DUCTING CHECKLIST

SL YES NO REMARKS
NO. DESCREPTION

Whether the material received is of


1.
approved make.

Whether the Factory test certificate is


2.
received with the material.

Whether the material received is as per


3.
specification.

4. Whether the drawing is approved.

Whether the duct fabrication done as


5.
per specification.

Whether the duct erection done as per


6.
specification.

Whether the duct supports were


7.
provided as per specification.

Whether the duct joints were properly


8.
sealed.

Whether the testing is done as per


9.
specification

Whether the commissioning is done as


10.
per specification

HLL CONTRACTOR

NAME NAME

PLACE PLACE

DATE DATE

SIGINATURE SIGINATURE

DESIGINATION DESIGINATION