DATE: FLOOR / LEVEL: GRID: Vendor Consultant PMC Sl# Description NA Y N Sign Y N Sign Y N Sign
1. Is the AREA to be excavated clean and cleared
of all obstructions? 2. Is the LAYOUT, ALIGNMENT AND SIZE of Excavation marked on the ground as per excavation plan? 3. Are adequate WORKING SPACES provided all round? 4. Check whether FOUNDING STRATA is suitable for laying PCC i.e., free from any soft pockets. (if NO, remove soft pockets and fill with Lean Concrete/Sand) 5. Check for DRESSING of the excavated area. Is it OK? 6. Check for STABILITY of Side Slopes. Is it acceptable? 7. Check for DEWATERING of waterlogged area. Is it OK? 8. Check for DISPOSAL of excavated earth to specified area. 9. Check whether BARRICADING & CAUTION SIGNS are provided for deep excavations. 10. Are JOINT INSPECTION RECORDS complete ORIGINAL GROUND LEVEL: FOUNDING LEVEL: DEPTH OF EXCAVATION: