Station Left Right


Centre line BS IS FS HI Corrected RL Remarks
Pts offsets offsets

TBM-2 1.608 1311.214 1309.606


0+000 0.978 1310.236
TP-1 0+015 2.217 1.189 1312.242 1309.990
5 2.744 1309.498
5 1.588 1310.654
10 0.999 1311.243
10 2.774 1309.468
0+030 2.445 1309.797
5 2.725 1309.517
5 2.735 1309.507
10 3.198 1309.044
10 2.22 1310.022
15 3.288 1308.954
TP-2 1.77 2.445 1311.567 1309.728
0+041.799 1.899 1309.668 BC1
5 1.933 1309.634
5 2.059 1309.508
10 1.529 1310.038
10 2.858 1308.709
15 1.118 1310.449
0+064.302 1.52 1310.047 MC1
5 1.172 1310.395
10 0.941 1310.626
5 1.701 1309.866
10 2.547 1309.020
TP-3 0+086.802 1.641 1.282 1311.926 1310.181 EC1
5 1.567 1310.359
5 1.698 1310.228
10 1.403 1310.523
10 1.829 1310.097
0+103.779 2.809 1309.117 BC2
5 2.676 1309.250
5 2.868 1309.058
10 2.889 1309.037
10 2.79 1309.136
0+117.158 3.76 1308.166 MC2

Survey Camp Report - 072 Page 101


Group - 4
5 3.661 1308.265
5 1.869 1310.057
Station Left Right
Centre line BS IS FS HI Corrected RL Remarks
Pts offsets offsets

TP-4 0.602 2.887 1309.641 1308.900


0+130.538 2.161 1307.480 EC2
5 2.184 1307.457
10 2.272 1307.369
5 1.84 1307.801
10 1.689 1307.952
TP-5 1.06 2.78 1307.921 1306.688
A 0+150.995 2.89 1304.823 A

B 0+215.581 2.087 1306.903 1304.815 B


5 1.9 1305.003
10 1.972 1304.931
5 2.32 1304.583
10 2.36 1304.543
TP-7 2.512 0.915 1308.500 1305.979
TP-8 2.45 0.742 1310.208 1307.741
0+225 3.088 1307.120
5 3.445 1306.763
10 3.408 1306.800
5 3.1 1307.108
10 3.34 1306.868
0+232.230 1.72 1308.488 BC3
5 1.96 1308.248
10 1.948 1308.260
5 1.868 1308.340
10 2.15 1308.058
TP-9 2.733 0.725 1312.216 1309.458
0+245.548 1.882 1310.334 MC3
5 0.856 1311.360
5 2.62 1309.596
10 3.395 1308.821
10 0.632 1311.584
0+258.865 0.663 1311.553 EC3
TP-10 2.285 0.634 1313.867 1311.549
5 1.52 1312.347
10 1.222 1312.645
5 3.247 1310.620
10 4.622 1309.245
TP-11 0.91 1.491 1313.286 1312.334
1.356 1311.930
1.452 1311.834

Survey Camp Report - 072 Page 102


Group - 4
Station Left Centre line Right BS IS FS HI Corrected RL Remarks
Pts offsets offsets

TP-12 0+270 0.84 1.538 1312.588 1311.698


5 0.41 1312.178
9 0.222 1312.366
15 0.255 1312.333
6 1.892 1310.696
10 2.505 1310.083
0+285 1.228 1311.360
4 0.912 1311.676
6 0.242 1312.346
5 1.632 1310.956
10 2.512 1310.076
1.533 1311.055
0+300.4 1.117 1311.471 BC4
2 1.913 1310.675
9 2.47 1310.118
16 3.81 1308.778
TP-13 2.115 1.643 1313.060 1310.887
3 0.43 1312.630
5 0.11 1312.950
TP-14 0.92 0.99 1312.990 1312.004
0+329.848 1.255 1311.735 MC4
2.878 1310.112
TP-15 1.04 2.91 1311.120 1310.006
0+359.296 1.528 1309.592 EC4
1.813 1309.307
0+375 1.715 1309.405
5 2.105 1309.015
10 2.755 1308.365
7 1.673 1309.447
10 1.295 1309.825
TP-16 0.995 1.651 1310.464 1309.386
0+390 1.608 1308.856
5 1.972 1308.492
10 2.62 1307.844
5 1.22 1309.244
10 0.426 1310.038
0+399.951 2.21 1308.254 BC5
5 2.745 1307.719
10 3.305 1307.159
5 1.817 1308.647
6 0.855 1309.609
10 0.921 1309.543

Survey Camp Report - 072 Page 103


Group - 4
2.554 1307.910

Station Left Right


Centre line BS IS FS HI Corrected RL Remarks
Pts offsets offsets

TP-17 0.175 2.465 1308.174 1307.908


0+419.744 0.452 1307.722 MC5
5 0.87 1307.304
10 2.395 1305.779
6 0.25 1307.924
8 0.232 1307.942
1.675 1306.499
0+439.537 2.735 1305.439 EC5
5 2.975 1305.199
10 3.252 1304.922
4 2.47 1305.704
13 2.128 1306.046
TP-18 0.73 1.95 1306.954 1306.125
0+454.714 2.44 1304.514 BC6
4 2.81 1304.144
10 2.362 1304.592
2 2.18 1304.774
8 3 1303.954
12 3.272 1303.682
TP-19 0.522 1.905 1305.571 1304.942
1.905 1303.666
2.265 1303.306
0+474.702 2.36 1303.211 MC6
4 2.322 1303.249
10 2.59 1302.981
5 2.45 1303.121
10 2.265 1303.306
TP-20 0.66 1.91 1304.321 1303.545
TP-21 0.714 1.013 1304.022 1303.184
0.863 1303.159
2.043 1301.979
0+494.691 2.466 1301.556 EC6
4 2.413 1301.609
9 1.385 1302.637
5 2.974 1301.048
10 2.882 1301.140
TP-22 0.618 2.01 1302.630 1301.880
0+501.925 1.403 1301.227 BC7
1.83 1300.800
0+520.803 3.282 1299.348 MC7
5 3.86 1298.770
10 3.55 1299.080

Survey Camp Report - 072 Page 104


Group - 4
4 2.684 1299.946
10 1.68 1300.950

Station Left Right


Centre line BS IS FS HI Corrected RL Remarks
Pts offsets offsets

TP-23 0.715 3.69 1299.655 1298.800


0+539.681 2.91 1296.745 EC7
5 3.02 1296.635
10 2.84 1296.815
5 2.429 1297.226
10 2.329 1297.326
3.991 1295.664
TP-24 0.925 3.745 1296.835 1295.762
0+557.283 2.406 1294.429 BC8
3 2.947 1293.888
10 2.847 1293.988
5 2.478 1294.357
10 3.314 1293.521
TP-25 0.855 3.507 1294.183 1293.171
1.815 1292.368
0+604.283 2.855 1291.328 MC8
5 2.755 1291.428
10 2.788 1291.395
5 2.582 1291.601
10 2.678 1291.505
TP-26 0.851 2.583 1292.451 1291.435
2.164 1290.287
3.172 1289.279
0+611.283 2.98 1289.471 EC8
5 3.775 1288.676
10 3.725 1288.726
5 2.788 1289.663
10 2.385 1290.066
TP-27 1.028 3.384 1290.095 1288.894
0.994 1289.101
2.468 1287.627
0+645 2.452 1287.643
5 2.429 1287.666
5 2.5 1287.595
0+660 2.879 1287.216
5 2.844 1287.251
5 2.85 1287.245
10 2.801 1287.294
20 2.402 1287.693
30 2.4 1287.695

Survey Camp Report - 072 Page 105


Group - 4
40 2.399 1287.696
50 1.977 1288.118
60 1.955 1288.140
10 2.86 1287.235
20 2.976 1287.119
30 3.306 1286.789

Station Left Right


Centre line BS IS FS HI Corrected RL Remarks
Pts offsets offsets

TP-28 2.812 1.693 1291.214 1288.221


0+689.092 2.111 1289.103 BC9
5 2.815 1288.399
10 3.163 1288.051
5 2.113 1289.101
10 1.893 1289.321
0+701.866 0.315 1290.899 MC9
TP-29 3.575 0.958 1293.831 1290.066
0+714.64 1.62 1292.211 EC9
TP-30 2.258 0.484 1295.605 1293.149
End Pt. 0.685 1295.582 1294.714

Survey Camp Report - 072 Page 106


Group - 4
Tribhuvan University
Institute Of Engineering
Central Campus, Pulchowk
Department of Civil Engineering
Survey Instruction Committee
RL Transfer for Road Chainage

Station Chainage BS FS HI RL Corrected RL Total Error Correction factor Correction


TBM-2 1.608 1311.214 1309.606 1309.606
TP-1 0+015 2.217 1.189 1312.242 1310.025 1309.990 1 0.0346666667
TP-2 0+045 1.77 2.445 1311.567 1309.797 1309.728 2 0.0693334
TP-3 0+086.802 1.641 1.282 1311.926 1310.285 1310.181 Error = -0.208 3 0.1040001
TP-4 0.602 2.887 1309.641 1309.039 1308.900 4 0.1386668
TP-5 1.06 2.78 1307.921 1306.861 1306.688 5 0.1733335
A 2.89 1305.031 1304.823 6 0.2080002

B 2.087 1306.9025 1304.8155 1304.815 0.0082195122


TP-7 2.512 0.915 1308.4995 1305.9875 1305.979 1 0.0082195122
TP-8 2.45 0.742 1310.2075 1307.7575 1307.741 2 0.0164390244
TP-9 2.733 0.725 1312.2155 1309.4825 1309.458 3 0.0246585366
TP-10 2.285 0.634 1313.8665 1311.5815 1311.549 4 0.0328780488
TP-11 0.91 1.491 1313.2855 1312.3755 1312.334 5 0.041097561
TP-12 0+270 0.84 1.538 1312.5875 1311.7475 1311.698 6 0.0493170732
TP-13 2.115 1.643 1313.0595 1310.9445 1310.887 7 0.0575365854
TP-14 0.92 0.99 1312.9895 1312.0695 1312.004 8 0.0657560976
TP-15 1.04 2.91 1311.1195 1310.0795 1310.006 9 0.0739756098
TP-16 0.995 1.651 1310.4635 1309.4685 1309.386 10 0.082195122
TP-17 0.175 2.465 1308.1735 1307.9985 1307.908 11 0.0904146341
TP-18 0.73 1.95 1306.9535 1306.2235 1306.125 Error = 0.337 12 0.0986341463
TP-19 0.522 1.905 1305.5705 1305.0485 1304.942 13 0.1068536585
TP-20 0.66 1.91 1304.3205 1303.6605 1303.545 14 0.1150731707

Survey Camp Report - 072 Page 107


Group - 4
Error = 0.337

TP-21 0.714 1.013 1304.0215 1303.3075 1303.184 15 0.1232926829


TP-22 0.618 2.01 1302.6295 1302.0115 1301.880 16 0.1315121951
TP-23 0.715 3.69 1299.6545 1298.9395 1298.800 17 0.1397317073
TP-24 0.925 3.745 1296.8345 1295.9095 1295.762 18 0.1479512195
TP-25 0.855 3.507 1294.1825 1293.3275 1293.171 19 0.1561707317
TP-26 0.851 2.583 1292.4505 1291.5995 1291.435 20 0.1643902439
TP-27 1.028 3.384 1290.0945 1289.0665 1288.894 21 0.1726097561
TP-28 2.812 1.693 1291.2135 1288.4015 1288.221 22 0.1808292683
TP-29 3.575 0.958 1293.8305 1290.2555 1290.066 23 0.1890487805
TP-30 2.258 0.484 1295.6045 1293.3465 1293.149 24 0.1972682927
End Pt. 0.662 0.685 1295.5815 1294.9195 1294.714 25 0.2054878049
TP-1 2.853 1.568 1296.8665 1294.0135 1293.800 26 0.2137073171
TP-2 1.71 1.743 1296.8335 1295.1235 1294.902 27 0.2219268293
TP-3 2.81 1.825 1297.8185 1295.0085 1294.778 28 0.2301463415
TP-4 2.833 2.41 1298.2415 1295.4085 1295.170 29 0.2383658537
TP-5 2.355 2.515 1298.0815 1295.7265 1295.480 30 0.2465853659
TP-6 2.58 0.785 1299.8765 1297.2965 1297.042 31 0.254804878
TP-7 2.275 1.786 1300.3655 1298.0905 1297.827 32 0.2630243902
TP-8 2.298 0.623 1302.0405 1299.7425 1299.471 Error = 0.337 33 0.2712439024
TP-9 2.573 0.627 1303.9865 1301.4135 1301.134 34 0.2794634146
TP-10 2.728 0.675 1306.0395 1303.3115 1303.024 35 0.2876829268
TP-11 1.35 2.37 1305.0195 1303.6695 1303.374 36 0.295902439
TP-12 1.74 2.796 1303.9635 1302.2235 1301.919 37 0.3041219512
TP-13 0.573 1.918 1302.6185 1302.0455 1301.733 38 0.3123414634
TP-14 2.94 0.883 1304.6755 1301.7355 1301.415 39 0.3205609756
TP-15 2.232 0.63 1306.2775 1304.0455 1303.717 40 0.3287804878
B 1.125 1305.1525 1304.816 41 0.337

Survey Camp Report - 072 Page 108


Group - 4
stn BS FS
end pt 0.662
TP1 2.853 1.568
TP2 1.71 1.743
TP3 2.81 1.825
TP4 2.833 2.41
TP5 2.355 2.515
TP6 2.58 0.785
TP7 2.275 1.786
TP8 2.298 0.623
TP9 2.573 0.627
TP10 2.728 0.675
TP11 1.35 2.37
TP12 1.74 2.796
TP13 0.573 1.918
TP14 2.94 0.883
TP15 2.232 0.63
B 1.125

34.512 24.279
ht diff= 10.233

Survey Camp Report - 073 Page 109