project quality plan

DOCUMENT/ MATERIAL /SAMPLE FOR APPROVAL i!lUDA


project AVANUE 3 trade
to (organization) KHAIRI CONSULT SDN BHD 0 C&S
attention to Puan Norazlinda Elisa □ M&E
reference number ARSB-AVE3-WMS-0013 □ ARCH.
date 12/6/2023 □
copy to ,0 Client D QS Consultant
□ Architect D Landscape Consultant
□ C&S Consultant � Site Office
□ M&E Consultant □
description of Method Statement
material/sample
SEWERAGE WORK

location to be used SEWERAGE LINE

r&ences
(spec. clause. etc.)

supplier
installer
attachment D Manufacturer's Drawings !ZI Method Statement
□ Manufacturer's Literature U Product Certificate
□ Sample/ Brochure D Performance/Technical Data
D Design Calculation □
name designation
submitted by Si�

Muhammad ldh am Bin Aziz M&E Engineer

APPROVAL RESPOND
recommendation by consulting engineers/architect approval by superintending officer

documentjmaterialjsample status: documentjmaterialjsample status


□ □
;JZ' approved
approved with comment □
approved
approved with comment
□ rejected D rejected

comments comments

flocise1 r'tfQ( 1o ih(/ CDfllfnQnts- f;\S


� tt r;,q,..,"'.

signature signature

name name
Ntf1:if! >lltvA I� 11'1 ll I �
date date
·'fc/:J.o:)J

Ref. No. : UH-MO-GTSD-QA-PQP-F5 Revision: 2 Effective Date : 1 September 2020 Page 1 of 1


CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2
TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2
ZON 13) LAKE VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM
CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK
TETUAN UDA LAND SON BHD.

METHOD STATEMENT
FOR

SEWERAGE WORK

Reference ARSB-AVE3-WMS-0013
No. Revision 00
Date Issued 12/06/2023

Prepared by Reviewed by Approved by


Contractor, Consultant, Client/SO,

--------�------ --------------------------------- ---------------------------------


Name: Muhammad ldham Name: Name:
Bin Aziz Designation: Designation:
Designation: Project Date: -Date:
Engineer
-�
Date: 12/06/2023
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013
. .�
,\•·"""tl Rc�••�n
Revision No. 00 Revision Date 12/06/2023

Table of Contents
1.0 Scope of 3
1.1 General Description 3
1.2 References ......... . 3
1.3 Materials 3
1.4 Plant and Equipment................................................................................ 3
1.5 Manpower.................................................. . 4
1.6 Construction Procedure 5
1.6.1 Pilot work {beyond the boundary) 5
1.6.2 Vitrified clay pipe (VCP) installation................................................................................ 5
1.6.2.1 Before excavation 5
1.6.2.1 During excavation 6
1.6.2.1 After excavation (Beyond the Boundary) ...................................................................... 10
1.6.3 Manhole Installation ..................................................................................................... 10
1.6.4 Handling of excavated / cut material............................................................................ 11
1.6.5 Site clearing/ cleaning .................................................................................................. 11
1.6.6 Inspection and handling over to IWK ............................................................................ 11
2.0 SAFETY AND HEALTH 13
2.1 Job Safety & Health Analysis 13
2.2 Information to personal 13
2.3 Emergency Arrangements..... 13
2.4 Air Quality and Noise level 13
2.5 Waste Management ........ 14
2.6 Housekeeping 14
3.0 Appendices ............................. :............................................ . 15
3.1 Construction Sequence 15
3.2 Job Safety Analysis {JSA) 15

Page I 2
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013

.,,-...,,au Ro.:..."•·•
Revision No. 00 Revision Date 12/06/2023

1.0 Scope of work

1.1 General Description


This method statement is prepared to elaborate the installation methods carry
out by the contractor for the Construction and Completion of Gravity
Sewerage (Open Cut Method} and Other Associated Works and to ensure the
construction and completion of this work is compliance with contract
requirements, drawings, technical specification and quality control.

1.2 References
The relevant references are as follows:
No. Description Document Ref no.
Doc No: JKR 20800-0226-20 (01}
Technical Specification
SECTION F: SEWERAGE
2 References Drawing Approved Drawing
3 HSE ARSB-AVE3-PSHP-0001

1.3 Materials
All relevant material shall be submitted and approved through the Material
submission approval.

1.4 Plant and Equipment


The proposed machinery and plant schedule shown below is apply to one
team of worker:

Item Type Capacity* Unit**


1 Hydraulic Excavator 20Ton 1
2 Tipper Lorries 6cu.m/trip 1
3 Backhoe - 1
4 Tool Box 2' X 2'X 4' 1
5 Water Pump 80mm Dia. 1
Outlet
6 Generator set 1 H/P 1
* Estimated value
** May varies based on site condition

Ir

Page I 3
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013

,\.,.,,.111 Ro.,..i.11■,a·:
Revision No. 00 Revision Date 12/06/2023

A team will comprise of machineries and plants as listed above together with
skilled workers. Except for the machineries and equipment listed above, any
other required machineries and equipment will be also be prepared and used
if necessary.

1.5 Manpower
All workers including local and non-local employed in the project site must
attend the CIDB Green card training and obtained the green card before
commencing the work. Foreign workers must also be ensured to have a valid
work permit. The Safety and Health Officer will inspect and ensure all the
workers have valid CIDB green card and valid work permit before commencing
work.

No. Description Type of Brief Roles and


Responsibilities
1 Construction Site Engineer/ Planning, coordinating and
Work Supervisor supervising construction
activities
Land surveyor/ Setting out of works and
Chainman checking of completed works
Machinery and Operating the plants and
plant operator machineries
General Worker Carrying out general works at
site
2 QAQC QAQC Engineer To inspect the item of works as
provided in the Inspection &
Test Plan
Lab Technician To carry out sampling and
/ Workers testing of materials
3 Safety, Health Safety Officer To implement and audit safety
and Environment requirements at site, to
enforce safety rules and
regulations at work place
Security Guard To guard the materials, plant
and machinery at site

Page I 4
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013

.'\v�valf k..
'-..l1a..:c•
Revision No. 00 Revision Date 12/06/2023

1.6 Construction Procedure

1.6.1 Pilot work (beyond the boundary)


A piloting work to determine the existing underground utilities location before
commencement of work. All pilot works shall be carried out under our
supervision ancient. The piloting work shall carry out as follow:

a. The critical location to be piloted will be confirmed by Client.


b. The excavation may first started excavate with backhoe. Manually
excavate by shovel and hoe if suspect utility found. The cable, water
pipes, telephone cables, fibre optic, and etc route shall be marked
and barricade to avoid accidentally damage.
c. Piloting/Utility detection need to be carried out all along a segment
(in intervals) to confirm no utilities along the alignment.
d. Proper signage and barricades shall be installed to warn passer-by.
Pilot trench shall be covered back by granular fill material with
proper compaction using plate compactor and the unsuitable or
hard excavated materials will be disposing from site.
e. Road surface to be reinstated with approved specification, which is
follow with sand, crusher, binder course and final with wearing
course.
f. The pilot trench dimension and details of underground
utilities/services shall be sketched and submit to Consultant for
record purpose.
a l�11. p•.�oi 1(fvit.h 1o ,nclicute lbf, \ocu·\,00
of rccJ ,t \
J <;,tWtl.1�C f•.P1lll'lv ·
1.6.2 Vitrified clay pipe (VCP) installation
This section will introduce the installation method of the VCP along the
proposed sewer pipe alignment and length. It covered three parts of the
installation works during different stages, which are: before excavation, during
excavation and after excavation. Open-cut method will be used for this
sewerage works and according to the Indah Water Konsortium (IWK) Approved
Drawing.

1.6.2.1 Before excavation


a. The total length of this sewer pipe line is approximately 650m.
b. Prior for commencement of excavation work, the route of the pipe
shall be pegged out and the pegging point shall mark at the
·centerline and the level to which the pipe to be laid shall be- marked
on it.

Page I 5
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013

.\••..\:\II 1,1.("'>lllW•«
Revision No. 00 Revision Date 12/06/2023

c. Piloting work and exploration trenched will be done before the


pipe laying to ascertain hidden obstruction such as underground
services.

1.6.2.1 During excavation


a. A maximum of 6m to 10m length of trench will be excavated by one
team of worker to lay the sewer pipe (each pipe is lm to 1.75m per
length) per day.
b. The maximum trench width shall be with maximum trench
according to the VC Pipe size (which had specified in the details
drawings provided by consultant) unless specially specify or due to
site constraint.
c. Backhoe and excavator will be used for the excavation works.
Manually excavation may also be based on the condition. For
excavation area near to the high-tension cable, excavation must be
carry out under supervision.
d. The trench shall be excavated to the depth intended and every
invert level shall be pegged out before pipe laying.
e. The bottom of the trench shall be graded so that the pipe invert
level slopes evenly between the adjacent invert levels.
f. For excavation depth less than 1.2m, temporary shoring may
require based on on-site soil condition while for excavation depth
more than 1.2m, temporary shoring need to be provided for safety
purpose.

1.6.2.1.1 Dewatering
a. Water pump will used for water control during excavation, water
will remove from the excavated trench and discharge to the
nearest drain.
b. For area near to high tension cable, water control needs to be more
caution to ensure worker safety. Capacity and number of water
pump provided will base on site condition during excavation.
c. Employees should not work in excavations where water has
accumulated or where water is accumulating from any source,
unless precaution had been taken.

Page I 6
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013

.\..,.�,�II R�·...onh·C"•
Revision No. 00 Revision Date 12/06/2023

1.6.2.1.2 Laying and joining of VCP


i. Prior to lowering down the pipes, appropriate bedding materials
will be laid in accordance to the construction drawings and
specification and will be determined and agreed depending on site
and soil conditions refer to standard construction drawings.
ii. Stringing down the pipe into the excavated trench and placed
carefully onto the graded base.
iii. The invert lev_el of each pipe laid will checked by Dumpy Level
Machine during laying and immediately after laying completion,
and with reference to the Authority Approved drawings.
iv. Pipes are jointed through spigot and socket type as per the
requirement to meet the specification.
v. After the completion of laying the pipes, the interior of pipes or
specials shall be carefully cleaned to remove debris, dirt of other
matter that may have entered the pipe during pipe laying.

The excavated material which suitable for backfill material shall be located at
a proper location without affecting the public. Excavated which are not
suitable for backfill shall be carted away and dumped at contractors own
dumping site. Engineer/ Consultant's representative shall be informed for
inspection before backfilling.

1.6.2.1.3 Pipe Bedding


a. Only approved materials are allowed to be used for pipe
embedment. They shall be in accordance to the approved
longitudinal and cross-sectional sewer profile drawings, which shall

__/t,.
also provide details of the designed bedding types.
"'-<,ed oo J,,�, 0,J no< The bedding material shall be placed as soon as possible after the
base of the trench is prepared and excess water has been removed.
'r-l/ Pl�) 11/4-'n/ swj
c. Granular bedding shall be placed, compacted and graded so that if
0G7ob offers continuous support to the sewer. The compacting, where
required, shall achieve a uniform density.

Page I 7
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013

,\,-'-,all ll:�...11•��
Revision No. 00 Revision Date 12/06/2023

1.6.2.1.4 VC Pipe laying and joining

Sequences of VC Pipe laying:

1. Cleaning the Vitrified Clay Pipe (VC) pipe.


2. Handling with care to lower VC Pipe into trench with appropriates
bedding.
3. Cleaning of socket and spigot joint.
4. Apply lubricant on both joint end.
5. Push spigot pipe into jointing socket with crowbar.
6. Align and checking levels with bedding.

3 4

Junction_Connections:

1. Where an existing public sewer is circular and is of diameter DN450


or less, any connection to that sewer may be made using Y junction
fitting.
2. Where the location of future connections are known, Y junction
fittings and the accompanying junction connection pipework may
be installed at the time of the public sewer construction.

Page I 8
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013

.\�.._,"ti R;.-...1111�r,
Revision No. 00 Revision Date 12/06/2023

l-="-12"-l
!'r?1 CAL S[CllON qr JIJNCT•ON CONN[CTIQN ffQR 51-111.1 !OW QRAIN CR055 1NG)

1-, �' '


'v,,

'

·100 "'1N CONC:,,Cl[ �Uli<IOUIO

F'l"'-.SJ.f BC:K"4O SOCMET F'A.CE


, " SlOPC ro PO>QP[lllY Ll>i( (r,iN Gf<AOC)

....--- �TH
Vo\RC"S
. . [__[_f_... . 7'1/ EEkD TO SUIT

•,cP / IN: St�tll l'IPC

f\CXllfJLC 1tuoot.11 Jt1t�t: J(')rt◄1'$

:::,o"'� ::eot,c sv""out<�


iJ:· , •'I
-�:
,•)t ·, ·:,c \Im I rec ......i:'llON
j_-- -f: -,________ CAA!:[ C20 �Cf.'£i[ 9JRRO.mo

·-::_._.�:--��,'.· -�-
-�;�' ,ewe� Po.PC (WAJ�>

DEEP JUNCTION CONNECTION

Page I 9
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013

... •'-\. 11II k..
-•.cnu�·c•
Revision No. 00 Revision Date 12/06/2023

1.6.2.1 After excavation (Beyond the Boundary)

a. The excavated trench will only be backfilled on the same day if the pipe
installed accurately otherwise the excavated trench will be covered by MS
plate for safety purpose that open for public use.
b. After pipe laying, the excavated trench will be backfilled to minimum 2m
height from final excavation level act as the platform of the temporary shoring
and then covered with steel plate to open for public used.
c. Premix Bituminous Surfacing Externally and Beyond Boundary of the
excavated road will be carry out on the following day. The methodology was
elaborate in the next section.

1.6.3 Manhole Installation

The manhole installation is mainly divided to three stages, which are


excavation to the intended depth, installation of manhole component and
followed by concrete manhole surrounding.
All manholes shall be sited at public road reserve to ensure accessibility by the
relevant authority for maintenance purpose. The sequence of manhole
installation and pipe laying will be carried out simultaneously.

The manhole installation shall carry out as follow:


a. The construction /installation of manhole shall follow the specification
provided lndah Water Konsortium (IWK}.
b. The location and the invert level of the manhole shall be determined
before the excavation.
c. The excavated depth for manhole installation shall refer to the IWK
Approved Drawings.
d. For excavation depth more than 1.2m, temporary ground support
system is required to be installed for safety purpose. The temporary
shoring/sloping method to be used for manhole installation.
e. The final excavation level of the manhole shall be pegged out to ensure
it reached the intended depth.
f. The base of the manhole shall not be less than 400mm thickness, which
is measured from the channel invert.
g. Channel invert shall be laid accurately to meet entry and exit pipe
inverts.
h. Flexible joints shall be provided at the exits and entry if the manholes
and shall be placed immediately outside any poured-in-situ concrete
surround.

Page J 10
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013

.\•·''-JIii k""''I■.:,
Revision No. 00 Revision Date 12/06/2023

i. Manhole component shall be pieced together until the desired level is


reached.
i. Joints between the pre-cast chamber rings shall be sealed with suitable
mortar, which can be high alumina cement mortar or equivalent.
ii. Once the installation work done, the excavated areas need to be
backfilled and to proceed with concrete work.
iii. The mould will be removed once the concrete work done.
iv. The manhole cover will finished flushed with road or shoulder level. On
green area or beyond road shoulder, shall be finished 018ot:Jt i!!OQl;a,s;i to
3Q�. l;'Omrr, h1�hav ·

The backfill material shall be selected earth or material approved by


consultant.

1.6.4 Handling of excavated/ cut material

The excavated and cut material produced during excavation shall be handling
properly in order to maintain the cleanliness on site. The following actions can
be taken on handling those materials:
a.Suitable materials excavated/ cut from the ground shall be used as
backfill material.
b. All unsuitable material or surplus shall be carted away and dumped at
contractors own dumping site.

1.6.5 Site clearing/ cleaning


a. All the rubbish, logs, demolished structures, debris and any waste
material produced during the works that have been stacked and
heaped together would be loaded into the tipper lorries for the disposal
at the designated area. No burning of waste shall be done on site.
tota,l'le,t\ C.l:'IV S\H>vt\d lac ctivf'l.:.d ()u1 we-fl',,.a
t�C...?
iM,fh.. c..ti�"" -wn1.r. ·,c; r..-t\.,�,,u\ bi.\ So
/ 1.6.6 Inspection and handling over to IWK J
a. The following submission will be carried out before handling over to
IWK: f\ot,·tj
• PDC 6 - To tt'lff)ffl't-lWK aftEl�tlt'st-rh
fo pefrmssron of start work.
h �,e,a r
• PDC 7 - To inform IWK foY\fit�inspe tion and ready for handling
over to authorities•(Ball t:est ai1d CCTV test have to be carried out)
• PDC 8 - Submission to IWK with the documents of As-Built Drawing,
CCTV Report to obtain the 'Surat Sokongan' from IWK.
(
rlON tast w,t h \W\,- . Page 111
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013

.\,.�,.. 11 R�-o,1.ua.c,
Revision No. 00 Revision Date 12/06/2023

b. For authority inspection IWK PDC 7, physical and CCTV inspection on


pipe condition will be carried out. A specialist license CCTV contractor
will be appointed for the said inspection. CCTV report will be provided
after the inspection. l-l-1v 1s. "<◄'-cl f<'l.:t'" -oot. ':jl.!01, on\'1-

c. For IWK PDC 8, a Flow Test will be carried out using tennis ball. Sewer
pipeline is ensure to be cleaned and cleared from debris, mud or any
obstruction in the pipe line before the flow test carried out.
v2. ���itl)L tas•j i<..�c:7 fo -�c t�ud&I bcJ fro1,c lc-e,l fo -��C-�-
,�s, r:J
f / The authority will select the respective pipeline for carry out the Flow
Test using tennis baII. No.r:m�µU::to--01...wlf.l-l����.u.cJ.e.a_p.1.µe,ltfl
�t.tlo\YI

wttl-be selected for Flow I est.*


�4il is possibility where -100% of the constructed pipeline will put
under Flow Test upon request of the IWK's officer.

Y· The respective tennis ball receiving at the following manhole without


obstruction will be treated as successful flow test for the pipeline and
the test considered fail if the tennis ball stuck in the pipeline. Any
defects of pipeline must be rectified and IWK's officer to reschedule the
Flow Test.

h;. Inspection/testing shall follow IWK's requirements (subject to final


discussion with IWK)

Page I 12
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013

,\, ....,Ml ll.•'""•,fHS\��
Revision No. 00 Revision Date 12/06/2023

2.0 SAFETY AND HEALTH

2.1 Job Safety & Health Analysis


Job Safety & Health Analysis shall be carried out on the project site. Barriers
and safety awareness signs shall be established at location of works. The
potential hazards in a particular activity and the control measures
implemented shall be briefed to the workers during safety induction, tool box
talk and JSA Briefing. Road works shall be commenced in accordance to the
requirements spelt in Project Safety Health Plan (PSHP).

2.2 Information to personal


All workers employed in the project site must have valid document. The safety
personnel will inspect and ensure all the workers have valid document before
commencing work.
All the control measures detailed in the job safety & health analysis will be
disseminated to site personnel through:
Safety Induction Briefing
Tool Box Briefing
Notice Board
Safety & Health Meeting
Permit to Work etc.
All the attendance records and briefing materials will be maintained and
properly recorded.
The supervisors will be trained based on the approved work method statement
which is including the safety and health, as well as the environmental and
quality requirements. Subsequently, the supervisors will brief the information
to the site workers prior the commencement of work at site.
2.3 Emergency Arrangements
The emergency situations which may occur are shown in the appendix 3.2 for
jobs safety analysis.

2.4 Air Quality and Noise level


All construction machineries shall be in well maintain and in good working
condition to reduce emission of soot, smoke and noise.
The following measures shall be implemented if the above mentioned (soot,
smoke and noise) is deteriorating:
Increase maintenance frequency

Page I 13
Method Statement for Sewerage Work

� .
Document No. ARSB-AVE3-WMS-0013

•\, ,
- ..:111 k,: v.11•�,
Revision No. 00 Revision Date 12/06/2023

Replace to better equipment if necessary.


Switched-off equipment if not in used.
Supply workers on-site with proper PPE (i.e. ear plugs and mask).

Water jet shall constantly spray the water to minimize the dust especially
during hot weather if any transport operation going on.

2.5 Waste Management

Scheduled waste from maintenance works of machineries, vehicles and tools


shall be placed in designated areas at the site. Proper oil trays shall be placed
for oil petroleum product to prevent oil spillage at ground. Scheduled waste
shall be collected and transferred to scheduled waste storage area. The
scheduled waste shall be disposed by license contractor registered with DOE
to approved dump site. Scheduled waste storage and disposal shall follow EQ
(Scheduled Waste) Regulation 2005 accordingly.

2.6 Housekeeping

Housekeeping is an essential part of safety for the daily routine. Housekeeping


would include the following items:

Maintain the access/egress to all working area.


Store and stack all construction materials in safe and orderly manner
No littering around the site and provide sufficient waste bin.

Page J 14
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013

.\��._,;1111 Rir..1111�,
Revision No. 00 Revision Date 12/06/2023

3.0 Appendices
3.1 Construction Sequence
3.2 Job Safety Analysis (JSA)

Page I 15

.\�•...,H1lt lh·,oni.:r
Document No.

Revision No.
Method Statement for Sewerage Work

00
ARSB-AVE3-WMS-0013

Revision Date 12/06/2023

Appendix 3.1

Construction Sequence

SEWERAGE WORK

'

Page I 16
Method Statement for Sewerage Work
Document No. ARSB-AVE3-WMS-0013

.,...�\�II l( t..i,nh(""
Revision No. 00 Revision Date 12/06/2023

START
\____________

,----- - - -.,

Setting out

Piloting work

,
Excavation

Dewatering (If
necessary)

Laying and
jointing VCP

Pipe Bedding

Installation of
mainhole
\ __ - --------

r
Testing and I
I Commissioning I

! '""

END

Figure 1 Flow chart for Sewerage Work

Page I 17
Method Statement for 3ewerage Work
G>ocument No. ARSB-AVE3-WMS-0013

\··._,,,I! R.c"'n!Ol�l"•
Revision No. 00 Revision Date 12/06/2023

Appendix 3.2

Job Safety Analysis (JSA)

SEWERAGE WORK

Page I 18
Doc No.: HSE-AVE3-F025
AS-SYAFF RESOURCES SDN BHD
Rev:00
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL {HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
\..,.\,.all R.. ..,.,,a
..--.:-•

VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SDN BHD.
PROJECT TITLE

SEWERAGE WORKS
I 1%M&ti .JSA 0013
I ■·MW 10/612023

Signature

Name MUHAMAD All BIN AB RAHMAN


Designation PROJECT ENGINEER SAFETY HEAL TH OFFICER PROJECT MANAGER
Date 10/6/2023 10/6/2023 10/6/2023
- -

LIKELIHOOD (L)
I EXAMPLE I RATING
Numerous fatalities, irrecoverable
The most likely result of the hazard I event being realized 5
1roductivi
MOST LIKELY CATASTROPHIC 5

POSSIBLE Has a good chance of occurring and is not unusual 4 FATAL Approximately one single fatality or major property damage if hazard is realized 4
CONCEIVABLE Might be occur at some time in future 3 SERIOUS Non-fatal injury, permanent disability 3

REMOTE Has not been known to occur after many years 2 MINOR Disabling but not permanent injury 2

INCONCEIVABLE Is practically impossible and has never occurred 1 NEGLIGIBLE Minor abrasions, bruises, cuts, first aid type injury

No need action required

A ction is necessary

Action needed to reduce risk


AS-SYAFF RESOURCES SDN BHD Doc No. : HSE-AVE3-F025
Rev:00
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL (HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
PROJECT TITLE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SON BHD.

P/C
NO WORK ACTIVITY HAZARD WHICH CAN CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)

Provide signalman / banksman to control


machinery movement for congested
area.
Safety helmet,
Ensure all machinery has beacon light, Safety vest,
reverse / swing alarm. Safety Shoe, PM/Engineer/
Struck by moving site
Moving machinery 1 3 3 Relevant certificate for operator. Specific PPE to Site supervisor/
machinery
perfonm task Operator
Segregate access between workers / e.g.: Earplug,
machinery. face shield
Machinery side & rear mirror in order.
Wearinq oranqe reflective vest.
All material needs to secure with proper Safety helmet,
1 Mobilization of equipment lashing. Safety vest,
Safety Shoe, PM/Engineer/
Improper lashing Load fall during transportation 1 3 Transportation supervisor / operator
3 Specific PPE to Site supervisor/
needs to check & ensure load secure perfonm task Operator
before start transportation. e.g.: Earplug,
face shield
All access must clear from any
obstruction.
Safety helmet,
Provide flag / banksman to control Safety vest,
machinery movement for congested Safety Shoe, PM/Engineer/
Limited access Hit another property 1 3 3 area. Specific PPE to Site supervisor/
For congested area needs to avoid perform task Operator
delivery during peak hour. e.g.: Earplug,
face shield
Reverse exit is not allowed for all
machinerv
Doc No.: HSE-AVE3-F025
AS-SYAFF RESOURCES SON BHD
Rev:00
� HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL (HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TING KAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
\,...�\ �u M....... 1\:1.::..-,

VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CH ERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SDN BHD.
PROJECT TITLE

SEWERAGE WORKS
I :jj@ijiti

JSA 0013
I ■·MW 10/6/2023

PIC
I
NO WORK ACTIVITY HAZARDZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE I
STATUS)
Wash trough needs to construct prior
start site clearing. Safetyhelmet,
Soil brought into Safety vest,
public road Spray water at dry area. SafetyShoe, PM/Engineer/
Road dirty/ Dust
3 3 Provide water browser to carry out Specific PPE to Site supervisor/
dewatering. (if required). perform task Operator
e.g.: Earplug,
Provide power broom to maintain face shield
Mobilization of equipment cleanliness (if reauiredl.
(cont') Logistic supervisor needs to inspect the
route and make sure the clearance of Safetyhelm�t.
overhead cable Safetyvest, PM/Engineer/
Striking overhead SafetyShoe, Site supervisor/
Electrocution All the overhead lines must be identified
cable
1 3 3 Specific PPE to Operator
prior start mobilization and brieflyexplain
perform task
to the driver.
e.g.: Earplug,
Install goal post with height limit sign to face shield
protect overhead cable (if reciuired)
PIC needs to ensure all the access and
egress are available and in good
condition.
All the access and egress must be free Safetyhelmet,
from anyobstruction. Safetyvest,
Excavation Sewer pipe & No access / unsafe Slip, trip & fall SafetyShoe, PM/Engineer/
access for 1 2 2 Supervisor to clearlybrief regarding job Specific PPE to Site supervisor/
manhole
Excavation area. & assign task to workers. perform task Operator
e.g.: Earplug,
ApplyPTW prior start work & fill up face shield
excavation checklist prior start work.
Used ladder that are certified by
manufacturer.
AS-SYAFF RESOURCES SDN BHD Doc No.: HSE-AVE3-F025
Rev:00
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL {HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
PROJECT TITLE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CH ERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SON BHD..

SEWERAGE WORKS
■ fo&iii JSA 0013 10/6/2023
PIC
NO WORK ACTIVITY HAZARDZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUEDATEI
STATUS)
Wear suitable safety shoes/rubber boots
with steel toe & proper tread. Safety helmet,
Conduct housekeeping & material Safety vest,
arrangement. Safety Shoe, PM/Engineer/
Muddy I slippery
Slip, trip & fall 1 2 2 Specific PPE to Site supervisor/
surface/ swampy Supervisor must ensure access to work perform task Operator
area clear. e.g.: Earplug,
Lay crusher run for machinery access (if face shield '
required)
All excavation work needs to apply PTW
Provide safe access for go into
excavation area & emergency purpose.
Safety helmet,
Straight cut I undermine excavation NOT Safety vest,
Excavation Sewer pipe & ALLOWED. Safety Shoe, PM/Engineer/
manhole (cont') Uncontrolled
Cave in / collapse 1 3 3 Specific PPE to Site supervisor/
excavation Any excavation trench more 1.2m needs
perform task Operator
to install support system if sloping/
e.g.: Earplug,
benching is not practical. Sheet pile shall
face shield
be use if applicable.
·, Soil, material or machinery must place at
least 1 meter from edoe. J

Conduct underground utilities detection Safety helmet,


(if required) Safety vest,
Safety Shoe,
Utilities mapping and piloting prior start Specific PPE to PM/Engineer/
Unidentified excavation.
Damage underground utilities 1 3 3 perform task Site supervisor/
underground utilities
Must get confirmation from M&E team e.g.: Earplug, Operator
and needs standing supervision. face shield
Doc No.: HSE-AVE3-F025
AS-SYAFF RESOURCES SDN BHD
Rev: 00
� HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL (HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
\""\n1tf R...--..,11 ......:-,

VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SDN BHD.
PROJECT TITLE

SEWERAGE WORKS
, ifo@&ti JSA 0013
1 ■·me 10/6/2023

PIC
NO WORK ACTIVITY HAZARD ZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
Supervisor needs to inspect work area
and make sure the clearance of
Safety helmet,
overhead cable
Safety vest,
All the overhead lines must be identify Safety Shoe,
prior start work and brieHy explain to the Specific PPE to PM/Engineer/
Striking overhead
Electrocution 1 3 3 backhoe operator, perform task Site supervisor/
cable
e.g.: Earplug, Operator
Only trained excavator operator is face shield
allowed,
Install goalpost/marking pole with height
Excavation Sewer pipe & limit sian to protect overhead cable.
manhole (cont')
Provide signalman/ banksman to control
machinery movement for congested Safety helmet,
area. Safety vest,
Safety Shoe,
Relevant certificate for operator. Specific PPE to PM/Engineer/
Struck by moving site
Moving machinery 1 3 3 perform task Site supervisor'/
machinery Segregate access between workers /
e.g.: Earplug, Operator
machinery.
face shield
Machinery side & rear mirror in order.
Wearina visible reflective vest.
All machinery/ tool needs to inspect
Safety helmet,
prior go inside work area.
Safety vest,
All ground personal cannot approach the Safety Shoe,
Laying Sewer pipe & pipe Workers hit/ struck by machinery unless eye contact has been Specific PPE to PM/Engineer/
3 Machinery movement 1 3 3 made with operator. perform task Site supervisor/
bedding machinery
e.g.: Earplug, Operator
Competent/ licensed/ trained machinery face shield
operator.
Machinery side & rear mirror in order.
AS-SYAFF RESOURCES SON BHD Doc No.: HSE-AVE3-F025
Rev: 00
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL (HIRARC)
.\.,....S,.fTR
. . --..•·11�.:;:�
-.
···
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
PROJECT TITLE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CH ERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SON BHD.

PIC
NO WORK ACTIVITY HAZARDZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
All excavation work needs to apply PTW
Provide safe access for go into
excavation area & emergency purpose.
Straight cut/ undermine excavation NOT
ALLOWED.
Safety helmet,
Any excavation trench more 1.2m needs Safety vest,
to install support system if sloping/ Safety Shoe, PM/Engineer/
Uncontrolled
Cave in / collapse of soil 1 3 3 benching is not practical. Sheet pile shall Specific PPE to Site supervisor/
excavation
be use if applicable. perform task Operator
e.g.: Earplug,
Covering soil to avoid direct landslide face shield
Laying Sewer pipe & pipe Soil, material or machinery must place at
bedding (cont') least 1 meter from edge.
Supervisor to ensure excavation area
.
safe before allow workers to enter the
work area
Safety helmet,
Wear suitable safety shoes/rubber boots Safety vest,
with steel toe & proper tread. Safety Shoe,
Specific PPE to PM/Engineer/
Uneven surface / Conduct housekeeping & material
Slip, trip & fall 1 2 2 perform task Site supervisor/
Scattered material arrangement.
e.g.: Earplug, Operator
Supervisor must ensure access to work face shield
area clear & no obstruction.
AS-SYAFF RESOURCES SDN BHD Doc No. : HSE-AVE3-F025
Rev: 00

\•-"i).tl R�•,.01:1..:n
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL (HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
PROJECT TITLE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CH ERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SON BHD.

SEWERAGE WORKS
IW@Mli JSA 0013
I ■·MW 10/6/2023

PIC
I
NO WORK ACTIVITY HAZARD ZARO CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
Safety helmet, ?

Safety vest,
Wear suitable type of dust mask. Safety Shoe, PM/Engineer/
Dust Inhalation of dust. 1 3 3 Specific PPE to Site supervisor/
Spray water at dry area to control dust. perform task Operator
e.g.: Earplug,
face shield
Buddy system to minimize repetitive Safety helmet,
work / heavy manual lifting. Safety vest,
Safety Shoe, PM/Engineer/
Improper manual Conduct exercise prior start work.
handling
Ergonomics injury / Back pain 1 2 2 Specific PPE to Site supervisor/
Wheel barrow shall be use on suitable perform task Operator
surface condition. e.g.: Earplug,
face shield

Wear proper PPE, safety Helmet, Shoe, Safety helmet,


Laying Sewer pipe & pipe Safety vest,
vest & gloves.
bedding (cont') Safety Shoe,
Cover all sharp object where applicable. Specific PPE to PM/Engineer/
Sharp object /
Rotating cutter
Hand/Bodily injury 1 3 3 All rotating part of hand tools must have perform task Site supervisor/
proper guarding. e.g.: Earplug, Op�rator,
Conduct toolbox & emphasize regarding face shield
this hazard to workers involved.

Wear suitable safety shoes/rubber boots


with steel toe & proper tread. Safety helmet,
Conduct housekeeping & material Safety vest,
Muddy / slippery arrangement. Safety Shoe, PM/Engineer/
Slip, trip & fall 1 2 2 Specific PPE to Site supervisor/
surface/ swampy Supervisor must ensure access to work perform task Operator
area clear. e.g.: Earplug,
Lay crusher run for machinery access (if face shield
reauired)
AS-SYAFF RESOURCES SDN BHD Doc No.: HSE-AVE3-F025
Rev: 00
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL (HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TING KAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
PROJECT TITLE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CH ERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SDN BHD.

PIC
NO WORK ACTIVITY HAZARDZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
Wear proper PPE, safety Helmet, Shoe,
& vest. Safety helmet,
Safety vest,
Pinch point To wear semi leather gloves. Safety Shoe, PM/Engineer/
hazard/Caught in Hand or finger injuries. 1 3 3 Works to be conducted by trained Specific PPE to Site supervisor/
between workers. perform task Operator
e.g.: Earplug,
Conduct toolbox & emphasize regarding face shield
Laying Sewer pipe & pipe this hazard to workers involved
4
bedding (cont) Wear suitable safety shoes with proper
tread. Safety helmet,
Safety vest,
Conduct housekeeping & material Safety Shoe, PM/Engineer/
Scattered Material I arrangement.
Slip, trip & fall 2 2 4 Specific PPE to Site supervisor/
Uneven ground
Supervisor must ensure access to work perform task Operator
area clear & no obstruction. e.g.: Earplug,
face shield
Mark or barricade any obstruction.
Wear proper PPE, safety Helmet, Shoe,
& vest. Safety helmet,
Safety vest,
Pinch point To wear semi leather gloves. Safety Shoe, PM/Engineer/
5 Installation of manhole hazard/Caught in Hand or finger injuries. 1 3 3 Works to be conducted by trained Specific PPE to Site supervisor/
between workers. perform task Operator
e.g.: Earplug,
Conduct toolbox & emphasize regarding face shield
this hazard to workers involved
AS-SYAFF RESOURCES SON BHD Doc No.: HSE-AVE3-F025
Rev:00

h-\uU R("',11\:h·.:1
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL (HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
PROJECT TITLE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CH ERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SDN BHD.

fo@iiii 9•51, 10/6/2023


-- ·- - - -- - -

SEWERAGE WORKS
, ■
JSA 0013 1
1
PIC
NO WORK ACTIVITY HAZAROZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
Wear suitable safety shoes with proper
tread. Safety helmet,
Safety vest,
Conduct housekeeping & material Safety Shoe, PM/Engineer/
Scattered Material / arrangement.
Slip, trip & fall 2 2 4 Specific PPE to Site supervisor/
Uneven ground
Supervisor must ensure access to work perform task Operator
area clear & no obstruction. e.g.: Earplug,
face shield
Mark or barricade anv obstruction.
In any condition out rigger must fully
extend before operate.
All outrigger need to attach with steel
plate
Improper parking of
Make good I compact all soft ground
crane or machine /
Installation of manhole Crane or machine collapse 1 3 3 area before park
not solid ground
(cont)
foundation Operator / lifting supervisor need to
inspect ground condition at working area
prior start work.
Valid PMA & DOSH certificate and valid
JPJ drivino license f o r ooerator.
All lifting gear must be inspected prior
start work.
Make sure lifting gear capable to take
Improper lifting load & used the right lifting gear.
method I not Loss load / lifting fail 1 4 4
approved lifting gear Lifting supervisor to supervise lifting
activity.
Lifting supervisor to brief lifting activities
to liftinq team
AS-SYAFF RESOURCES SDN BHD Doc No.: HSE-AVE3-F025
Rev: 00
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL (HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TING KAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
PROJECT TITLE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CH ERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SDN BHD.

PIC
NO WORK ACTIVITY HAZARD ZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
Provide tag line to control load during
lifting.
Safety helmet,
Exclusion zone shall be established
Safety vest,
Movement load I Workers are prohibited to be underneath Safety Shoe, PM/Engineer/
Workers struck I crushed by
wrong position during 1 3 3 the load during lifting. Specific PPE to Site supervisor/
load
lifting perform task Operator
To apply PTW from SHE department if e.g.: Earplug,
load more than 1 0tonne face shield
Trained slinger I rigger to carry slinging
Installation of manhole
activity.
(cont)
Provide banksman to control movement
not hit during lifting work. Safety helmet,
Conduct pre task talk prior start work & Safety vest,
emphasize regarding this hazard to all Safety Shoe, PM/Engineer/
Limited access/ Hit the workers and other
1 3 3 worker. Specific PPE to Site supervisor/
constraint area properties
perform task Operator
Follow/ refer to approved Method e.g.: Earplug,
Statement fiow face shield

Supervisor needs to inspect work area


and make sure the clearance of
overhead cable Safety helmet,
Safety vest,
All the overhead lines must be identify Safety Shoe,
prior start work and briefiy explain to the Specific PPE to PM/Engineer/
Striking overhead
6, Backfilling Electrocution 1 3 3 backhoe operator, perform task Site supervisor/
cable
e.g.: Earplug, Operator
Only trained excavator operator is face shield
allowed.
Install goalpost /marking pole with height
limit sign to protect overhead cable.
Doc No.: HSE-AVE3-F025
AS-SYAFF RESOURCES SON BHD
Rev: 00
� HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL (HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
\ -\ull R,._"',,11,ui,:,;--.

VALLEY, BANDAR TUN HUSSEIN ONN, MU.KIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SON BHD.
PROJECT TITLE

SEWERAGE WORKS
I iifaMMii JSA 0013 1 ■·me 10/6/2023

PIC
1

NO WORK ACTIVITY HAZARD ZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
Provide signalman / banksman to control
machinery movement for congested Safety helmet,
area. Safety vest,
Safety Shoe,
Relevant certificate for operator. Specific PPE to PM/Engineer/
Struck by moving site
Moving machinery 1 3 3 perform task Site supervisor/
machinery Segregate access between workers /
e.g.: Earplug, Operator
machinery.
face shield
Machinery side & rear mirror in order.
WearinQ visible reflective vest.
Wear suitable safety shoes/rubber boots
with steel toe & proper tread. Safety helmet,
Conduct housekeeping & material Safety vest,
arrangement. Safety Shoe, PM/Engineer/
Muddy I slippery
Backfilling (Cont) Slip, trip & fall 1 2 2 Specific PPE to Site supervisor/
surface/ swampy Supervisor must ensure access to work perfom, task Operator
area clear. e.g.: Earplug,
Lay crusher run for machinery access (if face shield
reauired)
All excavation work needs to apply PTW
Provide safe access for go into Safety helmet,
excavation area & emergency purpose. Safety vest,
Safety Shoe, PM/Engineer/
Uncontrolled Ensure backfilling area shall be safe
Cave in / collapse 1 3 3 Specific PPE to Site supervisor/
backfilling from any
perfom, task Operator
Supervision by supervisor during the e.g.: Earplug,
activity. face shield
AS-SYAFF RESOURCES SDN BHD Doc No.: HSE-AVE3-F025
Rev:00
HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL (HIRARC)
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RU MAH TERES 2 TINGKAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
PROJECT TITLE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SON BHD.

PIC
NO WORK ACTIVITY HAZARDZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
Safety helmet,
Conduct toolbox talk & emphasize Safety vest,
regarding this hazard to all worker. Safety Shoe, PM/Engineer/
Lightning strike can cause
Bad Weather 1 4 4 Specific PPE to Site supervisor/
whole body burnt or fatality All outdoor & external work shall be stop perform task Operator
during thunderstorms & heavy rain. e.g.: Earplug,
face shield
Buddy system to minimize repetitive Safety helmet,
work/ heavy manual lifting. Safety vest,
Safety Shoe, PM/Engineer/
Improper manual Conduct exercise/ stretching prior start
Ergonomics injury / Back pain 1 2 2 Specific PPE to Site supervisor/
handling work.
perform task Operator
General (cont') Wheel barrow shall be use on suitable e.g.: Earplug,
surface condition. face shield
Wear suitable safety shoes with proper
tread.
Safety helmet,
Conduct housekeeping & material Safety vest,
arrangement. Safety Shoe, PM/Engineer/
Scattered Material /
Slip, trip & fall 2 2 4 Specific PPE to Site supervisor/
Uneven ground Supervisor must ensure access to work
perfonm task Operator
area clear & no obstruction.
e.g.: Earplug,
Mark or barricade any obstruction. face shield
Doc No. : HSE-AVE3-F025
AS-SYAFF RESOURCES SDN BHD
Rev: 00
� HAZARD IDENTIFICATION RISK ASSESSMENT RISK CONTROL {HIRARC)
.\:-.....,?,� �"-"':'��;.. -:.
CADANGAN MEMBINA DAN MENYIAPKAN 79 UNIT RUMAH TERES 2 TING KAT DAN 1 UNIT PENCAWANG ELEKTRIK DI AVENUE 3 (FASA 2 ZON 13) LAKE
VALLEY, BANDAR TUN HUSSEIN ONN, MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR DARUL EHSAN UNTUK TETUAN UDA LAND SON BHD.
PROJECT TITLE

SEWERAGE WORKS -
------ ------' IW@dii JSA 0013
1 ■·we I0/6/2023

PIC
1

NO WORK ACTIVITY HAZARLlZARD CAUSE/EFFECT LIKELIHOOD SEVERITY RISK RATING RECOMMEND CONTROLS MEASURES PPE REQUIRED (DUE DATE/
STATUS)
All night work activity must get approval
permit from local authority & client.
Standby backup lighting in case of power
/ existing tower light failure
Workers must have enough rest and
physically fit to conduct night work Safety helmet.
All area needs to receive background & Safety vest,
task lighting from 2 directions. Safety Shoe, PM/Engineer/
General (cont') Nightwork Poor Visibility 2 3 6 Specific PPE to Site supervisor/
Provide lighting for access & work area perform task Operator
All machinery needs to equip with e.g.: Earplug,
warning light and all lamps in orders. face shield
Provide high visibility vest with reflective.
Minimum lighting provides 50 lux for
access & 100 lux for all working area,
dangerous opening & lifting or lowering
activity