SPECIFIC SUPERVISION PROCEDURE

INSPECTOR'S CHECK SHEET ON SITE

Name of Materials : Material Baja WF

Acceptance Warehouse/Stock Pile Acceptance Warehouse/Stock Pile


No. Remark No. Remark
Date Inspector Date Inspector Date Inspector Date Inspector

Approved by: ARE …………...Date…………..


SPECIFIC SUPERVISION PROCEDURE

INSPECTION SHEET DURING ACCEPTANCE Date : ………..

Name of Materials : Material Baja WF

Item Check Acc. Y/N Date Inspector

1 Persetujuan material

2 Tidak berkarat

3 Batang lurus, bebas bengkokan

4 Bersih bebas kotoran , lumpur, oli

5 Diukur Dimensinya

6 Diukur panjangnya

7 Hasil test/Millsheet

8 Pabrik disetujui Direksi


SPECIFIC SUPERVISION PROCEDURE

INSPECTION SHEET AT WAREHOUSE/STOCK PILE Date : ………..

Name of Materials : Material Baja WF

Item Check Acc. Y/N Date Inspector

1 Diberi alas beton / kayu

2 Ditutup terpal bila diluar gudang