STEPS
1.1 LOCATION

FORCE MAIN AREA BEARING


506 m 760458 sq m 52° 41' 40.1"

SERVED HOUSES 490 HOUSE PS


M1

2.2 NETWORK INFORMATION


LENGTH QMAX INPIPE D INPL SLOPE d/D MATERIA
11790 0.5 -0.28 0.14 0.56 UPVC

P77
P-431
L: 50.50
L: 40.50 P79 P80
S: 0.28 %
D: 1.25 m

S: 0.28 % L: 60.00 L: 51.50


S: 0.28 %
S77

S: 0.28 %
P83

P81
L: 46.50 Color Coding Legend

M 1SEWAGE
S: 0.28 %
P-432
L: 60.50 Link: Section Size Description
S: 0.28 %

S: 0.28 %
L: 45.50

L: 39.50
P84

S: 0.28 % P86
L: 55.00 315 mm
P-433 S: 0.28 % 250 mm
L: 44.00
P85 P87 400mm
S: 0.19 % P60 P55 L: 61.00 L: 48.00 500
L: 49.50 S: 0.28 %
L: 54.00
S: 0.19 %
S: 0.28 % 600
S: 0.19 %
700
S: 0.28%

S: 0.14%
L: 53.00

L: 59.50
P54
P71

S: 0.28 %

P109
L: 58.00
P56

P108 L: 61.00
L: 53.00 S: 0.28 %
S: 0.28 %
P110
L: 57.00
S: 0.14 %

S: 0.28 %
L: 49.50
P-409

S: 0.28%
L: 55.00
P107
S: 0.28 %
L: 58.00
P72

P-430
L: 46.50
S: 0.27 %
P111
L: 56.50
S: 0.27%

S: 0.27 %
L: 52.00
P106

P52
S: 0.28%

S: 0.28%
L: 57.50

P69
L: 61.50
P73

L: 12.50
P58

L: 52.00
S: 0.14%

S: 0.13 %
L: 21.00
P88

S: 0.28 %
P105
P103 L: 60.50
L: 60.50 S: 0.26 %
S: 0.30 %

P93
P96
L: 59.00
S: 0.28%

S: 0.28%
L: 45.00
L: 55.50

P-408
P-406

L: 59.00
S: 0.28 %
S: 0.28 %
S: 0.28%
L: 60.50
P97
S: 0.28 %

S: 0.28%
L: 48.50

L: 55.00
P-405

P90

P99
L: 61.50
S: 0.28 %

Page 1
Sheet1

AL- QIBLA PROJECT FOR SEWER AND ROAD WORKS


COMPANY :ALNARJESS COMPANY
CALCULATED BY SABA BERUEA, TAHIR J.

3.1 HOUSES 490 HOUSE


P0PULATION 10290 CAPTA
Q= 12780.18 M3/DAY
532.5075 M3/HR
8.875125 M3/MIN
0.14791875 M3/SEC
4.1 WETWELL DIMENSIONS
W= 2.9 M
L= 2.9 M
AREA= 8.41 M2
pump Q= 4.4375625 M3/MIN
C= 10
T= 6 MIN
V= 6.65634375 M3
Hactive= 0.7914796373 m
L MIN 1M
S= 0.2 M
H= 5.4214796373 M
Pcase= 0.6 m
Wmin= 2.1 m ok
B distance= 1.4 m
Lmin= 2.1 m ok
so the tank dim ok
5.1 LEVELS
SUMBL= -2.271 M
RoofL= 3.65 M
INPINV= -0.28 M
INPCRWN= 0.22 M
AvlbleWL= -0.28 M
IPd/D L= 0M
max WL= 0.095 M PUMP OK
6.1 FILL-EMPTY TIMES
FILL TIME= 2.2424578527 MIN
EMPTY ONE PUMP OPERATE= 3.7742214898 MIN
EMPTY 2 PUMP OPERATE= 1.8871107449 MIN USE SINGLE OPERATE
7.1 PUMPS OPERATE LEVELS
ALL PUMPS OF LVEL= -1.0714796373 M
1ST PUMP ON=