PILING INSPECTION CHECKLIST

Project Name Date

Plot No.

Location
Specialized
Consultant
Contractor

SECTION S/N ELEMENTS TO BE CHECKED CONSULTANT CONTRACTOR


NOT NOT
GENERAL OK N/A OK N/A
OK OK
1. Piles layout/grid lines
2. Safety
3. Access
4. Cleaning
5. Dewatering system
DOCUMENTS
Crane layout, structural drawings approved by the consultant
6.
at site(based on crane availability)
7. Shoring completion certificate (based on shoring availability)
8. Copy of valid piling building permit
Approved drawing by creative clusters authority at site(soft
9.
copy)
10. Steel tests

PILES
11. Cover
12. Reinforcement
13. Starter bars
14. Coordinates
15. Levels
16. Piles diameters/length

REVIEWER’S COMMENT(S)

SPECIALIZED CONTRACTOR CONSULTANT

NAME STAMP NAME STAMP

DESIGNATION DESIGNATION

SIGNATURE SIGNATURE

DATE DATE

PO Box 478844, Dubai, UAE


T +971 800-4-DDA (332)
F +971 4 427 2449
ZA-DC-F-100 Issue 3, Rev 1, Dated 24/12/2018 dda.gov.ae