FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING

UNIVERSITI TUN HUSSEIN ONN MALAYSIA

BFP 40103 -CONSTRUCTION PROJECT PLANNING AND SCHEDULING-


GROUP PROJECT INSTRUCTION

Number of students : Section 1 (30) & Section 2 (29)


Number of Group : 9 groups (5-6 students for each group. Each group must have a mix of gender)

Learning Outcome.
1. To develop a planning and scheduling plan for the construction project by using Microsoft Project software.
2. To display an ability to lead and productively participate in a group for producing a scheduling plan for a construction
project.

Problem Background.
Construction project management consists of few activities including planning, scheduling, monitoring and controlling.
Before the project started, a contractor shall prepare a planning and scheduling program schedule so that the scope of
work and project objectives can be achieved within a time frame given. The execution master plan schedule of is using
project charter, work method statement, contract document, drawings and so on.

Instruction.
Based on the documents or information obtain, prepare a scheduling plan for the project. Your report shall include the
following items:
1. Team member information
2. Project background: Project information, cost, contract duration, location, project detail, etc
3. Work breakdown structure (Outline View)
4. Master plan schedule using Microsoft Project
5. Table of duration calculation (including quantity, numbers of workers, productivity rate, etc)

Your project is limited to the construction of building with minimum cost RM 500,000 and with at least 100 activities.
You may use any assumption to complete the task and any assumption must be written in your report.

Submission date is on 29th November 2018 before 12 pm.

Prepared by:
Siti Khalijah Yaman
24th September 2018