Consulting Engineers Pvt. Ltd., QUALITY CHECKLIST FOR SITE WORKS 3rd Floor, Mldhav Square, Station Roac Malmaddi, Dhawad - 580 007
CL -- 02 : EARTH WORK / BACKFILLING
Name of the Client: HUBLI DHARWAD SMART CITY LIMITED Date:
Project Name: Construction of Integrated Sport's Stadium Complex Location:
at Hubli. Under Hubli Dharwad smart City. Name of the Contractor: M/S KMV PROJECTS LIMITED
Drawing Ref. No.: Date: Quantity:
Reference Rev. No:
S.No Description YES NO NA Remarks
1 Is format CL: 01 for Surveying complied with?
2 Whether suitable arrangements for re-routing the service
lines done? 3 Is the LAYOUT, ALIGNMENT and SIZE of Excavation marked on the ground as per drawings? 4 Is adequate shoring, strutting done?
5 Check for DEWATERING. Is it O.K.?
6 Check for DEWATERING. Is it O.K.?
A. NATURAL EXISTING GROUND LEVEL :
B. FOUNDING LEVEL
C. DEPTH OF EXCEVATION
BACKFILLING
1 Is the earth used for filling as per specification?
2 Check for the approved method of compaction, ie. (Roller,
Plate compactor, etc. ,) 3 Whether Proctor compaction test carried out satisfactorily as per the requirement? CORRECTIVE ACTION PROPOSED- Item wise. If 'No' is marked, please specify reasons and thereafter corrective action proposed. (Add additional sheets, if necessary) Comments:-