ANT stabilised Base item

Labour component (per CUM)


Unit Quantity Rate Rs
Highly Skilled day
Skilled day
Semi Skilled day
Un skilled day
Any other required manpower
Machinery component (per cum)
Wet mix plant @ 75 tonne capacity per hour hr
Electric generator 125 KVA hr
Water tanker 6 KL capacity 5 km lead with one trip
per hour hr
Front end loader 1 cum bucket capacity hr
Tipper 10 tonne hr
Motor Grader 110 HP hr
Tandem roller 8-10 t hr
Any other required machinery
Material Component(per cum)
ANT cum

Granular Sub base with cement item

Labour component (per CUM)


Unit Quantity Rate Rs
Higly Skilled day
Skilled day
Semi Skilled day
Unskilled day
Any other required manpower
Machinery component (per cum)
Wet mix plant @ 75 tonne capacity per hour hr
Electric generator 125 KVA hr
Water tanker 6 KL capacity 5 km lead with one trip
per hour hr
Front end loader 1 cum bucket capacity hr
Tipper 10 tonne hr
Motor Grader 110 HP hr
Tandem roller 8-10 t hr
Any other required machinery