications (for
example, dwell time between concrete placements, fall height of the concrete)
• The design and construction of the tower base flange grout joint has to be done with high care considering the high
amount of fatigue loading. Figure 38 depicts the outcome of a poor grout joint design / construction
• For pre-stressed anchor bolts, the correct amount of pretension must be applied, and the anchor bolt must not be
bonded to the concrete along the entire embedded length, otherwise bolt breakage may occur as illustrated in Fig-
ure 39
• The anchor bolt tensioning device may require a minimum engagement length of threads above the anchor bolt nut,
and prior to the concrete placement, the anchor bolt placement should be verified as providing this minimum en-
gagement length
• Anchor bolts must be plumb and centered in the tower base flange holes for proper tensioning
• The anchor bolts and the tower / tower base ring need to be protected during the concrete placement and construc-
tion of the grout joint. Lack of proper protection may require extensive cleaning of the parts or proper pretension
may not be achieved and tensioning tooling may be damaged
• The foundation must be properly cured, including suitable after-treatments, to minimize foundation cracking
• The foundation electrical conduits should be confirmed as having suitable provisions such as dry animal repellent to
prevent rodents from entering the turbine through the foundation
Checklist
This checklist itemizes some of the more important criteria. This checklist should not in any way be considered an ex-
haustive listing.
Preliminary
Clause Item
Remarks
The Foundation Load Specification being referenced for the turbine founda-
2.0 tion loads is for the turbine model under consideration, e.g., correct hub
height, rotor diameter, MW rating, etc.
Section Section
Clause Item
I II
Foundation design and calculations comply with applicable local and National
1.1 X
code and regulations
Selection and use of partial load factors is in accordance with governing de-
2.2 X
sign standard
Ultimate limit state of the concrete under and above the embedded anchor ring
2.2 X
calculated and confirmed
Ultimate limit state of the vertical reinforcement surrounding the anchor cage
2.2 X
calculated and confirmed
2.2 X Ultimate limit state of all reinforcements bars calculated and confirmed
2.2 Soil pressures (mean value and edge pressure) are within design allowables
X
3.4 for appropriate load cases
All foundation elements are designed for operational life fatigue loads includ-
2.3 X
ing the concrete, reinforcement and anchor bolts / anchor cage
2.3.5 X Grout joint is designed for operational life fatigue loads
Tower inclination moment has been included in the foundation load calcula-
2.5 X
tions
3.1 X Foundation design accounts for buoyancy effects as applicable
3.2 X Foundation provides the minimum required dynamic stiffness
3.3 X Calculated foundation inclination and vertical settlement are within limits
3.4 X No foundation lift-off
3.4 X No excessive foundation overturning
3.4 X No foundation sliding
3.4 X No soil shear failure
4.2.1 X Anchor bolt diameter is as per the Foundation Load Specification
Converter Cooling
Circuit 200 L at 50%
Glysantin® G05® Coolant Xn (Harmful)
(Ideally replaced by with water
non-harmful P44)
Manufacture of N
Slipring hub cleaning Cleaner, Spray electrical 500mL/machine (Environmentally
Cleaner (Weicon) equipment hazardous)
Initial charge:
approx. 2.2kg
per yaw motor
Relubricating
Blades & Yaw quantity per
Bearings (Not used MOBILITH SHC 460 Grease yaw motor: Non-hazardous
in EU) 0.2kg
Apply by hand
Pitch teeth CEPLATTYN BL Lubricant Non-hazardous
200g / blade
Minimal and
solidified, service
actions only during
significant Loctite 586 Adhesive 1 drop per bolt Xn
mechanical
disassembly, not
before year 8
Minimal and
solidified, service
actions only during
significant Loctite 640 Adhesive 1 drop per bolt Xi
mechanical
disassembly, not
before year 8
LIEBHERR
0,1 kg for the 3
Pitch drive SPEZIALFETT 1026 Grease Non-hazardous
pitch bearings
LS
Xi, R43
(sensitizing),
Maintenance Industrial 0.1 L / WTG at
HM Classico R52/53
cleaning purifier 10%
(Environmentally
hazardous)
Very little
Spray, only
A film over the blade Xi, F+ (extremely
OKS 221 Lubrifiant (respray when
studs changing blade flammable), N
before
tightening)
Cleaning
solvent for
Slip ring hub Magnetic 0.5 L / WTG / F (easily
SRB4E
cleaning Heads, Printed maintenance flammable)
Circuit,
Soldering Flows
NORDEX N117
3,5° + 2 m
4,38 m
A=10.715 m²
116,8 m
3,91 m
178,4 m
120,0 m
118,0m
14,54 m
Maßstab/scale: 10 m
Nordex N 117/3000
Variante Trafo im Turm/ variant internal
transformer
+1,10 m
+0,0
Nabenhöhe/ Hub heigth: 120 m
117,8 m
Nordex N 117/3000
Variante Trafo im Turm/ variant internal
transformer
Nabenhöhe/ Hub heigth: 120 m
3,5° + 2 m
4,38 m
A=10.715 m²
116,8 m
3,91 m
178,4 m
120,0 m
118,0 m
14,54 m
Diese Darstellung ist nicht maßstabserecht
This image is not according scale
Maßstab/scale: 10 m
Nordex N 117/3000
Variante Trafo außerhalb Turm/ variant
+1,10 m external transformer
+0,0 Nabenhöhe/ Hub heigth: 120 m
117,8 m
Nordex N 117/3000
Variante Trafo außerhalb Turm/ variant
external transformer
Nabenhöhe/ Hub heigth: 120 m
Sales document
K0801_041798_EN
Revision 01 / 2013-01-18
Copyright
Copyright 2013 by Nordex Energy GmbH.
This document including its presentation and content is the intellectual property of Nordex
Energy GmbH.
Any disclosure, duplication or translation of this document or parts thereof in printed,
handwritten or electronic form without the explicit approval of Nordex Energy GmbH is
explicitly prohibited.
All rights reserved.
Contact details
For questions relating to this documentation please contact:
Nordex Energy GmbH
Langenhorner Chaussee 600
22419 Hamburg
Germany
http://www.nordex-online.com
info@nordex-online.com
1. Set-up................................................................................................................... 4
1.1 Tower .................................................................................................................... 4
1.2 Rotor ..................................................................................................................... 6
1.3 Nacelle .................................................................................................................. 6
1.4 Auxiliary systems .................................................................................................. 8
4. Revision index................................................................................................... 15
K0801_041798_EN Page 3 of 15
Revision 01 / 2013-01-18 Sales document
1. Set-up
The Nordex N117/3000 wind turbine is a speed-variable wind turbine with a rotor
diameter of 116.8 m and a nominal power of 3000 kW. This wind turbine is
designed for 50 Hz or 60 Hz. The wind turbine is designed for class 2a in
accordance with IEC 61400-1.
The wind turbine Nordex N117/3000 is made up of the following main
components:
● Rotor, consisting of rotor hub, three rotor blades and the pitch system
● Nacelle with drive train, generator and yaw system
● Tubular tower or hybrid tower with foundation
● Medium-voltage transformer (MV transformer) and medium-voltage
switchgear (MV switchgear)
1.1 Tower
The Nordex N117/3000 is erected on tubular steel towers or hybrid towers for
different rotor hub heights and wind zones.
The tubular steel tower is a cylindrical tower. The top section is conical.
Depending on the hub height, it consists of four to seven tower sections.
Corrosion protection of the tubular steel tower is ensured by a tower surface
coating system according to ISO 12944.
A service lift, the vertical ladder with fall protection system as well as resting and
working platforms inside the tower allow for a weather-protected ascent to the
nacelle.
The Nordex N117/3000 turbine may be erected on a hybrid tower, too. The
bottom part of the hybrid tower consists of a concrete tower and the top part of
a tubular steel tower with two sections.
The foundation depends on the ground conditions at the intended site. An
anchor cage is imbedded in the foundation for anchoring the tower. Tower and
anchor cage are screwed together.
In the standard version, the tower base only accommodates the switch cabinet.
The switch cabinet contains important components of the electronic controls,
turbine PC, frequency converter, main switch, fuses and outputs to the
transformer and to the generator.
The frequency converter is equipped with a water cooling system. The water
which was heated in the frequency converter is cooled in a water/air heat
exchanger. It is located at the outside close to the tower door.
The MV transformer and MV switchgear are located in a separate transformer
substation near the wind turbine.
1 Soil backfill
2 Tower anchoring
3 Stairs
4 Tower door
5 Ventilation/cooling
6 Power cables
7 2nd Tower platform
8 Switch cabinet
9 1st Tower platform
10 Transformer substation
As an option, the MV transformer and MV switchgear can also be installed in the
tower base. In this case, the components are arranged in the tower base on
three different levels:
● The MV transformer on the foundation
● The MV switchgear on the 1st tower platform
● The switch cabinet with frequency converter on the 2nd tower platform
In the case of a separate transformer substation, the MV transformer is usually
designed as an oil transformer. If the transformer is installed inside the tower, a
dry-type transformer is used.
1.2 Rotor
The rotor consists of the rotor hub with three pitch bearings and three pitch
drives for blade adjustment as well as three rotor blades.
The rotor hub has a modular design. The base frame of the rotor hub is made
up of a stiff cast structure. Onto this element pitch bearing and rotor blade are
mounted. The rotor hub is covered with the spinner which enables the direct
access from the nacelle into the rotor hub.
The rotor blades are made of high-quality glass-reinforced and carbon-fiber
reinforced plastics. Each rotor blade is equipped with a highly effective lightning
protection system.
In accordance with the guidelines IEC TS 61400-23 and GL IV-1 (2400) the rotor
blade is statically and dynamically tested with loads that were even beyond
standard design requirements.
The pitch system serves to adjust the pitch angle of the rotor blades set by the
control system. For each individual rotor blade, the pitch system comprises an
electromagnetic drive with 3-phase motor, planetary gear and drive pinion, as
well as a control unit with frequency converter and emergency power supply.
Power supply and signal transfer are realized through a slip ring assembly
located in the nacelle.
1.3 Nacelle
The nacelle contains essential mechanical and electronic components of the
wind turbine. The nacelle is mounted on the tower in rotating bearings.
The rotor shaft is mounted on the rotor bearing in the nacelle. In the rotor
bearing a mechanical rotor lock is integrated used to securely lock the rotor.
The gearbox increases the rotor speed until it reaches the speed required for
the generator.
The bearings and gearings are continuously lubricated with cooled oil. A 2-stage
pump enables the oil circulation. A combined filter element with integrated
coarse and fine filter removes solids. The control system monitors the level of
contamination of the filter elements (differential pressure measurement).
Optionally, an additional offline filtration can be installed (super fine-mesh filter
5 µm).
The gear oil used for lubrication also serves as a gearbox cooling. The
temperatures of the gearbox bearings and the oil are continually monitored.
When the optimum operating temperature is not reached yet, a thermal bypass
shorts the circuit and conducts the gear oil back to the gearbox. If the optimum
working temperature of the gear oil is exceeded it is cooled down.
The gearbox cooling is achieved with an oil/water cooler with stepped cooling
capacity. The cooler is installed directly at the gearbox. The heated cooling water
is recooled together with the cooling water of the generator in a passive cooler
on the roof of the nacelle.
1
2
3
4
5
6
7
15
14
13
12
11
10
9
8
1 Heat exchanger
2 Switch cabinet 2
3 Switch cabinet 1
4 Hydraulic unit
5 Gearbox
6 Rotor shaft
7 Rotor bearing
8 Yaw drive
9 Gear oil cooler
10 Rotor brake
11 Coupling
12 Generator
13 Cooling water pump
14 Hatch for on-board crane
15 Switch cabinet 3
The generator is a 6-pole double-fed asynchronous machine. An air/water heat
exchanger is mounted on the generator. The cooling water is recooled together
with the cooling water of the gearbox heat exchanger in a passive cooler on the
cabin roof.
The mechanical rotor brake supports the aerodynamic braking effect of the
rotor blades as soon as the speed falls below a defined value and finally stops
the rotor. The aerodynamic braking effect of the rotor is achieved by adjusting
the rotor blades perpendicular towards the rotation direction. The rotor brake
consists of a brake caliper which acts on the brake disk mounted behind the
gearbox.
The yaw drives optimally rotate the nacelle into the wind. The four yaw drives
are located on the machine frame in the nacelle. A yaw drive consists of an
electric motor, multi-stage planetary gear and drive pinion. The drive pinions
mesh with the external teeth of the yaw bearing.
If positioned properly the nacelle is locked by means of a electric brake system.
It consists of several brake calipers which are fastened to the machine frame and
act on a brake disk. In addition, the electric motors of the yaw drives are
equipped with an electrically actuated holding brake.
3
1
4
1 Machine frame
2 Yaw drives in mesh with yaw bearing teeth
3 Yaw bearing
4 Brake caliper
The hydraulic unit provides the oil pressure for the operation of the rotor brake
and the yaw brakes.
2. Functional principle
The turbine operates automatically. A programmable logic controller (PLC)
continuously monitors the operating parameters using various sensors,
compares the actual values with the corresponding setpoints and issues the
required control signals to the WT components. The operating parameters are
defined by Nordex and adapted to the individual site.
When there is no wind the WT remains in idle mode. Only various auxiliary
systems, such as heating and gear lubrication, and the PLC, which monitors the
data from the wind measuring system, are operational. All other systems are
switched off and do not use any power. The rotor idles.
When the cut-in wind speed is reached, the wind turbine changes to the mode
'Ready for operation'. Now all systems are tested, the nacelle aligns to the wind
and the rotor blades turn into the wind. When a certain speed is reached, the
generator is connected to the grid and the WT produces electricity.
At low wind speeds the WT operates in part-load operation. In the course of this
the rotor blades remain fully turned into the wind (pitch angle 0°). The power
produced by the WT depends on the wind speed.
When the nominal wind speed is reached, the WT switches over to the nominal
load range. If the wind speed continues to increase, the speed control changes
the rotor blade angle so that the rotor speed and thus the power output of the
WT remain constant.
The yaw system ensures that the nacelle is always optimally aligned to the wind.
To this end, two separate wind measuring systems located at the height of the
hub measure the wind direction. Only one wind measuring system is required for
control system, while the second monitors the first and takes over in case the
first system fails. If the measured wind direction varies too greatly from the
alignment of the nacelle, the nacelle is yawed into the wind.
The conversion of the wind energy absorbed from the rotor to electrical energy
is achieved using a double-fed asynchronous generator with slip ring rotor. Its
stator is directly and its rotor via a specially controlled frequency converter
connected to the MV transformer. This offers a significant advantage enabling
the generator to be operated in a defined speed range near its synchronous
speed.
If certain parameters concerning turbine safety are exceeded, the WT will cut out
immediately, e.g. if the cut-out wind speed is exceeded. Depending on the cause
of the cut-out, various braking programs are triggered. In the case of external
causes, such as excessive wind speeds or grid failure, the rotor is softly braked
by means of rotor blade adjustment.
3. Technical data
Design
3-blade rotor with horizontal axis
Type
Up-wind turbine
Power control Active single blade adjustment
Nominal power 3000 kW
Nominal power starting at wind speeds of
Approx. 12 m/s
(at air density of 1.225 kg/m3)
Operating speed range of the rotor 8.0...14.1 rpm
Nominal speed 12.6 rpm
Cut-in wind speed Approx. 3 m/s
Cut-out wind speed 25 m/s
Cut-back-in wind speed 22 m/s
Calculated service life 20 years
Towers
Hub height 91 m 120 m 141 m
Name R91 R120 PH141
Wind class DIBt 3/IEC 2a DIBt 2/IEC 2a DIBt 2/IEC 3a
Number of tower sections 4 7 2 (+ concrete tower)
Rotor
Rotor diameter 116.8 m
Swept area 10715 m2
Nominal power/area 280 W/m2
Rotor shaft inclination angle 5°
Blade cone angle 3.5°
Rotor blade
Glass-reinforced and carbon-fiberreinforced
Material
plastics
Total length 57.3 m
Total weight per blade Approx. 10.6 t
Gearbox
Type Multi-stage planetary gear + spur gear
50 Hz: i=92 ± 1%
Gear ratio
60 Hz: i=111 ± 1%
Lubrication Forced-feed lubrication
Oil type VG 320
Max. oil temperature 75 °C
Oil change Change, if required
Electrical system
Nominal power PnG 3000 kW
Nominal voltage 3 x AC 660 V ± 10%
Nominal current InG at SnG 3240 A
Electrical system
Nominal apparent power SnG at PnG 3333 kVA
1.00 as default setting
Power factor at PnG 0.9 underexcited (inductive) up to
0.9 overexcited (capacitive) possible
Frequency 50 or 60 Hz
NOTE
The nominal power is subject to system-specific tolerances. During nominal
power, they are ±100 kW. Practice has shown that negative deviations occur
rarely and in most cases are <25 kW. For the precise compliance with external
power specifications the nominal power of the single wind turbine may be
parameterized accordingly. Alternatively, the wind farm can be parameterized
accordingly using the Wind Farm Portal®.
Generator
Degree of protection IP 54 (slip ring box IP 23)
Nominal power 3090 kW
Nominal voltage 660 V
Frequency 50 or 60 Hz
50 Hz: 700 … 1300 rpm
Speed range
60 Hz: 840 … 1560 rpm
Poles 6
Weight Approx. 10.6 t
Generator cooling
Type Water circuit with water/air heat exchanger
50 Hz: 1.3 kW
Cooling water pump
60 Hz: 1.1 kW
Generator cooling
Flow rate Approx. 70 l/min
Coolant Water/glycol-based coolant
Converter cooling
Water circuit with water/air heat exchanger
Type
and thermal bypass
Coolant Water/glycol-based coolant
Pitch System
Pitch bearing Double-row four-point contact bearing
Lubrication of the gearing Automatic lubrication unit with grease
3-phase motor incl. spring-actuated brake
Drive
and multi-stage planetary gear
Emergency power supply Lead-acid batteries
Hydraulic system
Hydraulic oil VG 32
Oil quantity Approx. 20 l
Thermal protection Integrated PT100
Yaw drive
Motor Asynchronous motor
Gearbox 4-stage planetary gear
Number of drives 4
Lubrication Oil, ISO VG 150
Yaw speed Approx. 0.5 °/s
4. Revision index
K0801_041798_EN Page 15 of 15
Nordex Energy GmbH
Langenhorner Chaussee 600
22419 Hamburg
Germany
http://www.nordex-online.com
info@nordex-online.com
Transport, access roads and crane
requirements
Nordex N100/3300, N117/3000
Version delta
This document is a translation from German. In case of doubt, the German text shall prevail.
Table of contents
1 Basic information
This document contains the basics for planning of the road construction and infrastructure of wind
farms for the wind turbine class K08 delta (N100 and N117 with the respective hub heights).
Furthermore component dimensions for the design of transport equipment and cranes are
included.
The planning parameters in this document are given as minimum requirements and may vary
depending on the project.
Detailed information on the infrastructure planning is project-specific and must be agreed to with
all persons involved prior to project start.
Each project location must be analyzed and planned correspondingly with regard to its local and
general safety regulations. In this context, the safety of persons and material is given top priority.
Deviations to the below specifications must be agreed to with Nordex beforehand.
We expressly point out that all values must be regarded as standard values only.
The layout of access roads and hardstanding areas depends on the transportation and
erection method.
The exact design of access roads, crane hardstanding areas and assembly areas must
be agreed to
with Nordex prior to starting the erection work!
Improper design or layout of access roads and crane hardstanding areas may cause
considerably higher logistics and erection costs at a later stage.
2.1 Nacelle
Drive train, rotor hub and further exterior assemblies (obstacle lights, wind sensors, lightning
arrester, etc.) are not assembled for nacelle transport.
The transport frame for the nacelle consists of 4 single supports. They can be used for twist lock
fastening (see chapter 2.6). Otherwise, anti-slip mats must be used for transport.
The nacelle must only be placed on compacted ground or on crane mats.
4000
2572
12700
2400
4300
Fig. 2: Nacelle (front view) with transport supports
The coordinates of the center of gravity of the nacelle are determined without considering the
drive train and the transport support.
2784 3190
approx. 6200
For the rear section of the gearbox a wooden cladding is planned. This cladding is included in the
overall length.
2066 3000
4654 5312
E Lifting point SA 34 32 38
F Support point 35 34 40
G Lifting point SA - 37 43
H Length 48.8 48.8 57.3
All dimensions in meters [m]
SA: Star assembly I Transport height 2.9…3.9 3.2…4.1 3.1…3.6
SBA: Single blade assembly J Transport width 2.9…3.1 2.5…3.9 2.5…3.7
J
K0801_041843_EN Revision 01, 2013-01-22 6 / 32
Transport, access roads and crane requirements
Transformer
With the transformer installed in the tower the transformer substation is omitted.
Individual components per wind turbine:
Transformer Approx. 8.9 t, L x W x H: 2.6 x 1.3 x 2.54 m
Medium-voltage switchgear Max. 1.5 t, L x W x H: 2.0 x 1.0 x 2.0 m
Transformer substation
The transformer substation and wind turbine must not be erected at the same time.
For exact dimensions and weights refer to the manufacturer: Dimensions and weights also
vary within a wind farm depending on equipment and project scope.
The following values can be found:
Length 3.3 to 7.0 m
Width 2.5 to 3.0 m
Height 2.7 to 3.9 m
Weight (incl. transformer, etc.) 15 to 31 t
4390
2227
2710
6907
720
500
755
30
00
2066 3680
Tower type Tubular steel tower MT5 Tubular steel tower MTR5
IEC 1a IEC 1a
• Due to the applied transport equipment, the transport height is 7 cm higher than the tower
diameter.
• Each lifting tackle is 15 cm high. Thus the tower sections become longer.
• Changes in the weight of ±8 % must be considered.
• The centers of gravity deviate from the center of tower sections by approx. 5 %.
• Due to the applied transport equipment, the transport height is 7 cm higher than the tower
diameter.
• Each lifting tackle is 15 cm high. Thus the tower sections become longer.
Special permission is required for the transportation of pre-assembled anchor cages. This may
result in lead times of up to 6 weeks depending on the country.
An N100 R75 and N117 R91 anchor cage is made up of the following parts:
Thicknes Dimensions Weight
WT Name Parts
s Maximum Maximum
Load-spreading
2 77 mm Outside ∅ 4500 mm Approx. 3.7 t
plate
Anchor plate 2 70 mm Outside ∅ 4460 mm Approx. 3.1 t
N100 R75
N100 R91
Anchor bolts 160 M42 L = 3071 mm Approx. 5.4 t
The complete anchor cage, including transport equipment, weighs approx. 12.6 t.
Fig. 9: Anchor cage with 2x80 bolts Fig. 10: Anchor cage 2x100 bolts (N100 R100)
The complete anchor cage, including transport equipment, weighs approx. 23,7t and is quartered
These values represent the current status of development and may vary slightly.
The complete anchor cage assembly set, including transport equipment, weighs approx. 30.6 t
and is quartered.
The weights may vary slightly depending on the tower.
3.1 Loads
The access roads for each wind turbine must be capable of supporting the following loads:
Weight of vehicles
- Max. load per axle: approx. 12 t
- Max. overall weight: approx. 165 t
3.2.1 Slopes
If the surfaces meet the descriptions in Chapter 3.5, slopes of approx. 8 % must not be exceeded
at any rate. If there are slopes exceeding 8 %, Nordex must always be consulted.
Against reimbursement of the extra costs, additional tractor units can be used so that slightly
steeper slopes can be handled and under the provision of a suitable surface condition. As the
length of the entire tractor unit becomes larger this must be considered in road construction
planning, especially in terms of bend radii.
Slopes of up to 8 % can only be accomplished when driving forward. In the case the transports
can only manage the slope driving backwards, partly depending on the site-specific conditions,
the maximum inclination must not exceed 1.5 % (without additional tractor units). On these road
sections, the road foundation must be taken into account (see Chapter 3.5) as the traction is
completely shifted to the front axle of the tractor unit. An adapted design and/or the use of other
materials for road construction may be required for the relevant sections.
The lateral tilt must not be greater than 2 %.
Depending on the season and the weather the requirements for slopes may vary so that
additional tractor units or vehicles for braking must be used.
N100 N117
3.4.1 Bends
The following sketches exemplarily illustrate the space required for the rotor blade in a bend:
Fig. 13: Minimum required extension 70° bend N100 (left and right turn)
Fig. 14: Minimum required extension 90° bend N100 (left and right turn)
Fig. 15: Minimum required extension 120° bend N100 (left and right turn)
Fig. 16: Minimum required extension 70° bend N117 (left and right turn)
Fig. 14: Minimum required extension 90° bend N117 (left and right turn)
Fig. 15: Minimum required extension 120° bend N117 (left and right turn)
The continuous lines depict the travel of the truck. The dashed lines mark the areas covered by
the vehicle and the rotor blade. The outer area covered is determined by the length of the rotor
blade protruding at the rear.
The covered area (dashed) must be free of all obstacles, i.e. trees, streetlights, buildings, masts,
etc. This area must be max. 20 cm above the paved level of the accessible road.
The construction of bends to be accessed backwards must enable the respective turbine types to
travel the whole covered radii specified in chapter 3.4. due to the maximum turn angle of the rear-
wheels of less than 70 %. The capacity of the vehicles deployed normally matches the loads that
must be moved. The deployment of additional tractors and/or other vehicles, however, cannot be
excluded due to local conditions. Since in case of pushing other forces act on the vehicle and its
load and the trajectory within the lane cannot be influenced damages to the road surface on
construction site may occur. These damages must be repaired immediately , respectively before
other heavy loads pass through.
The exact values depend on the vehicles used and the individual local situation.
The maximum slope or incline in bend radii/bend areas is < 2 %. A bend with slope/incline shall
be constructed in a manner that the road surface is on an even level to protect the components
from hitting the ground. The area that lay 50 m around the peak is the bend area and must be
constructed as an even surface.
The dimensions of the funnel lanes derive from the length of the components (refer to Chapter
2.4) with 5 m to be added to serve as manoeuvring space = width of the lane, the bend radii must
be considered as specified below. The width of the smallest place (front side) is < 4.5 m. If a
funnel lane shall be used as a parking place for more than 1 vehicle the lane must be broadened
by another lane of 4.5 m width per vehicle. In junction areas the turning lanes shall always be
adjacent , not opposite to one another. Depending on the location it should be considered if four
lanes are required or do making sense in junction areas.
30-100 cm
Subsoil
Min. 4.5 m
• Instead of gravel, base and top layer may be made of broken bricks or concrete (free of other
demolition waste).
• All layers and the subsoil must be compacted using proper machinery to allow for heavy loads
• Even road surface
• Proper drainage for all access roads must be ensured (cross slope of 1 to 2 %).
Proper water transport (e.g., in the lateral trenches or under access road junctions) must be
The results of all tests must be documented in full. This must be done in a professional manner
and illustrated with tables and diagrams and submitted to Nordex. The testing points are to be
presented in the diagrams including positions and heights. The soil profile of access roads and
crane hardstanding areas also require neat presentation.
4 Crane requirements
One main crane and, at least, one auxiliary crane are required for the wind turbine erection. The
auxiliary crane must be able to change its position several times before, during and after the wind
turbine erection.
• The required hook height is:
- Hub height + 10 m (e.g. N100 R100: 110 m)
- Exception: N117 R120: Hub height + 20 m (e.g. N117 R120: 140 m)
Examples
• Example 1 shows a crane hardstanding area for wind turbines up to 80 m hub height and with
just-in-time delivery. Higher transport costs are generally to be expected for this variant. The
final layout for the specific site must be planned after the site has been inspected.
• Example 1a shows the hardstanding area for wind turbines with tower heights of up to 80 m
and with a storage area for the delivery of turbine components including tower sections and
blades. The final layout for the specific site must be planned after the site has been inspected.
• Example 2 shows a crane hardstanding area for wind turbines up to 100 m tower height and
with just-in-time delivery. Higher transport costs are generally to be expected for this variant.
The final layout for the specific site must be planned after the site has been inspected.
• Example 2a shows the hardstanding area for wind turbines with tower heights of up to 100 m
and with a storage area for the delivery of turbine components including tower sections and
blades. The final layout for the specific site must be planned after the site has been inspected.
• Example 3 shows a crane hardstanding area for a N117, R120 and with just-in-time delivery.
Higher transport costs are generally to be expected for this variant. The final layout for the
specific site must be planned after the site has been inspected.
• Example 3a shows the hardstanding area for a N117, R120 with a storage area for the
delivery of turbine components including tower sections and blades. The final layout for the
specific site must be planned after the site has been inspected.
• Example 4 shows the hardstanding area for wind turbines with concrete hybrid tower (PH 141)
and with optional storage area for the delivery of turbine components including tower sections
and blades. The final layout for the specific site must be planned after the site has been
inspected.
In addition to the examples shown above, a clear assembly area for the rotor (star assembly) is
also required. This area depends on the local conditions and therefore Nordex has to be
consulted before any action is taken. Space for at least 2 Nordex erection containers must be
provided (for power generator and tools).
Further space must be provided for one Nordex material container for temporary material
storage, garbage containers, staff containers, construction vehicles, etc.
The access roads to the wind turbine must always be kept free for ambulance and rescue
vehicles.
Example 1: Crane hardstanding area for WT up to 80 m hub height with just-in-time delivery
Example 1a: Crane hardstanding area for WTs up to 80 m hub height with storage areas for delivery
Example 2: Crane hardstanding area for WT up to 100 m hub height with just-in-time delivery
Example 2a: Crane hardstanding area for WTs up to 100 m hub height with storage areas for delivery
Example 3: Crane hardstanding area for N117 R120 with just-in-time delivery
Example 3a: Crane hardstanding area for N117 R120 with storage area
Example 4: Crane hardstanding area for WTs with concrete hybrid tower (PH141) with optional storage
area for delivery
Calculations N117
The foundation shape has been determined based on the soil properties, loads and ground water level. Both the
internal forces and external forces have been calculated using Finite Element Method software DIANA, which has
been developed by TNO. Several calculation sheets have been made by Royal HaskoningDHV in order to facilitate
the highly automated design process. The leading input and output sheets of the calculations that lead to a
proximate rebar configuration have been added to this memo. A calculation of the foundations rotational stiffness
shows that it could be critical to reach the value which has been stated in the load document. In the design 28 piles
are required based on bearing capacity. It could however be required to add more piles to full fill the rotational
stiffness criteria or use a higher concrete class for the piles.
7 6 5 4 3 2 1
8 9 10
For all lubricants safety datasheets are available according to Directive 91/155/EEC.
• Pitch gearboxes
The pitch gearboxes are located in the rotor hub and turn along with the rotor. A
sealing system effectively prevents the gear oil from escaping. In case of
accidental leakage, the oil remains within the rotor hub and will not escape from
the access hatch due to the shape and inclination of the hub.
• Yaw bearing
The races and gearings of the yaw bearing are lubricated with grease. The
sealing system prevents the grease from escaping. If there is too much grease
in the bearings it escapes inside the hub and remains there.
In case of accidental leakage, the grease remains within the rotor hub and will
not escape from the access hatch due to the shape and inclination of the hub.
• Rotor bearing
Grease regularly emerges from the labyrinth seals of the rotor bearing during
operation and runs directly into two grease drip trays (capacity approx. 10 or
25 l). These are cleaned regularly during maintenance.
• Gearbox
The gearbox has non-abrasive, wear-free sealing systems at both, input and
output shaft. In case of accidental leakage, the oil is collected by the nacelle
housing or by the oil-proof upper tower platform.
• Generator bearing
The generator bearings are lubricated with grease and are equipped with a
highly effective sealing system. This effectively prevents lubricant from
escaping. If the sealing system fails the grease remains within the nacelle and is
correctly disposed of during maintenance.
• Hydraulic unit
The hydraulic unit is equipped with a highly effective sealing system which
prevents oil from escaping. If the sealing system is damaged, the oil remains
within the nacelle.
• Yaw gearboxes
The yaw gearboxes are equipped with a sealing system which prevents oil from
escaping. If the sealing system is damaged, the oil remains within the nacelle.
• Yaw bearing
The races of the yaw bearing are lubricated with grease. The sealing system
prevents the grease from escaping. If there is too much grease in the bearing it
escapes to the external gearing.
The external gearing is lubricated with a non-drip adhesive grease.
Underneath the external gearing any escaping grease is collected in the nacelle
housing where it can be removed.
• Nacelle housing
The nacelle housing will collect any escaping fluids which the provided grease
drip trays are not able to collect. The bottom sections of the nacelle housing are
tray-shaped. All pipes are laid above these trays.
• Tower
The top tower platform is designed as an oil-proof drip tray. The drip tray has a
capacity of at least 630 liters.
• Coolant
The cooling system of the generator and the converter work fully independently
from each other. The pressure of the cooling systems is constantly monitored
during operation. A pressure drop is immediately reported via the operation
control.
The coolant is a mixture of an antifreeze liquid and water.
Maintenance
The above-mentioned systems, which contain lubricants or coolants, are checked
for leaks during the periodic maintenance works. Any leaks are eliminated. All drip
trays are inspected at regular intervals during maintenance and emptied if
necessary.
Waste disposal
All lubricants and coolants must be disposed of by certified specialist waste
management companies from the region upon presentation of proof and in
accordance with local laws and guidelines.
7500 4150
A Outer Dimensions: A
hight: 2,150 m
width: 4,150 m
length: 7,500 m
2150
C C
D D
2000
100
4200
2626
Gross weight: approx. 61,5 mtons
Net weight: approx. 60 mTons
B B
C C
3910
180
250
220
1586
1200
800
D D
5047 3632 2xM48 at each side
every data in mm
383
of the main frame
13075 REpower 3.X M
B 13254 02.09.2008 aktuelles WEA design / actual WEC design J. Lütjen T. Sebon A. Trede
E Ver./
rev.
Änd.
Nr.
Datum/
date Änderung / modification bearbeitet/
processed
geprüft/
checked
Freigabe/
released E
The two transport frames are each equipped with 4 Weitergabe sowie Vervielfältigung
dieses Dokuments, Verwertung und
DIN ISO
13715
DIN ISO 2768-
mHH
Maßstab / Scale:
1:100
Werkstoff / Material:
.
Gewicht / Weight:
.
Lashing points. In front of the main frame, screwed Mitteilung seines Inhalts sind
verboten, soweit nicht ausdrücklich - + Tolerance
DIN ISO 8015
Benennung / Title
Lash point breaking load is about 200 kN, that vorbehalten. - Entwicklungszentrum -
Hollesenstraße 15 WEA REpower
geprüft / checked: 03.03.2008 Schwerdtfeger D-24768 Rendsburg WEC REpower
equals 100 kN lashing force.
The reproduction, distribution and Phone: +49 - 4331 - 131390
F utilization of this document as well Fax. No: +49 - 4331 - 13139999 Zeichnungsnummer / Drawing Number Version / Revision
F
as the communication of its
contents to others without explicid
authorization is prohibited.
freigegeben/released: 03.03.2008
Stückzahl pro
A. Trede
Angegebene Spezifikation ist
Schutzvermerk DIN ISO 16016
D-3.1-GP.MA.02-B C
Offenders will be held liable for Anlage/ No. of . zwingend zu beachten! Workflow Status Blatt/Sheet
1/2
Pieces per Turbine: Protection Mark DIN ISO 16016 DIN-Blatt/DIN-Sheet
the payment of damages. All rights Indicated Specification has to A3
reserved in the event of the grant SAP-No.: . Pos.-Nr.: . be strictly observed! (Ers.f. / repl.for:) . (Ers.d. / repl.by:) .
of a patent, utility model or design. Plot: 05.10.2009
EDP NO. P:\Products\03_01_REpower_3XM\GesamtProjekt\Mass_Abmessg_Transp_Schwerpkt\Doku_Zeichnung\D-3.1-GP.MA.02-B
1 2 3 4 5 6 7 8
Dokument-Nr./ Document-No.:
V-1.1-FG.OO.OO-A-J
Verfasser / Author
REpower Systems AG
Albert-Betz-Str. 1
0-24783 Osterronfeld
Tel.: +49-4331-13139-0
Fax: +49-4331-13139-999
Erstellt:
Prepared by:
~~
Released by:
Datum / Date:
2011-05-27 General Specification for the Design of
Seiten / Pages: Onshore Foundations
28
Ausfertigung /Issue:
D Original I Original
D Reg. Exemplar Nr I Reg. Copy No.:_
D Kopie (nicht erfasst) I Copy (not registered)
Status:
DEntwurf I Draft
Schutzvermerk ISO 16016: Weitergabe sowie Vervielfaltigung dieses Doku-
DEntwurf zur externen PrUfung I Draft for
ments, Verwertung und Mitteilung seines Inhalts sind verboten, soweit nicht
external check
ausdrUcklich gestattet. Zuwiderhandlungen verpflichten zu Schadenersatz. Alle
D freigegebene Fassung I released Version Rechte fUr den Fall der Patent-, Gebrauchsmuster- oder Geschmacksmusterein-
tragung vorbehalten.
Klassifikation / Classification:
D streng vertraulich I strictly confidential
D intern I internal
[gI kundenvertraulich I Customer confidential Protection mark ISO 16016: The reproduction, distribution and utilization of this
D offentlich I public document as well as the communication of its contents to others without explicit
authorization is prohibited. Offenders will be held liable for the payment of dam-
Anderungsdienst / QM document control: ages. All rights reserved in the event of the grant of a patent, utility model or
design.
D ja I yes
D nein I no
D begrenzt bis I limited until:
General Specification for the Design of Onshore Foundations
Ausgabe- Aus-
Revision Änderungen / Modifications
datum / tausch-
Date of seiten /
issue Replaced
pages
A 2006-03-20 - Erstausgabe / First Issue
B 2006-03-23 all
C 2007-08-28 all
D 2008-01-21 all
E 2008-07-14 all
F 2008-10-14 all
G 2009-12-18 all
p.24, p.26- General requirements for 3.XM @ 96.50 to 100 m hh;
H 2010-06-07
27 External Tower Stair Section added
Section 4.4 added; Section 5.1 to 5.3 modified; Section 5.7;
I 2011-01-11 --
modified; Section 7.1 modified
Section 5 modified; Minimum values for the REpower MM100
J 2011-05-27 --
added; Section 4.4.1: detailed definition “compacted”
Anlagen / Annex:
Table of Content
1 Introduction..................................................................................................................................4
4 Foundation Types........................................................................................................................8
4.1 Gravity Foundations ......................................................................................................................8
4.1.1 General Requirements ..................................................................................................................8
4.1.2 Foundation Gapping ......................................................................................................................9
4.1.3 Soil Bearing Pressure for Circular Bases ....................................................................................10
4.1.4 Soil Bearing Pressure for Square Bases .....................................................................................11
4.1.5 Lean Concrete Underneath the Foundation Slab ........................................................................13
4.2 Pile Foundations..........................................................................................................................14
4.3 Pier Foundations .........................................................................................................................14
4.4 Anchor Bolt Foundation ...............................................................................................................15
4.4.1 3.XM @ 96.50m – 100 m Hub Height..........................................................................................17
5 REpower Requirements ............................................................................................................18
5.1 Minimum Requirements for Foundation Design ..........................................................................18
5.1.1 REpower MM82...........................................................................................................................19
5.1.2 REpower MM92...........................................................................................................................19
5.1.3 REpower MM100.........................................................................................................................19
5.1.4 REpower 3.4M104.......................................................................................................................20
5.2 Minimum Shear Reinforcement ...................................................................................................20
5.3 Anchor Reinforcement.................................................................................................................23
5.4 Design of the Pedestal ................................................................................................................24
5.5 Arrangement of Top and Bottom Layer Reinforcement...............................................................24
5.6 Design of Top and Bottom Layer Reinforcement ........................................................................25
6 Foundation Stiffness.................................................................................................................26
1 Introduction
The design of foundations for REpower wind turbines has to be carried out based on the REpower load
specification. National requirements and standards have also be taken into account. The design of the
embedded steel can is carried out by REpower.
EUROCODES shall be applied preferably if recognised in that particular country.
2 Design Review
REpower is entitled to do a design-review. However REpower does not accept responsibility as a result
of the design review. If the foundation design does not meet REpower’s requirements the design has to
be revised. These are the standard documents to be submitted for the design-review:
− Reinforcement Drawings
− Bar Schedule
− Work Instructions
− Design-Report
Technical documentation should be in German and/or English. Other languages can be exceptionally
accepted . This information shall be found on the drawings:
− Turbine (e. g. MM82 or 3.XM), hub height, name of the project / site
− Geological studies
− Geophysical surveys
− Geotechnical investigations
A geological study should be based on information about the geological history of the area where the
wind turbine is to be installed. The purpose of the study is to establish a basis for selection of methods
and extent of the site investigation.
A geophysical survey can be used to extend the localised information from single borings and in-situ
testing in order to get an understanding of the soil stratification within a given area. Such a survey can
provide guidelines for selection of a suitable foundation site within the area, if not already decided.
Geophysical surveys are carried out by means of seismic methods.
A geotechnical investigation consists of:
− cyclic tests for determination of strength and stiffness parameters (triaxial tests, direct simple shear
tests and resonant column tests)
Sampling can be carried out with and without drilling. The cone penetration test (CPT) and various vane
tests form the most commonly used in-situ testing methods. Results from such in-situ tests can be used
to interpret parameters such as the undrained shear strength of clay. The extent to which the various
types of in-situ tests and laboratory tests are required depends much on the foundation type in
question, for example, whether it is a piled foundation or a gravity-based foundation. This geotechnical
report should contain sufficient information about the site and its soils, e.g. in terms of soil strength and
deformation properties, to allow for design of the foundation with respect to:
− bearing capacity
− stability against sliding
− settlements
− foundation stiffness
− need for and possibility of drainage
4 Foundation Types
− Overall stability assessments taking into account the ground water level
− Reinforced concrete design
For US projects only: Due to patent reasons the version 1 general arrangement of the above figure
is not allowed to be used in connection with an embedded steel can the USA.
For unscaled ultimate loads (γF = 1.0) not more than 50% of the base may be without compression. No
safety factors have to be applied. It has to be proven that the resultant of all forces (tower moment,
turbine, foundation slab, pedestal, ballast) is within a circle
e < 0.59 * R for circular bases
e<a/3 for square bases
− Ultimate bearing pressure at the edge of the foundation for characteristic loads
⏐Fz ⏐ = resultant of all vertical forces ( turbine, tower, foundation, ballast etc.)
e = M / ⏐Fz ⏐ excentricity
K = coefficient according to the graph below
σmax = K * ⏐Fz ⏐ / (π* R2) soil pressure at the edge
5.0
4.5
4.0
3.5
3.0
K
2.5
2.0
1.5
1.0
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
e/r
− Ultimate averaged bearing pressure for characteristic loads as shown in the sketch
σm = ⏐Fz ⏐ / Aeff
− Ultimate bearing pressure at the edge of the foundation for the characteristic loads
⏐Fz ⏐ = resultant of all vertical forces ( turbine, tower, foundation, ballast etc.)
e = M / ⏐Fz ⏐ excentricity
K = coefficient according to the graph below
σmax = K * ⏐Fz ⏐ / a² soil pressure at the edge of the foundation
6 .0 0
5 .0 0
4 .0 0
3 .0 0
K
2 .0 0
1 .0 0
0 .0 0
0.00
0.02
0.04
0.06
0.08
0.10
0.12
0.14
0.16
0.18
0.20
0.22
0.24
0.26
0.28
0.30
0.32
0.34
0.36
e /a
p a ra lle l 45°
− Ultimate averaged bearing pressure for characteristic loads as shown in the sketch (90° direction):
Aeff = a2 - 2 * a * e area with constant pressure
σm = ⏐Fz ⏐ / Aeff
− Ultimate averaged bearing pressure for the characteristic loads as shown in the sketch (45° direc-
tion):
Aeff = (a – e* 20.50)2 area with constant pressure
σm = ⏐Fz ⏐ / Aeff
For US projects only: Due to patent reasons no reinforced sub bases or lean concrete layers are
allowed to be used on site in the USA. The embedded steel can has to be placed on a non-reinforced
sub base layer. It is required to use a minimum of 100mm lean concrete to support the levelling legs
of the embedded steel can.
− Verification of the rotational and lateral stiffness at a reference height indication as specified by
REpower. If the centre of rotation is at a lower height indication than specified by REpower, the
complete system (nacelle, tower and foundation) has to be taken into consideration.
− Overall stability
− Structural design of the foundation body
− Fatigue analysis for the reinforcement and/or anchor bars as well as for the concrete
For pier foundations (caisson, Patrick & Henderson, and similar) excavating using explosives is
prohibited. Where necessary, a hydraulic excavator or other applicable devices shall be used instead.
Especially for P&H-Foundations the excavation method may not degrade the texture of the in-situ
soil/rock. The engineer of record has to propose a suitable method for excavation works.
Option A: The embedment ring is placed below the bottom reinforcement. In that case no anchor
reinforcement around the holding down bolts is needed.
Option B: The embedment ring is placed above the bottom reinforcement. In that case anchor
reinforcement around the holding down bolts is required. The anchor reinforcement has to be in
accordance with the stated design approach in section 5.3 on page 23. A sufficient anchor length on
the tension site of the anchor reinforcement has to be assured.
The number of bolts, the mean diameter of the inner & outer bolt ring as well as the proposed bolt
diameter can be found on the tubular steel tower drawing.
− A suitable long term corrosion protection of the bolts has to be assured. The bolts have to be pro-
tected against corrosion for the proposed design life of 20yrs.
− Concrete is sensible to creeping and shrinkage effects. The foundation engineer generally speci-
fies the pre-tension force of the bolts. The pre-tension force shall be checked periodically after ini-
tial pre-tension of the bolts. The foundation engineer has to clearly state after what time frame the
pre-tension force has to be adjusted.
− It has to be assured that water, grout or concrete does not come into contact with the holding
down bolts. Typically a high temperature (HT) tube is used to prevent contact between concrete,
grout and water. A heat shrinkage tube seals the HT tube at both ends. See figure below:
2 3
5 REpower Requirements
To assure a proper foundation design REpower specifies the following minimum requirements. These
requirements are structural requirements as well as geometrical and requirements regarding the
proposed concrete class. Nevertheless for the foundation design local codes and standards have to be
considered.
− Hub Height [m]: Range or single value for the hub height.
− Concrete Volume [m3]: Minimum values for concrete volume. The column differentiates between
gravity foundations without buoyancy and pile foundations with buoyancy effects. For squared foun-
dations values have to be increased by 10%.
− Reinforcements Steel [t]: Minimum values for reinforcement steel. The column differentiates be-
tween gravity foundations without buoyancy and pile foundations with buoyancy effects. For
squared foundations values have to be increased by 10%.
− Slab Thickness h [mm]: That column states the minimum thickness of the foundation slab itself.
The given values are valid for foundations with an embedded steel can as well as if an anchor cage
is supposed to be used for the tower – foundation connection. The blinding layer may not be taken
into account.
− Concrete Class: In that column the minimum concrete class around the embedded flange is
stated. The concrete class is based on Eurocode 2 nomenclature. If the Eurocode 2 is not applica-
ble in an particular country, the chosen concrete compressive strength fck shall be equivalent.
(*) Anchor cage design: C50/60 below the tower base flange; C30/37 around the embedded ring flange
at the bottom of the anchor cage.
d↓ 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400 2600 2800 3000
[cm²/m²
[cm] [cm²/m²
[cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²]
] ]
100 0.00 3.41 5.11 6.81 8.52 11.26 15.52 19.78 24.04 28.30 32.56 36.82 41.08 45.34 49.60
110 0.00 3.10 4.65 6.20 7.74 9.29 12.81 16.68 20.56 24.43 28.30 32.17 36.05 39.92 43.79
120 0.00 2.84 4.26 5.68 7.10 8.52 10.55 14.10 17.65 21.20 24.75 28.30 31.85 35.40 38.95
130 0.00 2.62 3.93 5.24 6.55 7.86 9.17 11.92 15.20 18.47 21.75 25.02 28.30 31.58 34.85
140 0.00 2.43 3.65 4.87 6.08 7.30 8.52 10.05 13.09 16.13 19.17 22.22 25.26 28.30 31.34
150 0.00 2.27 3.41 4.54 5.68 6.81 7.95 9.09 11.26 14.10 16.94 19.78 22.62 25.46 28.30
160 0.00 2.13 3.19 4.26 5.32 6.39 7.45 8.52 9.67 12.33 14.99 17.65 20.31 22.98 25.64
170 0.00 2.00 3.01 4.01 5.01 6.01 7.02 8.02 9.02 10.76 13.27 15.77 18.28 20.78 23.29
180 0.00 1.89 2.84 3.79 4.73 5.68 6.63 7.57 8.52 9.47 11.74 14.10 16.47 18.84 21.20
190 0.00 1.79 2.69 3.59 4.48 5.38 6.28 7.17 8.07 8.97 10.37 12.61 14.85 17.09 19.33
200 0.00 1.70 2.56 3.41 4.26 5.11 5.96 6.81 7.67 8.52 9.37 11.26 13.39 15.52 17.65
210 0.00 1.62 2.43 3.25 4.06 4.87 5.68 6.49 7.30 8.11 8.92 10.05 12.08 14.10 16.13
220 0.00 0.00 2.32 3.10 3.87 4.65 5.42 6.20 6.97 7.74 8.52 9.29 10.88 12.81 14.75
230 0.00 0.00 2.22 2.96 3.70 4.44 5.19 5.93 6.67 7.41 8.15 8.89 9.78 11.63 13.49
240 0.00 0.00 2.13 2.84 3.55 4.26 4.97 5.68 6.39 7.10 7.81 8.52 9.23 10.55 12.33
250 0.00 0.00 2.04 2.73 3.41 4.09 4.77 5.45 6.13 6.81 7.50 8.18 8.86 9.56 11.26
d↓ 320 3400 3600 3800 4000 4200 4400 4600 4800 5000 5200 5400 5600 5800 6000
0
[cm] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²]
100 53.86 58.12 62.38 66.63 70.89 75.15 79.41 83.67 87.93 92.19 96.45 100.71 104.97 109.23 113.49
110 47.66 51.53 55.41 59.28 63.15 67.02 70.89 74.77 78.64 82.51 86.38 90.25 94.13 98.00 101.87
120 42.50 46.05 49.60 53.15 56.70 60.25 63.79 67.34 70.89 74.44 77.99 81.54 85.09 88.64 92.19
130 38.13 41.41 44.68 47.96 51.24 54.51 57.79 61.06 64.34 67.62 70.89 74.17 77.45 80.72 84.00
140 34.39 37.43 40.47 43.51 46.55 49.60 52.64 55.68 58.72 61.77 64.81 67.85 70.89 73.94 76.98
150 31.14 33.98 36.82 39.66 42.50 45.34 48.18 51.02 53.86 56.70 59.54 62.38 65.21 68.05 70.89
160 28.30 30.96 33.63 36.29 38.95 41.61 44.27 46.94 49.60 52.26 54.92 57.58 60.25 62.91 65.57
170 25.80 28.30 30.81 33.31 35.82 38.32 40.83 43.33 45.84 48.34 50.85 53.36 55.86 58.37 60.87
180 23.57 25.93 28.30 30.67 33.03 35.40 37.77 40.13 42.50 44.86 47.23 49.60 51.96 54.33 56.70
190 21.58 23.82 26.06 28.30 30.54 32.78 35.03 37.27 39.51 41.75 43.99 46.23 48.48 50.72 52.96
200 19.78 21.91 24.04 26.17 28.30 30.43 32.56 34.69 36.82 38.95 41.08 43.21 45.34 47.47 49.60
210 18.16 20.19 22.22 24.24 26.27 28.30 30.33 32.36 34.39 36.41 38.44 40.47 42.50 44.53 46.55
220 16.68 18.62 20.56 22.49 24.43 26.36 28.30 30.24 32.17 34.11 36.05 37.98 39.92 41.85 43.79
230 15.34 17.19 19.04 20.89 22.75 24.60 26.45 28.30 30.15 32.00 33.86 35.71 37.56 39.41 41.26
240 14.10 15.88 17.65 19.43 21.20 22.98 24.75 26.53 28.30 30.08 31.85 33.63 35.40 37.17 38.95
250 12.97 14.67 16.38 18.08 19.78 21.49 23.19 24.89 26.60 28.30 30.00 31.71 33.41 35.12 36.82
d↓ 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400 2600 2800 3000
[cm²/m²
[cm] [cm²/m²
[cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²]
] ]
100 0.00 3.41 5.11 6.81 8.52 10.51 14.77 19.03 23.29 27.55 31.81 36.07 40.33 44.58 48.84
110 0.00 3.10 4.65 6.20 7.74 9.29 12.06 15.93 19.80 23.68 27.55 31.42 35.29 39.16 43.04
120 0.00 2.84 4.26 5.68 7.10 8.52 9.94 13.35 16.90 20.45 24.00 27.55 31.10 34.65 38.20
130 0.00 2.62 3.93 5.24 6.55 7.86 9.17 11.17 14.44 17.72 20.99 24.27 27.55 30.82 34.10
140 0.00 0.00 3.65 4.87 6.08 7.30 8.52 9.74 12.34 15.38 18.42 21.46 24.51 27.55 30.59
150 0.00 0.00 3.41 4.54 5.68 6.81 7.95 9.09 10.51 13.35 16.19 19.03 21.87 24.71 27.55
160 0.00 0.00 3.19 4.26 5.32 6.39 7.45 8.52 9.58 11.58 14.24 16.90 19.56 22.22 24.89
170 0.00 0.00 3.01 4.01 5.01 6.01 7.02 8.02 9.02 10.02 12.51 15.02 17.53 20.03 22.54
180 0.00 0.00 2.84 3.79 4.73 5.68 6.63 7.57 8.52 9.47 10.98 13.35 15.72 18.08 20.45
190 0.00 0.00 2.69 3.59 4.48 5.38 6.28 7.17 8.07 8.97 9.86 11.86 14.10 16.34 18.58
200 0.00 0.00 2.56 3.41 4.26 5.11 5.96 6.81 7.67 8.52 9.37 10.51 12.64 14.77 16.90
210 0.00 0.00 2.43 3.25 4.06 4.87 5.68 6.49 7.30 8.11 8.92 9.74 11.32 13.35 15.38
220 0.00 0.00 2.32 3.10 3.87 4.65 5.42 6.20 6.97 7.74 8.52 9.29 10.12 12.06 14.00
230 0.00 0.00 2.22 2.96 3.70 4.44 5.19 5.93 6.67 7.41 8.15 8.89 9.63 10.88 12.73
240 0.00 0.00 2.13 2.84 3.55 4.26 4.97 5.68 6.39 7.10 7.81 8.52 9.23 9.94 11.58
250 0.00 0.00 2.04 2.73 3.41 4.09 4.77 5.45 6.13 6.81 7.50 8.18 8.86 9.54 10.51
d ↓ 3200 3400 3600 3800 4000 4200 4400 4600 4800 5000 5200 5400 5600 5800 6000
[cm] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²] [cm²/m²]
100 53.10 57.36 61.62 65.88 70.14 74.40 78.66 82.92 87.18 91.44 95.70 99.95 104.21 108.47 112.73
110 46.91 50.78 54.65 58.52 62.40 66.27 70.14 74.01 77.88 81.76 85.63 89.50 93.37 97.24 101.12
120 41.75 45.29 48.84 52.39 55.94 59.49 63.04 66.59 70.14 73.69 77.24 80.79 84.34 87.89 91.44
130 37.38 40.65 43.93 47.21 50.48 53.76 57.03 60.31 63.59 66.86 70.14 73.42 76.69 79.97 83.25
140 33.63 36.67 39.72 42.76 45.80 48.84 51.89 54.93 57.97 61.01 64.06 67.10 70.14 73.18 76.22
150 30.39 33.23 36.07 38.91 41.75 44.58 47.42 50.26 53.10 55.94 58.78 61.62 64.46 67.30 70.14
160 27.55 30.21 32.87 35.53 38.20 40.86 43.52 46.18 48.84 51.51 54.17 56.83 59.49 62.15 64.82
170 25.04 27.55 30.05 32.56 35.06 37.57 40.07 42.58 45.09 47.59 50.10 52.60 55.11 57.61 60.12
180 22.81 25.18 27.55 29.91 32.28 34.65 37.01 39.38 41.75 44.11 46.48 48.84 51.21 53.58 55.94
190 20.82 23.06 25.31 27.55 29.79 32.03 34.27 36.51 38.76 41.00 43.24 45.48 47.72 49.96 52.21
200 19.03 21.16 23.29 25.42 27.55 29.68 31.81 33.94 36.07 38.20 40.33 42.45 44.58 46.71 48.84
210 17.41 19.43 21.46 23.49 25.52 27.55 29.58 31.60 33.63 35.66 37.69 39.72 41.75 43.77 45.80
220 15.93 17.87 19.80 21.74 23.68 25.61 27.55 29.48 31.42 33.36 35.29 37.23 39.16 41.10 43.04
230 14.58 16.44 18.29 20.14 21.99 23.84 25.70 27.55 29.40 31.25 33.10 34.95 36.81 38.66 40.51
240 13.35 15.12 16.90 18.67 20.45 22.22 24.00 25.77 27.55 29.32 31.10 32.87 34.65 36.42 38.20
250 12.21 13.92 15.62 17.33 19.03 20.73 22.44 24.14 25.84 27.55 29.25 30.95 32.66 34.36 36.07
Where overlap joints can’t be avoided the overlap length shall be not less than 45 times the diameter
of the reinforcement bars.
Welded or manually connected rebars do have
a significantly reduced fatigue strength.
Therefore no manual connection of rebars are
permitted.
6 Foundation Stiffness
REpower specifies minimum dynamic foundation stiffness (kϕ,dyn and kxy,dyn) in order to ensure that the
overall system natural frequency stays above the main excitation loads. This requirement enables
REpower to demonstrate that fatigue life will be acceptable since the foundation stiffness has been
assumed in the turbine fatigue simulations. Furthermore REpower specifies statical foundation stiffness
(kϕ,stat) to ensure stability and to limit moments from second order theory.
Mϕ F Mϕ
kϕ
, dyn
k
x , y , dyn
kϕ
, stat
= = =
, dyn
θ x , y , dyn
Δx, y , stat
θ
For circular gravity bases dynamic foundation stiffness is calculated using a rigid footing on elastic half-
space formulation:
For squared gravity bases dynamic foundation stiffness is calculated using a rigid footing on elastic
half-space formulation:
In the estimation of foundation stiffness at the design stage, sufficient allowance should be made for
ground variability across the site. Regardless of this requirement, the rotational stiffness of the
foundation shall be proven by the designer using adequate equations.
7 External Stair
Each turbine can be entered by an external tower stair. As a rigid support a proper stair base support
has to be provided. The rigid stair base support shall be set up on site. The needed dimensions of the
support area are depicted in this section. The support area has to be made of a concrete slab,
flagstones or any other suitable support material. The stair base can be levelled within ±50mm up and
downwards.
Distance Lx [mm]
The height hbase depends on the hub height of the turbine. The following listing states the height of the
stair base depending on the configuration and hub height of a specific turbine in relation to the top of
the embedment can.
hbase for ETS [mm] hbase for ITS [mm]
MM-Series, Hub height = 59m 710 720
MM-Series, Hub height > 59m 610 660
D-3.1-GP.00.01-A-EN (D)
Author
REpower Systems SE
Albert-Betz-Str. 1
D-24783 Osterrönfeld
Phone: +49-4331-13139-0
Fax: +49-4331-13139-999
Date:
2013-02-22
Pages:
8
Document type:
Original
Reg. copy no.:___
Copy (unregistered)
Status:
Draft
Draft for external review
Approved version
Classification:
Strictly confidential
Internal
Customer confidential Protective note ISO 16016: The reproduction, distribution and utilization of this
Public document, as well as the communication of its contents to others without explicit
authorization, is prohibited. Offenders will be held liable for the payment of damages.
All rights reserved in the event of the granting of a patent, utility model, or registered
Updating service: design.
Yes
No
Limited until: _________
Change history:
Issue date
Replaced
Version
pages
Changes
Related documents:
Name Document no.
Please ask the REpower Systems SE Document Management department for the most current
versions of the respective related documents. The German description will apply in case of doubt.
3.XM
Table of contents:
1 List of lubricants ........................................................................................................ 4
2 Design measures to prevent lubricant from escaping ........................................... 6
2.1 Blade pitch gearbox......................................................................................... 6
2.2 Blade adjustment bearing................................................................................ 6
2.3 Rotor bearing................................................................................................... 6
2.4 Gearbox........................................................................................................... 6
2.5 Generator bearing ........................................................................................... 7
2.6 Hydraulic system ............................................................................................. 7
2.7 Yaw gearbox.................................................................................................... 7
2.8 Yaw bearing..................................................................................................... 7
3 Maintenance and oil change ..................................................................................... 7
3.1 Maintenance .................................................................................................... 7
3.2 Oil change ....................................................................................................... 8
3.3 Disposal........................................................................................................... 8
1 List of lubricants
5 1 4, 12 10, 12
6, 7 2 8, 9
8 Rotor blade – bearing Lubrication grease Fuchs Lubritech Gleitmo 585K ≈3x10 kg 2 -
+15 kg
10 Blade pitch gearbox Synthetic oil Mobil SHC XMP 150 or 3×7.5 l 1 -
Mobil SHC Gear 150
3×7.5 l 2 -
11 Blade pitch gearb. Lubrication grease Fuchs Lubritech Stabyl EOS E2 <1 kg 1 -
seal
* - WHC = water hazard class (- = not applicable because insoluble solid substance)
** - HSC = hazardous substances class (- = not applicable)
Safety data sheets in accordance with directive 91/155/EEC are available for all lubricants
The following design measures can prevent leakage as a cause for escaping lubricant:
The blade pitch gearboxes are arranged along the cast element of the rotor hub and rotate with the
rotor. A double sealing system effectively prevents the discharge of the gear oil. If there is leakage,
the oil remains inside the rotor hub, the spinner or the rotor blades. The corresponding sump
capacity is adequate for the relatively low oil quantity.
The tracks of the bearings are lubricated with lubrication grease. The sealing system effectively
prevents the discharge of the lubrication grease Used lubrication grease expelled from the tracks
will be collected in lubrication grease collection bottles that are mounted on the inner bearing ring.
The grease collection bottles are emptied during maintenance. If the bottles are too full and
lubrication grease is discharged, the sealing system ensures the lubrication grease remains inside
the rotor hub enclosure. If the external sealing system of the blade bearing fails, the discharged
lubrication grease will be collected by the rotor blade rain deflector. The rain deflector and the
deflector on the rotor hub enclosure form an effective labyrinth, both against penetrating rainwater
and against discharged lubrication greases from the pitch bearing. The blade bearing gearing is
lubricated with an adherent lubrication grease. This adherent lubrication grease is highly viscous
and non-drip. Clumpy flaking of the adhesive lubricant from the gearing is not possible. In addition,
the blade bearing gearing is covered to prevent access. Any leakage will remain inside this cover.
During operation, lubrication grease escapes from the labyrinth seals of the rotor bearing. This
lubrication grease will be collected directly below the bearing, in a lubrication grease pan
integrated in the main frame. Aluminum sheet inserts provide the necessary sealing of the
integrated grease pan. The grease pan is regularly emptied during maintenance and the
discharged lubrication grease is disposed of properly.
2.4 Gearbox
The gearbox features non-abrasive, i.e. wear-free, sealing systems on the drive shaft and output
shaft. If leakages occur on the gearbox, the discharged will be immediately collected in an oil pan
that is integrated in the nacelle. In addition, the top platform of the tower is designed to function as
an oil pan. To this end, the platform is welded oil-tight with an 80 mm high, circular edge. The
threaded joint holes are sealed. This effectively prevents the oil from continuing to enter the tower
interior.
The lubricated generator bearings are equipped with a non-contact sealing system based on the
labyrinth principle. This sealing system effectively prevents uncontrolled discharge of the lubricant.
Used, excess lubrication grease will be collected in the designated containers. The collection
containers will be emptied during maintenance.
The hydraulic unit is located in the nacelle. An oil pan is positioned directly below the unit for any
lingering leaks or discharged hydraulic oil.
The oil-filled gearboxes for the yaw system feature a complex sealing system on the input and
output shafts. The drives are located within the nacelle enclosure. If oil escapes as the result of
damage, this oil will be collected by a circular coaming mounted on the nacelle enclosure.
The tracks of the bearing are lubricated with lubrication grease. The selected sealing system
ensures that excess lubrication grease is discharged outward toward the gearing. The yaw bearing
gearing is lubricated with an adherent lubrication grease. This lubrication grease is highly viscous
and non-drip. Clumpy flaking of the lubrication grease from the gearing is not possible. To collect
lubrication grease discharged from the yaw bearing sealing system, a continuous coaming ring is
mounted below the yaw bearing gearing. These lubrication grease collection channels will be
regularly emptied during maintenanc.
3.1 Maintenance
The lubrication grease collection pans are checked at regular intervals during maintenance and
emptied as required (see "Disposal" section). Required quantities of lubrications grease and
hydraulic oil are lifted into the nacelle using a chain hoist.
Lubricants are not stocked on site at the wind turbine. Oil is not refilled. During the scheduled
maintenance an oil sample is taken from the gearbox and inspected in a laboratory. An oil change
is only carried out if necessary depending on the result of the oil sample inspection. The oil change
is carried out by a service company. For draining and refilling the oil, a hose is attached between
the tanker and the gearbox.
3.3 Disposal
Lubricant is disposed of by approved, specialist firms in the region using a tracking form
procedure.
Hub height
Preliminary
Meter
Total height* 171,5
Hub height 115
Rotor diameter 113
* Incl. 200 mm elevated foundation and grouting
The tower bottom flange diameter will be between
4.5m and 4.8m depending on the final tower
design.
Restricted
Sheet Size: ISO Scale: Page Nr.:
SWT-3.2-113 115 HH A3 1:750 1 /1
This document mus t not be c opied or made av ailable to any
Siemens Wind Power A/S
third party without our written permiss ion. Borupvej 16 DK-7330 Brande
The c ontents must be us ed only as agreed with us.
Breac h of the above will caus e legal ac tion. Tel. +45 9942 2222
Siemens Wind Power A/S
Generic flat foundation design, SWT-3.0-113, 115m NH, IEC2B
Dokument-ID: E R WP EN-40-0000-7046-02
André Frank / 2013.01.23
Restricted
Basic data
size note value unit
Concrete (C30/35, C45/55) Ca. 614 [m³]
Steel (BST500S) Ca. 67940 [kg]
Density, surcharge: Min. 18,0 [kN / m³]
Groundwater Under foundation base
Foundation shape round
Outer diameter 19,5 [m]
Plate down- grade (1 : 5,2) 10,9 [°]
Sketch
flat foundation
2,00
1,00
-2,00
-3,10
9,75; -3,10
-3,00
10,25; -3,30
-4,00
Soil requirements
size comment value unit
Edge pressure App. 275 [kN / m²]
Mean pressure App. 197 [kN / m²]
Base friction angle (against gliding) App. 15 [°]
Es,dyn app. 120 [MN / m²]
Misalligment after 20 years 0,25 [°]
Reference is made to: DIBt 2004 Richtlinie für Windkraftanlagen
Source for foundation loads: SWT-30-113, 115.0m Tubular, Foundation loads for preliminary use only rev00 - 20130121.pdf
Bill of quantities
2 – Earthwork
App. 30cm, exposing, casting at site and later on leveling
2.1 Top soil
according foundation
173 [ m² ]
2.2a Excavation (as before) Displacing within the area, no dump fees 1478 [ m³ ]
3 - Foundation
3.1 Subbase App. 10cm, C20/25, building into, incl. film as underlayer. 330 [ m² ]
3.5 Reinforcement steel BST 500S / D=10 - 28 mm, supplying, cutting, bending and laying. 67940 [ kg ]
3.9 Gravel path App.. 2,00m width, from crane floor space to tower door 1 pcs
3.9 Finishing work Finishing soil surface after tower erection. 1 pcs
4 - Others
Siemens has designed the wind turbines SWT-3.2-113 in such a way as to avoid any environmental impact
due to a leakage of a fluid in the turbine. This document describes the provisions made in the design of
these wind turbines to inhibit any leakage of a substance hazardous to water and to prevent any negative
impact on the environment if a leakage were to occur.
Hydraulic system
The hydraulic system is used for the pitch control of the rotor blades and brake. Its components are placed
both in the nacelle and the hub; the main pump unit with the hydraulic oil reservoir is installed in the nacelle.
The volume of the reservoir in the main system is 130 liter. The tank has a low-level indicator with a
threshold of 80 liters, so that the turbine is stopped when 50 liter (130-80) oil is missing. If there is damage in
the reservoir up to 130 l can be leaked from the pump system in the nacelle; if there is damage on any of the
remaining parts of the system, up to 50 liters (130-80) can be leaked.
In case of a leak in the hydraulic system in the nacelle, the hydraulic oil is collected in the lower part of
the canopy. The capacity of the collection system in the canopy is more than 300 liter; this volume fully
covers the needs for collection of all liquids in the nacelle.
The hydraulic system in the hub contains at 90 liter (max. capacity of the pitch accumulators). The oil is
mainly contained in the three pitch accumulators and pitch cylinders. The capacity is evenly divided
between the three independent pitch systems (one per blade, each containing 30 liter). Due to the fact
that the pitch system is designed with three independent systems, the maximum oil amount that can be
leaked at a single incident is 80 liters (130-80+30), which represents the total volumetric oil content in
one of the pitch systems and the oil supplied from the main pump system before the low level sensor
stops the turbine.
Oil collecting in the hub is utilized by the use of oil absorbing material with a minimum capacity of 80
liters and this volume fully covers the needs for collection of all liquids in the hub.
Yaw system
Each wind turbine has eight yaw gears (ten as an option). Each of the eight yaw gears contains 8.6 l of
gear oil. In case of an oil leak in the yaw gear, the oil is collected in the lower part of the canopy. The
capacity of the collection system in the canopy is more than 300 liter; this volume fully covers the needs
for collection of all liquids in the nacelle.
Transformer (optional)
Wind turbines equipped with a power transformer inside the tower hold an aluminum tank that is mounted
below the rack supporting the transformer. The tank is able to contain all potentially leaking oil from the
transformer, being more than 1000 liter. The top edges of the tank are furnished with a collar that seals
tightly to the bottom side of the rack.
Time (Days)
MIDEL 7131 has been proven to be non-
toxic and readily biodegradable, and as Results Comparative independent studies
such is an environmentally friendly examining the biodegradation of mineral
alternative to mineral oil and silicone Figure 1 demonstrates that MIDEL 7131 oil and silicone liquid show a stark
liquid. MIDEL 7131’s classification as achieved 10% degradation by day 3 and contrast to the environmentally friendly
non-water hazardous by UBA further 10 days later it was 71% degraded. On MIDEL 7131.
supports this assertion. the 28th day MIDEL 7131 reached 89%
degradation, putting it comfortably in the In Figure 2, the graph clearly
Biodegradation Readily Biodegradable OECD and the demonstrates that neither of MIDEL
Fully Biodegradable IEC 61039 7131’s counterparts managed to achieve
Biodegradation is the process by which categories. even a 10% level of degradation at the
organic substances degrade and become end of the 28 day test period. Therefore
harmlessly absorbed by the environment. MIDEL 7131 will not biodegrade in a MIDEL 7131’s excellent biodegradable
The biodegradation of MIDEL 7131 has transformer. This is due to the fact that properties make it the sensible solution
been assessed by an accredited the conditions within the transformer are for use in a transformer.
laboratory using a standard test method too hot and dry to sustain microbial life.
developed by the Organization for
Economic Cooperation and Development Figure 2 - Biodegradation of Mineral Oil and Silicone Liquid
(OECD), a worldwide standard-setting
100
body. OECD 301 D Closed Bottle Test
90
Method 80
70
Tests for biodegradation use micro-
% Biodegradation
Mineral Oil
organisms, of the type present in 60
Silicone Liquid
wastewater treatment plants. These 50
organisms are put into glass jars with the
40
test compound for 28 days.
Measurements are taken of the oxygen 30
UBA Water Hazard Classification Table 1 - Common Test Parameters and Guidance Limits
3.4
3.6
6°
Item no. Mass (kg) Certificate Format Status Revised by Created date Created by
A3 2013-06-28 VAGAA
Material / Specification Scale Change no. PDM ver. Reviewed date Reviewed by
1:1000
Proj. Item description
Table_Version=1
V112 HH 119
F Pro/E
Replaces Drawing no. Ver. Sheet
Metric
vestas.com
Dimensions shown in mm
unless otherwise specified
1 of 1
WARNING: PROPRIETARY AND CONFIDENTIAL INFORMATION.
This document and the Information set forth herein are confidential and proprietary to Vestas Wind Systems A/S. It contains trade secrets, and independent economic value, actual
or potential, may be derived from the document/Information not being generally known. In consideration of you receiving this document you agree (I) to keep the Information secret
(II) only to use the Information for the purpose specifically agreed with Vestas (III) not to disclose directly or indirectly any part of the Information to any third party and
(IV) not to make copies or reproductions thereof by whatsoever means or undertake any qualitative or quantitative analysis, reverse engineering or replication.
VESTAS PROPRIETARY NOTICE: This document contains valuable confidential information of Vestas Wind Systems A/S. It is protected by copyright law as an unpublished work. Vestas reserves all patent, copyright,
trade secret, and other proprietary rights to it. The information in this document may not be used, reproduced, or disclosed except if and to the extent rights are expressly granted by Vestas in writing and subject to applicable
conditions. Vestas disclaims all warranties except as expressly granted by written agreement and is not responsible for unauthorized uses, for which it may pursue legal remedies against responsible parties.
8311
6732
4091
2220
1764
5778 1739 3185 7998
17498
4533
3850 2135
5235
VESTAS PROPRIETARY NOTICE: This document contains valuable confidential information of Vestas Wind Systems A/S. It is protected by copyright law as an unpublished work. Vestas reserves all patent, copyright,
trade secret, and other proprietary rights to it. The information in this document may not be used, reproduced, or disclosed except if and to the extent rights are expressly granted by Vestas in writing and subject to applicable
conditions. Vestas disclaims all warranties except as expressly granted by written agreement and is not responsible for unauthorized uses, for which it may pursue legal remedies against responsible parties.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Groundlevel:
0.000 0.325 -0.38 -1.73 Groundwater level: -2.783 10.4.2 Information for design approver:
10.4.3 9.4 Loads: 0037-8985.V01, calculation: 0041-0087.V00
10.4.1 Soil condition to be fulfilled:
10.4.4 Assumed characteristic soil parameters: friction angle 28° or undrained shear strength 55 KN/m².
Min. density of soil 18 / 8 KN/m³, density of back filling 16.2 / 6.2 KN/m³ to 20.7 / 10.7 KN/m³.
8.1.1
1050
2400
1.6 8.1.2 10.3.3 Drainage must be performed according to local condition and soil composition.
A 10.3.2 Rotational stiffness: min. 28 GNm/rad equal to a Es,stat= 11000 KN/m², Es,dyn=32000 KN/m² (v=0.35) for
sand or Es,stat=6000 KN/m², Es,dyn=41000 KN/m² (v=0.40) for clay.
Max. plastic design soil pressure: 218 KN/m², constant over substitute area, with a
10.3.1
PSF of 1.35 on wind, 0.9 on tower weight and backfilling, 1.0 on foundation weight
-2.783 -3.110 Cross section: Max. elastic soil pressure 247 KN/m² with PSF equal to 1.0 for all loads.
C-C 11.1
Foundation side view: Specifications:
Cable trench 10.1 All works carried out acc. to EN 1992-1-1/AC:2010 Design of Concrete Structures, EN 1997-1/AC:2009"
40 Geotechnical Design, general rules, EN 1997-2/AC:2010 Geotechnical Design, investigation and testing.
40
General description: 0005-8491.V04. Design life time: 20 years.
19500
Anchor cage, approval drawing 0041-0093.V00:
The anchor cage incl. adjustment feet is provided by Vestas as loose parts or assembled.
The anchor cage shall be set upon the blinding layer and adjusted to the correct position vertically and
Blinding layer 2.6 horizontally by using the adjustment feet at the lower flange. During casting, which must be
done simultaneously inside and outside the cage, great care must be taken to ensure that
Main Axis the cage does not displace and that the lower flange is in full contact with compacted
13.2 concrete, below and above flange. Max. vertical deviation after concreting +/- 4 mm.
See site specific -3.270 Weight of anchor cage, app. 16300 kg total.
Anchors shall be post tensioned according to approval drawing 0041-0093.V00
Possible cable layout 1.2
Concrete:
B door position
1.3 2.4 Concrete works acc. to EN 13670:2009 "Execution of concrete structures".
2.2 The concrete must be composed, mixed and prepared according to EN 206-1 in the strength
Detail of radial reinforcement 1.1 Detail of pedestal reinforcement class: C30/37 for plate, C45/55 for pedestal. Exposure class: XC4 / XD1 / XS1 / XF3 / XA1
Maximum aggregate size in the area of the bottom and top reinforcement: 16mm (in other areas max. 32mm)
5813 at the bottom flange 1.4 Pos. 9.1 is bound to pos. 2.4 9.1 2.3 Blinding layer min. 100 mm.
12.1 Low-creeping and low-shrink concrete for exterior buildings units, low heat of hydration
2.1 Min. required density of concrete due to stability: 2198 kg/m3.
High pressure water jet Covering: Cnom = 60 mm against form work or blinding layer, Cnom = 110 mm against soil (no formwork).
2323
3275
906
2834
0
2948
5.9 ø25 ring Ø3641, 2 x 2 = 4 pcs. L=6707 mm, ring no. 9.
Topview: Piping detail at the pedestal 5.i ø25 ring Ø923 + 302 * i, i = 1-9, ring no. i. Total number of rings: 18. See Cut & Bending list.
All cable outlets must be aligned with the Main Axis Concentric bars inside anchors, top part, 1 layer above pos 2:
within the outlet area 6.1 ø25 ring Ø1225, 1 x 1 = 1 pcs. L=5260 mm, ring no. 1.
Reinforcement bottom: Reinforcement top: Cross section: 6.9 ø25 ring Ø3641, 1 x 3 = 3 pcs. L=5225 mm, ring no. 9.
Pos. 1.1to 1.5, 3 and 5. Pos. 2.1 to 2.5, 4 and 6. B-B 6.i ø25 ring Ø923 + 302 * i, i = 1-9, ring no. i. Total number of rings: 9. See Cut & Bending list.
1:75 9583 1:75 Pos. 7 and 8. Vertical bars at edge
9453 1:75 7.1 336 pcs ø25 x 1495 mm, vertical bars at outer edge.
7.2 5 rings ø16 x Ø19364, 5 x 6 = 30 pcs L=10699 mm, horizontal rings at outer edge (at pos. 7.1).
Shear locks and hair pins - see Cut and Bending list for correct lengths
E 8.1 42 pcs ø25 x 2894 mm, shear locks inside anchor cage (zone 1) - C-shaped.
8.2 240 pcs ø25 x approx. 4560 mm (mean value), shear locks in punching zone (zone 2).
7843 7903 8.3 300 pcs ø16 x approx. 2841 mm (mean value), shear locks in shear zone (zone 3).
8.4 240 pcs ø25 x approx. 2515 mm (mean value), hair pins for all zone 2.
8.5 300 pcs ø16 x approx. 1600 mm (mean value), hair pins for zone 3.
K=
K=
28
28
88
88
Before tower installation: After tower installation: Bonding- and overlap lengths, bending diameters:
T-Flange Sealant Size Anchor Overlap Bending Ø Remark
Number and height of C-shaped bars, shear locks and hair pins
Template flange C-shape Ø32 1012 1416 n.a. Bottom radial bar (pos 1)
(see also Cut and Bending list) Ø28 1195 1673 680 Top radial bar (pos 2)
0.325 Concrete level Ø25 746 1045 175 Bottom concentric ring outside anchors (pos 3)
Zone 1 C-shape 25 Zone 2 25 Zone 3 16 Ø25 1028 1439 175 Top concentric ring outside anchors (pos 4)
10
8.1.1and 8.1.2 Item no. Mass (kg) Certificate Format Status Revised by Created date Created by
135 Ring 4 - - 34 4 1878 4 1213 84 4 925 4 656 Material Scale Change no. PDM ver. Reviewed date Reviewed by
High pressure water jet Ring 10 - - 0 - - - - 0 - - - - This document and the Information set forth herein are confidential
proprietary
and to Vestas Wind Systems A/S. It contains trade secrets,
or potential, may be derived from the document/Information not being generally
independent
and
known. In consideration of you receiving this document you agree (I) the
economic value, actual
to keep
Information secret
VESTAS PROPRIETARY NOTICE: This document contains valuable confidential information of Vestas Wind Systems A/S. It is protected by copyright law as an unpublished work. Vestas reserves all patent, copyright,
trade secret, and other proprietary rights to it. The information in this document may not be used, reproduced, or disclosed except if and to the extent rights are expressly granted by Vestas in writing and subject to applicable
conditions. Vestas disclaims all warranties except as expressly granted by written agreement and is not responsible for unauthorized uses, for which it may pursue legal remedies against responsible parties.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Information for design approver:
Groundlevel:
0.000 0.325 -0.38 -1.83 Groundwater level: 0.000 10.4.3 10.4.2 9.4 Loads: 0037-8985.V01, calculation: 0041-0088.V00
10.4.4 10.4.1
Soil condition to be fulfilled:
8.1.1
Assumed characteristic soil parameters: friction angle 26° or undrained shear strength 50 KN/m².
Min. density of soil 18 / 8 KN/m³, density of back filling 16.2 / 6.2 KN/m³ to 20.7 / 10.7 KN/m³.
1.6 8.1.2 Weight of backfilling is included in stability and shall not be removed.
950
10.2
3210
2400
10.3.4 Max ground water level: 0 m under terrain
A 9.3 No drainage required.
Rotational stiffness: min. 28 GNm/rad equal to a Es,stat= 6000 KN/m², Es,dyn=19000 KN/m² (v=0.35) for
10.3.3
Cross section: sand or Es,stat=3000 KN/m², Es,dyn=24000 KN/m² (v=0.40) for clay.
10.3.2 Max. plastic design soil pressure: 149 KN/m², constant over substitute area, with a
-2.783 -3.110 C-C
PSF of 1.35 on wind, 0.9 on tower weight and backfilling, 1.0 on foundation weight
Cable trench 10.3.1 Max. elastic soil pressure 152 KN/m² with PSF equal to 1.0 for all loads.
Foundation side view: 40
40 11.1 Specifications:
10.1 All works carried out acc. to EN 1992-1-1/AC:2010 Design of Concrete Structures, EN 1997-1/AC:2009"
23200 Geotechnical Design, general rules, EN 1997-2/AC:2010 Geotechnical Design, investigation and testing.
General description: 0005-8491.V04. Design life time: 20 years.
Anchor cage, approval drawing 0041-0093.V00:
Blinding layer The anchor cage incl. adjustment feet is provided by Vestas as loose parts or assembled.
The anchor cage shall be set upon the blinding layer and adjusted to the correct position vertically and
Main Axis 2.6 horizontally by using the adjustment feet at the lower flange. During casting, which must be
13.2 done simultaneously inside and outside the cage, great care must be taken to ensure that
See site specific -3.270 the cage does not displace and that the lower flange is in full contact with compacted
cable layout 1.2 concrete, below and above flange. Max. vertical deviation after concreting +/- 4 mm.
Weight of anchor cage, app. 16300 kg total.
Possible Anchors shall be post tensioned according to approval drawing 0041-0093.V00
door position 1.3
Concrete:
B 1.1 2.4 Concrete works acc. to EN 13670:2009 "Execution of concrete structures".
The concrete must be composed, mixed and prepared according to EN 206-1 in the strength
5813 Detail of radial reinforcement 1.4 Detail of pedestal reinforcement 9.1 2.2 class: C30/37 for plate, C45/55 for pedestal. Exposure class: XC4 / XD1 / XS1 / XF3 / XA1
at the bottom flange 12.1 Pos. 9.1 is bound to pos. 2.4 Maximum aggregate size in the area of the bottom and top reinforcement: 16mm (in other areas max. 32mm)
2.3 Blinding layer min. 100 mm.
Low-creeping and low-shrink concrete for exterior buildings units, low heat of hydration
High pressure water jet
2.1 Min. required density of concrete due to stability: 2208 kg/m3.
cleaning before grouting Covering: Cnom = 60 mm against form work or blinding layer, Cnom = 110 mm against soil (no formwork).
C Concrete quality control according to EN 206-1.
Reinforcement:
Cold joint with rough surface Steel bars S500 ductility class B or C according to EN 10080 with min Fyk = 500 N/mm².
Y-Axis A A
13.1 10.2 A 662 662 Grout:
C C45/55 10.2 10.1 582 Non-shrink grout, min. compression strength C90/105
0.5% 0.5% Min. compression strength at time of post tension 55 N/mm² and after 1 day: 10 N/mm².
502 Post tension force: 605 KN equal to 54% of Fuk for the Gr 10.9 anchors and an elongation of 7.1 to 8.2 mm.
10.1 422 Cable conduits (PVC tubes) - NOT a Vestas delivery:
342 342 See general discription in "Switchgear installation vs foundation tubes" 0017-5653.
11.1 230 230 See site specific cable layout for actual number and size of conduits.
Possible 1000 Earthing:
C door position 4.1 C30/37 117 117
For the See "Vestas Earthing System", esp. description 0019-2575 "Earthing on anchor cage foundation"
cables 0 0 incl. copper conductors, bolts, nuts and washers delivered with the anchor cage.
6.1 Reinforcement Cut and Bending List: 0041-0090.V00
2323
3275
906
2834
0
2948 5.1
5.9
ø25 ring Ø1225, 2 x 1 = 2 pcs. L=4837 mm, ring no. 1.
ø25 ring Ø3641, 2 x 2 = 4 pcs. L=6707 mm, ring no. 9.
Topview: Piping detail at the pedestal 5.i ø25 ring Ø923 + 302 * i, i = 1-9, ring no. i. Total number of rings: 18. See Cut & Bending list.
All cable outlets must be aligned with the Main Axis
Concentric bars inside anchors, top part, 1 layer above pos 2:
within the outlet area 6.1 ø25 ring Ø1225, 1 x 1 = 1 pcs. L=5260 mm, ring no. 1.
6.9 ø25 ring Ø3641, 1 x 3 = 3 pcs. L=5225 mm, ring no. 9.
6.i ø25 ring Ø923 + 302 * i, i = 1-9, ring no. i. Total number of rings: 9. See Cut & Bending list.
Reinforcement bottom: Reinforcement top: Cross section:
Pos. 1.1to 1.5, 3 and 5. Pos. 2.1 to 2.5, 4 and 6. B-B Vertical bars at edge
7.1 336 pcs ø25 x 1395 mm, vertical bars at outer edge.
11423 1:100 11443 1:100 Pos. 7 and 8. 7.2 5 rings ø16 x Ø23064, 5 x 7 = 35 pcs L=10912 mm, horizontal rings at outer edge (at pos. 7.1).
1:100
E Shear
8.1
locks and hair pins - see Cut and Bending list for correct lengths
42 pcs ø25 x 2894 mm, shear locks inside anchor cage (zone 1) - C-shaped.
8.2 224 pcs ø25 x approx. 4657 mm (mean value), shear locks in punching zone (zone 2).
8.3 565 pcs ø16 x approx. 2859 mm (mean value), shear locks in shear zone (zone 3).
8.4 224 pcs ø25 x approx. 2473 mm (mean value), hair pins for all zone 2.
9263 9283 8.5 565 pcs ø16 x approx. 1597 mm (mean value), hair pins for zone 3.
K=
K=
Before tower installation: After tower installation: Bonding- and overlap lengths, bending diameters:
T-Flange Sealant Size Anchor Overlap Bending Ø Remark
Number and height of C-shaped bars, shear locks and hair pins
Template flange C-shape Ø32 994 1391 n.a. Bottom radial bar (pos 1)
(see also Cut and Bending list) Ø28 1185 1658 680 Top radial bar (pos 2)
0.325 Concrete level Ø25 746 1045 175 Bottom concentric ring outside anchors (pos 3)
Zone 1 C-shape 25 Zone 2 25 Zone 3 16 Ø25 1028 1439 175 Top concentric ring outside anchors (pos 4)
10
0.325 Ø25 706 988 175 Bottom concentric ring inside anchors (pos 5)
25x45 C-shape Shear locks Hairpins Shear locks Hairpins Ø25 1008 1412 175 Top concentric ring inside anchors (pos 6)
8.4 to 8.5.i Number Pos. Height Number i Height i Height Number i Height i Height Ø16 572 801 64 Concentric ring in pedestal (pos 10)
Pos. 8.2.i Pos. 8.4.i Pos. 8.3.i Pos. 8.5.i Ø16 400 560 64 Rings at foundation edge (pos 7.2)
Blinding layer 46 m3, concrete 697 m3, grout 2.22 m3, reinforcement 68 t, reinforcement ratio 97 kg/m3
Ring 1 21 8.1.1 2305 17 1 2220 1 1213 65 1 1436 1 656
Ring 2 21 8.1.2 2305 22 2 2169 2 1213 70 2 1332 2 656
380
8.1.1and 8.1.2 Item no. Mass (kg) Certificate Format Status Revised by Created date Created by
135 Ring 4 - - 32 4 1925 4 1213 81 4 1124 4 656 Material Scale Change no. PDM ver. Reviewed date Reviewed by
High pressure water jet Shear lock and hairpin WARNING: PROPRIETARY AND CONFIDENTIAL INFORMATION.
Ring 10 - - 0 - - - - 0 - - - - This document and the Information set forth herein are confidential
proprietary
and to Vestas Wind Systems A/S. It contains trade secrets,
or potential, may be derived from the document/Information not being generally
independent
and
known. In consideration of you receiving this document you agree (I) the
economic value, actual
to keep
Information secret
Adjustment feet cleaning before grouting (II) only to use the Information for the purpose specifically agreed
Vestas
(IV) not to make copies or reproductions thereof by whatsoever means
with
(III) not to disclose directly or indirectly any part of the Information
undertake
or
to any third party and
any qualitative or quantitative analysis, reverse engineering
replication.
or
VESTAS PROPRIETARY NOTICE: This document contains valuable confidential information of Vestas Wind Systems A/S. It is protected by copyright law as an unpublished work. Vestas reserves all patent, copyright,
trade secret, and other proprietary rights to it. The information in this document may not be used, reproduced, or disclosed except if and to the extent rights are expressly granted by Vestas in writing and subject to applicable
conditions. Vestas disclaims all warranties except as expressly granted by written agreement and is not responsible for unauthorized uses, for which it may pursue legal remedies against responsible parties.
Document no.: 0012-6933 V08 Date: 2014-04-29
Document owner: Platform Management Restricted
Lubrication and Coolant Chart
Type: T09 - Manual Page 1 of 11
Table of contents
1 Introduction ............................................................................................................................. 2
2 Reference Documents ............................................................................................................ 2
3 Lubrication .............................................................................................................................. 2
3.1 Checking the Grease Levels at Commissioning ........................................................................ 2
3.2 Lubrication at Scheduled Service .............................................................................................. 3
3.2.1 Easy Grease Automatic Grease Unit......................................................................................... 3
4 Checking the Oil and Coolant Levels .................................................................................... 4
4.1 Oil Levels, Gearbox .................................................................................................................. 4
4.2 Oil Levels, Hydraulic Power Unit ............................................................................................... 5
4.3 Oil Levels, Yaw Gears .............................................................................................................. 5
4.4 Coolant Levels .......................................................................................................................... 6
5 Changing the Filters ............................................................................................................... 6
5.1 Hydraulic System ...................................................................................................................... 6
5.2 Gear Oil System ....................................................................................................................... 6
5.3 Cooling System......................................................................................................................... 7
5.4 O-Rings for Filter Housings ....................................................................................................... 7
6 Oil Sampling ............................................................................................................................ 7
6.1 Hydraulic System ...................................................................................................................... 7
6.2 Gear Oil System ....................................................................................................................... 8
7 Oil Change ............................................................................................................................... 8
7.1 Hydraulic System ...................................................................................................................... 8
7.2 Gear Oil System ....................................................................................................................... 9
7.3 Yaw Gears .............................................................................................................................. 10
8 Coolant Change .................................................................................................................... 11
VESTAS PROPRIETARY NOTICE: This document contains valuable confidential information of Vestas Wind Systems A/S. It is protected by copyright law as an unpublished work. Vestas reserves all patent, copyright, trade secret, and
other proprietary rights to it. The information in this document may not be used, reproduced, or disclosed except if and to the extent rights are expressly granted by Vestas in writing and subject to applicable conditions. Vestas
disclaims all warranties except as expressly granted by written agreement and is not responsible for unauthorized uses, for which it may pursue legal remedies against responsible parties.
Document no.: 0012-6933 V08 Date: 2014-04-29
Document owner: Platform Management Lubrication and Coolant Chart Restricted
Type: T09 - Manual Introduction Page 2 of 11
1 Introduction
This document lists quantities and item numbers for oil, grease, and oil filters
used for the turbines.
Furthermore, replacement and sampling intervals are listed.
See the ‘Technical Description and Data Manual’ for further description of
location of lubrication points and filters.
2 Reference Documents
3 Lubrication
(2)
Applies to Mk 0E and onwards, including Mk 1 and 2 (Nacelles with two
grease lubrication pumps for the yaw lubrication system).
(3)
Applies to Mk 0E and onwards, including Mk 1 and 2 (Nacelles with two
grease lubrication pumps for the yaw lubrication system).
(1)
Applies to Mk 0 with only one grease lubrication pump.
(2)
Applies to Mk 0E and onwards, including Mk 1 and Mk 2 (Nacelles with two
grease lubrication pumps for the yaw lubrication system).
(3)
Applies to Mk 0E and onwards, including Mk 1 and Mk 2 (Nacelles with two
grease lubrication pumps for the yaw lubrication system).
NOTE Shell Gadus S5 T460 1.5 was formerly called Shell Stamina HDS2.
Winergy Oil Sight Controller Oil Sight Controller Test menu 11.94. 1 year
PZAB 3530 temp. glass reading temp. glass reading Stop turbine for at and at
and 3530.1 [°C]. reading [mm]. [°C]. reading [mm]. least 15 minutes commis-
Gearbox [mm]. [mm]. prior to measuring. sioning
Onshore 30 129 1061 30 139 1071 Measurement on
Ratio: 113.2 sight glass is taken
40 139 1071 40 149 1081 from centre of bolt
on lower part of
50 149 1081 50 159 1091
sight glass to oil
surface.
Table 4-1: Checking the oil levels, gearbox
In case topping up is required, see section 7 Oil Change, p. 8 for oil type.
IMPORTANT Always top up after filter replacement or service on the gear oil system, as the
amount of gear oil drained prior to service must be refilled. For example, between
5 and 20 litres may be required after a filter replacement.
6 Oil Sampling
7 Oil Change
NOTE The oil filters and air breather filters must be replaced at oil change.
When replacing Texaco Rando WM32 with Mobil DTE10-Excel 32, completely
remove Texaco Rando WM32 from the system to maximise the life of the Mobil
DTE10-Excel 32.
Mobil DTE10 -Excel 32 cannot be used for topping up a system filled with Texaco
Rando WM32.
At oil change, a label for Texaco Rando WM 32 or Mobil DTE10-Excel32 must be
applied to the hydraulic power unit.
(1)
Topping up must be done with the oil type already on the gear oil system,
(check gear oil labels on gearbox and gravitation tank). Turbines produced
up until October 2013 have got a first fill of Mobilgear SHC XMP 320, while
later turbines have got a first fill of Castrol Optigear Synthetic CT 320.
NOTE The oil filters and air breather filters must be replaced at oil change.
At oil change, a label for Mobilgear SHC XMP 320 or Castrol Optigear Synthetic
CT 320 must be applied to the gearbox.
8 Coolant Change
Change coolant every five years or earlier if the refractometer test indicates a
need for replacement.
Do not use other types of coolant than the one listed above.
When changing coolant, also clean the filter in the pipeline to the generator.