attachment D Manufacturer's Drawings !ZI Method Statement
□ Manufacturer's Literature U Product Certificate
□ Sample/ Brochure D Performance/Technical Data
D Design Calculation □
name designation
submitted by Si�
APPROVAL RESPOND
recommendation by consulting engineers/architect approval by superintending officer
comments comments
signature signature
name name
Ntf1:if! >lltvA I� 11'1 ll I �
date date
·'fc/:J.o:)J
METHOD STATEMENT
FOR
SEWERAGE WORK
Reference ARSB-AVE3-WMS-0013
No. Revision 00
Date Issued 12/06/2023
Table of Contents
1.0 Scope of 3
1.1 General Description 3
1.2 References ......... . 3
1.3 Materials 3
1.4 Plant and Equipment................................................................................ 3
1.5 Manpower.................................................. . 4
1.6 Construction Procedure 5
1.6.1 Pilot work {beyond the boundary) 5
1.6.2 Vitrified clay pipe (VCP) installation................................................................................ 5
1.6.2.1 Before excavation 5
1.6.2.1 During excavation 6
1.6.2.1 After excavation (Beyond the Boundary) ...................................................................... 10
1.6.3 Manhole Installation ..................................................................................................... 10
1.6.4 Handling of excavated / cut material............................................................................ 11
1.6.5 Site clearing/ cleaning .................................................................................................. 11
1.6.6 Inspection and handling over to IWK ............................................................................ 11
2.0 SAFETY AND HEALTH 13
2.1 Job Safety & Health Analysis 13
2.2 Information to personal 13
2.3 Emergency Arrangements..... 13
2.4 Air Quality and Noise level 13
2.5 Waste Management ........ 14
2.6 Housekeeping 14
3.0 Appendices ............................. :............................................ . 15
3.1 Construction Sequence 15
3.2 Job Safety Analysis {JSA) 15
Page I 2
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013
�
.,,-...,,au Ro.:..."•·•
Revision No. 00 Revision Date 12/06/2023
1.2 References
The relevant references are as follows:
No. Description Document Ref no.
Doc No: JKR 20800-0226-20 (01}
Technical Specification
SECTION F: SEWERAGE
2 References Drawing Approved Drawing
3 HSE ARSB-AVE3-PSHP-0001
1.3 Materials
All relevant material shall be submitted and approved through the Material
submission approval.
Ir
Page I 3
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013
�
,\.,.,,.111 Ro.,..i.11■,a·:
Revision No. 00 Revision Date 12/06/2023
A team will comprise of machineries and plants as listed above together with
skilled workers. Except for the machineries and equipment listed above, any
other required machineries and equipment will be also be prepared and used
if necessary.
1.5 Manpower
All workers including local and non-local employed in the project site must
attend the CIDB Green card training and obtained the green card before
commencing the work. Foreign workers must also be ensured to have a valid
work permit. The Safety and Health Officer will inspect and ensure all the
workers have valid CIDB green card and valid work permit before commencing
work.
Page I 4
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013
�
.'\v�valf k..
'-..l1a..:c•
Revision No. 00 Revision Date 12/06/2023
Page I 5
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013
�
.\••..\:\II 1,1.("'>lllW•«
Revision No. 00 Revision Date 12/06/2023
1.6.2.1.1 Dewatering
a. Water pump will used for water control during excavation, water
will remove from the excavated trench and discharge to the
nearest drain.
b. For area near to high tension cable, water control needs to be more
caution to ensure worker safety. Capacity and number of water
pump provided will base on site condition during excavation.
c. Employees should not work in excavations where water has
accumulated or where water is accumulating from any source,
unless precaution had been taken.
Page I 6
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013
�
.\..,.�,�II R�·...onh·C"•
Revision No. 00 Revision Date 12/06/2023
The excavated material which suitable for backfill material shall be located at
a proper location without affecting the public. Excavated which are not
suitable for backfill shall be carted away and dumped at contractors own
dumping site. Engineer/ Consultant's representative shall be informed for
inspection before backfilling.
__/t,.
also provide details of the designed bedding types.
"'-<,ed oo J,,�, 0,J no< The bedding material shall be placed as soon as possible after the
base of the trench is prepared and excess water has been removed.
'r-l/ Pl�) 11/4-'n/ swj
c. Granular bedding shall be placed, compacted and graded so that if
0G7ob offers continuous support to the sewer. The compacting, where
required, shall achieve a uniform density.
Page I 7
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013
�
,\,-'-,all ll:�...11•��
Revision No. 00 Revision Date 12/06/2023
3 4
Junction_Connections:
Page I 8
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013
�
.\�.._,"ti R;.-...1111�r,
Revision No. 00 Revision Date 12/06/2023
l-="-12"-l
!'r?1 CAL S[CllON qr JIJNCT•ON CONN[CTIQN ffQR 51-111.1 !OW QRAIN CR055 1NG)
'
....--- �TH
Vo\RC"S
. . [__[_f_... . 7'1/ EEkD TO SUIT
·-::_._.�:--��,'.· -�-
-�;�' ,ewe� Po.PC (WAJ�>
Page I 9
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013
�
... •'-\. 11II k..
-•.cnu�·c•
Revision No. 00 Revision Date 12/06/2023
a. The excavated trench will only be backfilled on the same day if the pipe
installed accurately otherwise the excavated trench will be covered by MS
plate for safety purpose that open for public use.
b. After pipe laying, the excavated trench will be backfilled to minimum 2m
height from final excavation level act as the platform of the temporary shoring
and then covered with steel plate to open for public used.
c. Premix Bituminous Surfacing Externally and Beyond Boundary of the
excavated road will be carry out on the following day. The methodology was
elaborate in the next section.
Page J 10
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013
�
.\•·''-JIii k""''I■.:,
Revision No. 00 Revision Date 12/06/2023
The excavated and cut material produced during excavation shall be handling
properly in order to maintain the cleanliness on site. The following actions can
be taken on handling those materials:
a.Suitable materials excavated/ cut from the ground shall be used as
backfill material.
b. All unsuitable material or surplus shall be carted away and dumped at
contractors own dumping site.
c. For IWK PDC 8, a Flow Test will be carried out using tennis ball. Sewer
pipeline is ensure to be cleaned and cleared from debris, mud or any
obstruction in the pipe line before the flow test carried out.
v2. ���itl)L tas•j i<..�c:7 fo -�c t�ud&I bcJ fro1,c lc-e,l fo -��C-�-
,�s, r:J
f / The authority will select the respective pipeline for carry out the Flow
Test using tennis baII. No.r:m�µU::to--01...wlf.l-l����.u.cJ.e.a_p.1.µe,ltfl
�t.tlo\YI
Page I 12
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013
�
,\, ....,Ml ll.•'""•,fHS\��
Revision No. 00 Revision Date 12/06/2023
Page I 13
Method Statement for Sewerage Work
� .
Document No. ARSB-AVE3-WMS-0013
•\, ,
- ..:111 k,: v.11•�,
Revision No. 00 Revision Date 12/06/2023
Water jet shall constantly spray the water to minimize the dust especially
during hot weather if any transport operation going on.
2.6 Housekeeping
Page J 14
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013
�
.\��._,;1111 Rir..1111�,
Revision No. 00 Revision Date 12/06/2023
3.0 Appendices
3.1 Construction Sequence
3.2 Job Safety Analysis (JSA)
Page I 15
•
.\�•...,H1lt lh·,oni.:r
Document No.
Revision No.
Method Statement for Sewerage Work
00
ARSB-AVE3-WMS-0013
Appendix 3.1
Construction Sequence
SEWERAGE WORK
'
Page I 16
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013
�
.,...�\�II l( t..i,nh(""
Revision No. 00 Revision Date 12/06/2023
START
\____________
,----- - - -.,
Setting out
Piloting work
,
Excavation
Dewatering (If
necessary)
Laying and
jointing VCP
Pipe Bedding
Installation of
mainhole
\ __ - --------
r
Testing and I
I Commissioning I
! '""
END
Page I 17
Method Statement for 3ewerage Work
G>ocument No. ARSB-AVE3-WMS-0013
�
\··._,,,I! R.c"'n!Ol�l"•
Revision No. 00 Revision Date 12/06/2023
Appendix 3.2
SEWERAGE WORK
Page I 18
Doc No.: HSE-AVE3-F025
AS-SYAFF RESOURCES SDN BHD
Rev:00
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL {HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
\..,.\,.all R.. ..,.,,a
..--.:-•
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SDN BHD.
PROJECT TITLE
SEWERAGE WORKS
I 1%M&ti .JSA 0013
I ■·MW 10/612023
Signature
LIKELIHOOD (L)
I EXAMPLE I RATING
Numerous fatalities, irrecoverable
The most likely result of the hazard I event being realized 5
1roductivi
MOST LIKELY CATASTROPHIC 5
POSSIBLE Has a good chance of occurring and is not unusual 4 FATAL Approximately one single fatality or major property damage if hazard is realized 4
CONCEIVABLE Might be occur at some time in future 3 SERIOUS Non-fatal injury, permanent disability 3
REMOTE Has not been known to occur after many years 2 MINOR Disabling but not permanent injury 2
INCONCEIVABLE Is practically impossible and has never occurred 1 NEGLIGIBLE Minor abrasions, bruises, cuts, first aid type injury
A ction is necessary
P/C
NO WORK ACTIVITY HAZARD WHICH CAN CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CH ERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SDN BHD.
PROJECT TITLE
SEWERAGE WORKS
I :jj@ijiti
■
JSA 0013
I ■·MW 10/6/2023
PIC
I
NO WORK ACTIVITY HAZARDZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE I
STATUS)
Wash trough needs to construct prior
start site clearing. Safetyhelmet,
Soil brought into Safety vest,
public road Spray water at dry area. SafetyShoe, PM/Engineer/
Road dirty/ Dust
3 3 Provide water browser to carry out Specific PPE to Site supervisor/
dewatering. (if required). perform task Operator
e.g.: Earplug,
Provide power broom to maintain face shield
Mobilization of equipment cleanliness (if reauiredl.
(cont') Logistic supervisor needs to inspect the
route and make sure the clearance of Safetyhelm�t.
overhead cable Safetyvest, PM/Engineer/
Striking overhead SafetyShoe, Site supervisor/
Electrocution All the overhead lines must be identified
cable
1 3 3 Specific PPE to Operator
prior start mobilization and brieflyexplain
perform task
to the driver.
e.g.: Earplug,
Install goal post with height limit sign to face shield
protect overhead cable (if reciuired)
PIC needs to ensure all the access and
egress are available and in good
condition.
All the access and egress must be free Safetyhelmet,
from anyobstruction. Safetyvest,
Excavation Sewer pipe & No access / unsafe Slip, trip & fall SafetyShoe, PM/Engineer/
access for 1 2 2 Supervisor to clearlybrief regarding job Specific PPE to Site supervisor/
manhole
Excavation area. & assign task to workers. perform task Operator
e.g.: Earplug,
ApplyPTW prior start work & fill up face shield
excavation checklist prior start work.
Used ladder that are certified by
manufacturer.
AS-SYAFF RESOURCES SDN BHD Doc No.: HSE-AVE3-F025
Rev:00
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL {HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
PROJECT TITLE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CH ERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SON BHD..
SEWERAGE WORKS
■ fo&iii JSA 0013 10/6/2023
PIC
NO WORK ACTIVITY HAZARDZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUEDATEI
STATUS)
Wear suitable safety shoes/rubber boots
with steel toe & proper tread. Safety helmet,
Conduct housekeeping & material Safety vest,
arrangement. Safety Shoe, PM/Engineer/
Muddy I slippery
Slip, trip & fall 1 2 2 Specific PPE to Site supervisor/
surface/ swampy Supervisor must ensure access to work perform task Operator
area clear. e.g.: Earplug,
Lay crusher run for machinery access (if face shield '
required)
All excavation work needs to apply PTW
Provide safe access for go into
excavation area & emergency purpose.
Safety helmet,
Straight cut I undermine excavation NOT Safety vest,
Excavation Sewer pipe & ALLOWED. Safety Shoe, PM/Engineer/
manhole (cont') Uncontrolled
Cave in / collapse 1 3 3 Specific PPE to Site supervisor/
excavation Any excavation trench more 1.2m needs
perform task Operator
to install support system if sloping/
e.g.: Earplug,
benching is not practical. Sheet pile shall
face shield
be use if applicable.
·, Soil, material or machinery must place at
least 1 meter from edoe. J
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SDN BHD.
PROJECT TITLE
SEWERAGE WORKS
, ifo@&ti JSA 0013
1 ■·me 10/6/2023
PIC
NO WORK ACTIVITY HAZARD ZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
Supervisor needs to inspect work area
and make sure the clearance of
Safety helmet,
overhead cable
Safety vest,
All the overhead lines must be identify Safety Shoe,
prior start work and brieHy explain to the Specific PPE to PM/Engineer/
Striking overhead
Electrocution 1 3 3 backhoe operator, perform task Site supervisor/
cable
e.g.: Earplug, Operator
Only trained excavator operator is face shield
allowed,
Install goalpost/marking pole with height
Excavation Sewer pipe & limit sian to protect overhead cable.
manhole (cont')
Provide signalman/ banksman to control
machinery movement for congested Safety helmet,
area. Safety vest,
Safety Shoe,
Relevant certificate for operator. Specific PPE to PM/Engineer/
Struck by moving site
Moving machinery 1 3 3 perform task Site supervisor'/
machinery Segregate access between workers /
e.g.: Earplug, Operator
machinery.
face shield
Machinery side & rear mirror in order.
Wearina visible reflective vest.
All machinery/ tool needs to inspect
Safety helmet,
prior go inside work area.
Safety vest,
All ground personal cannot approach the Safety Shoe,
Laying Sewer pipe & pipe Workers hit/ struck by machinery unless eye contact has been Specific PPE to PM/Engineer/
3 Machinery movement 1 3 3 made with operator. perform task Site supervisor/
bedding machinery
e.g.: Earplug, Operator
Competent/ licensed/ trained machinery face shield
operator.
Machinery side & rear mirror in order.
AS-SYAFF RESOURCES SON BHD Doc No.: HSE-AVE3-F025
Rev: 00
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL (HIRARC)
.\.,....S,.fTR
. . --..•·11�.:;:�
-.
···
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
PROJECT TITLE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CH ERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SON BHD.
PIC
NO WORK ACTIVITY HAZARDZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
All excavation work needs to apply PTW
Provide safe access for go into
excavation area & emergency purpose.
Straight cut/ undermine excavation NOT
ALLOWED.
Safety helmet,
Any excavation trench more 1.2m needs Safety vest,
to install support system if sloping/ Safety Shoe, PM/Engineer/
Uncontrolled
Cave in / collapse of soil 1 3 3 benching is not practical. Sheet pile shall Specific PPE to Site supervisor/
excavation
be use if applicable. perform task Operator
e.g.: Earplug,
Covering soil to avoid direct landslide face shield
Laying Sewer pipe & pipe Soil, material or machinery must place at
bedding (cont') least 1 meter from edge.
Supervisor to ensure excavation area
.
safe before allow workers to enter the
work area
Safety helmet,
Wear suitable safety shoes/rubber boots Safety vest,
with steel toe & proper tread. Safety Shoe,
Specific PPE to PM/Engineer/
Uneven surface / Conduct housekeeping & material
Slip, trip & fall 1 2 2 perform task Site supervisor/
Scattered material arrangement.
e.g.: Earplug, Operator
Supervisor must ensure access to work face shield
area clear & no obstruction.
AS-SYAFF RESOURCES SDN BHD Doc No. : HSE-AVE3-F025
Rev: 00
�
\•-"i).tl R�•,.01:1..:n
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL (HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
PROJECT TITLE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CH ERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SON BHD.
SEWERAGE WORKS
IW@Mli JSA 0013
I ■·MW 10/6/2023
PIC
I
NO WORK ACTIVITY HAZARD ZARO CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
Safety helmet, ?
Safety vest,
Wear suitable type of dust mask. Safety Shoe, PM/Engineer/
Dust Inhalation of dust. 1 3 3 Specific PPE to Site supervisor/
Spray water at dry area to control dust. perform task Operator
e.g.: Earplug,
face shield
Buddy system to minimize repetitive Safety helmet,
work / heavy manual lifting. Safety vest,
Safety Shoe, PM/Engineer/
Improper manual Conduct exercise prior start work.
handling
Ergonomics injury / Back pain 1 2 2 Specific PPE to Site supervisor/
Wheel barrow shall be use on suitable perform task Operator
surface condition. e.g.: Earplug,
face shield
PIC
NO WORK ACTIVITY HAZARDZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
Wear proper PPE, safety Helmet, Shoe,
& vest. Safety helmet,
Safety vest,
Pinch point To wear semi leather gloves. Safety Shoe, PM/Engineer/
hazard/Caught in Hand or finger injuries. 1 3 3 Works to be conducted by trained Specific PPE to Site supervisor/
between workers. perform task Operator
e.g.: Earplug,
Conduct toolbox & emphasize regarding face shield
Laying Sewer pipe & pipe this hazard to workers involved
4
bedding (cont) Wear suitable safety shoes with proper
tread. Safety helmet,
Safety vest,
Conduct housekeeping & material Safety Shoe, PM/Engineer/
Scattered Material I arrangement.
Slip, trip & fall 2 2 4 Specific PPE to Site supervisor/
Uneven ground
Supervisor must ensure access to work perform task Operator
area clear & no obstruction. e.g.: Earplug,
face shield
Mark or barricade any obstruction.
Wear proper PPE, safety Helmet, Shoe,
& vest. Safety helmet,
Safety vest,
Pinch point To wear semi leather gloves. Safety Shoe, PM/Engineer/
5 Installation of manhole hazard/Caught in Hand or finger injuries. 1 3 3 Works to be conducted by trained Specific PPE to Site supervisor/
between workers. perform task Operator
e.g.: Earplug,
Conduct toolbox & emphasize regarding face shield
this hazard to workers involved
AS-SYAFF RESOURCES SON BHD Doc No.: HSE-AVE3-F025
Rev:00
�
h-\uU R("',11\:h·.:1
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL (HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
PROJECT TITLE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CH ERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SDN BHD.
SEWERAGE WORKS
, ■
JSA 0013 1
1
PIC
NO WORK ACTIVITY HAZAROZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
Wear suitable safety shoes with proper
tread. Safety helmet,
Safety vest,
Conduct housekeeping & material Safety Shoe, PM/Engineer/
Scattered Material / arrangement.
Slip, trip & fall 2 2 4 Specific PPE to Site supervisor/
Uneven ground
Supervisor must ensure access to work perform task Operator
area clear & no obstruction. e.g.: Earplug,
face shield
Mark or barricade anv obstruction.
In any condition out rigger must fully
extend before operate.
All outrigger need to attach with steel
plate
Improper parking of
Make good I compact all soft ground
crane or machine /
Installation of manhole Crane or machine collapse 1 3 3 area before park
not solid ground
(cont)
foundation Operator / lifting supervisor need to
inspect ground condition at working area
prior start work.
Valid PMA & DOSH certificate and valid
JPJ drivino license f o r ooerator.
All lifting gear must be inspected prior
start work.
Make sure lifting gear capable to take
Improper lifting load & used the right lifting gear.
method I not Loss load / lifting fail 1 4 4
approved lifting gear Lifting supervisor to supervise lifting
activity.
Lifting supervisor to brief lifting activities
to liftinq team
AS-SYAFF RESOURCES SDN BHD Doc No.: HSE-AVE3-F025
Rev: 00
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL (HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TING KAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
PROJECT TITLE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CH ERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SDN BHD.
PIC
NO WORK ACTIVITY HAZARD ZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
Provide tag line to control load during
lifting.
Safety helmet,
Exclusion zone shall be established
Safety vest,
Movement load I Workers are prohibited to be underneath Safety Shoe, PM/Engineer/
Workers struck I crushed by
wrong position during 1 3 3 the load during lifting. Specific PPE to Site supervisor/
load
lifting perform task Operator
To apply PTW from SHE department if e.g.: Earplug,
load more than 1 0tonne face shield
Trained slinger I rigger to carry slinging
Installation of manhole
activity.
(cont)
Provide banksman to control movement
not hit during lifting work. Safety helmet,
Conduct pre task talk prior start work & Safety vest,
emphasize regarding this hazard to all Safety Shoe, PM/Engineer/
Limited access/ Hit the workers and other
1 3 3 worker. Specific PPE to Site supervisor/
constraint area properties
perform task Operator
Follow/ refer to approved Method e.g.: Earplug,
Statement fiow face shield
VALLEY, BANDAR TUN HUSSEIN ONN, MU.KIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SON BHD.
PROJECT TITLE
SEWERAGE WORKS
I iifaMMii JSA 0013 1 ■·me 10/6/2023
PIC
1
NO WORK ACTIVITY HAZARD ZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
Provide signalman / banksman to control
machinery movement for congested Safety helmet,
area. Safety vest,
Safety Shoe,
Relevant certificate for operator. Specific PPE to PM/Engineer/
Struck by moving site
Moving machinery 1 3 3 perform task Site supervisor/
machinery Segregate access between workers /
e.g.: Earplug, Operator
machinery.
face shield
Machinery side & rear mirror in order.
WearinQ visible reflective vest.
Wear suitable safety shoes/rubber boots
with steel toe & proper tread. Safety helmet,
Conduct housekeeping & material Safety vest,
arrangement. Safety Shoe, PM/Engineer/
Muddy I slippery
Backfilling (Cont) Slip, trip & fall 1 2 2 Specific PPE to Site supervisor/
surface/ swampy Supervisor must ensure access to work perfom, task Operator
area clear. e.g.: Earplug,
Lay crusher run for machinery access (if face shield
reauired)
All excavation work needs to apply PTW
Provide safe access for go into Safety helmet,
excavation area & emergency purpose. Safety vest,
Safety Shoe, PM/Engineer/
Uncontrolled Ensure backfilling area shall be safe
Cave in / collapse 1 3 3 Specific PPE to Site supervisor/
backfilling from any
perfom, task Operator
Supervision by supervisor during the e.g.: Earplug,
activity. face shield
AS-SYAFF RESOURCES SDN BHD Doc No.: HSE-AVE3-F025
Rev:00
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL (HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RU MAH TERES 2 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
PROJECT TITLE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SON BHD.
PIC
NO WORK ACTIVITY HAZARDZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
Safety helmet,
Conduct toolbox talk & emphasize Safety vest,
regarding this hazard to all worker. Safety Shoe, PM/Engineer/
Lightning strike can cause
Bad Weather 1 4 4 Specific PPE to Site supervisor/
whole body burnt or fatality All outdoor & external work shall be stop perform task Operator
during thunderstorms & heavy rain. e.g.: Earplug,
face shield
Buddy system to minimize repetitive Safety helmet,
work/ heavy manual lifting. Safety vest,
Safety Shoe, PM/Engineer/
Improper manual Conduct exercise/ stretching prior start
Ergonomics injury / Back pain 1 2 2 Specific PPE to Site supervisor/
handling work.
perform task Operator
General (cont') Wheel barrow shall be use on suitable e.g.: Earplug,
surface condition. face shield
Wear suitable safety shoes with proper
tread.
Safety helmet,
Conduct housekeeping & material Safety vest,
arrangement. Safety Shoe, PM/Engineer/
Scattered Material /
Slip, trip & fall 2 2 4 Specific PPE to Site supervisor/
Uneven ground Supervisor must ensure access to work
perfonm task Operator
area clear & no obstruction.
e.g.: Earplug,
Mark or barricade any obstruction. face shield
Doc No. : HSE-AVE3-F025
AS-SYAFF RESOURCES SDN BHD
Rev: 00
� HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL {HIRARC)
.\:-.....,?,� �"-"':'��;.. -:.
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TING KAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SON BHD.
PROJECT TITLE
SEWERAGE WORKS -
------ ------' IW@dii JSA 0013
1 ■·we I0/6/2023
PIC
1
NO WORK ACTIVITY HAZARLlZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
All night work activity must get approval
permit from local authority & client.
Standby backup lighting in case of power
/ existing tower light failure
Workers must have enough rest and
physically fit to conduct night work Safety helmet.
All area needs to receive background & Safety vest,
task lighting from 2 directions. Safety Shoe, PM/Engineer/
General (cont') Nightwork Poor Visibility 2 3 6 Specific PPE to Site supervisor/
Provide lighting for access & work area perform task Operator
All machinery needs to equip with e.g.: Earplug,
warning light and all lamps in orders. face shield
Provide high visibility vest with reflective.
Minimum lighting provides 50 lux for
access & 100 lux for all working area,
dangerous opening & lifting or lowering
activity