SEMESTER 1-2022/2023
GROUP PROJECT (20%)
This project is designed to provide students with practical experience in applying project
management fundamental and concepts including scheduling concepts using MS Project.
Project Information
a) Prepare a report in .pdf file that consist of info below (Cognitive 5%)
i. Project Information (introduction, scope of project, project title, project start
and end date, working calendar, cost, location, etc.).
ii. Details of Project Proposal (including but not limited to Work Breakdown
Structure (WBS) in a tabular view, working time information, table on duration
estimation, Gantt Chart, and comparison of physical and financial S-Curve).
iii. Drawing/Bill of quantities (BQ) for proposed project.
The project selected is only for double-storey building construction works and shall meet below
requirements:
i. Minimum list of activities required to complete the project is 80 activities and
up to maximum 100 activities with at least four (4) level of WBS.
ii. The maximum cost of project is RM 800,000.
iii. The minimum project duration is eight (8) months.
To submit a comprehensive project proposal, any logic assumption is needed and it should be
clearly written in your project report.