You are on page 1of 1

Dear Sir/Madam

As per attached drawing, we have design and executed POST TENSION work of following pours of
Shree Cement project at Raipur.

POUR NO
ST
1 FLOOR 1 2 3 4 5 7
2ND FLOOR 10 12 13 14 ------------- --------------

We stand guarantee for the same

Thanks/Regards

U.H. Bhujbalrao

You might also like