Sr TEST DESCRIPTION STATUS

1 Edge beam (F section anchorage) test Test successful, report received


from ghatkopar lab
2 Shear stud test Test unsuccessful due to high
phosphor contain. Tomorrow
repeat test will conduct on new
sample
3 Neoprene test Sample size was not
appropriate. Required
specification noted. Tomorrow
test will be conduct on new
sample. Min 20 days will be
required for test report
4 Ultrasonic test Contacted to NDT agency.
Tomorrow test will be
conducted and immediate
report will received
5 Epoxy Paint certificate: Out of 3 certificates one
1. Epoxy primer received. Remaining will be
2. High build epoxy received tomorrow
3.Finish paint
6 Sand blasting MOU with vendor Contacted to respective person.
Tomorrow Mr. Gupta will meet
and obtain MOU
7 1.Cyclic motion test Test report sample required.
2.Ponding test Rao sir supposed to arrange it
3.Debris Expelling test from Mr Naveen